Tender Details

Particulars Details
Title
Widening And Strengthening Work In Chainage 0.000 To 18.800 Of Atarra Oran Chausad Road Length 18.800 Km Utility Shifting Work Of Removal Of Electric Poles Etc
Description
Widening And Strengthening Work In Chainage 0.000 To 18.800 Of Atarra Oran Chausad Road Length 18.800 Km Utility Shifting Work Of Removal Of Electric Poles Etc
Organisation Chief Engineer Jhansi Zone PWD Jhansi UP | State Govt. and UT
Tender Id 2025_CEJNS_1040102_1
Reference
Number
1245/35C-Banda Circle/2024-25 Dt. 18-03-2025
Tender Fee 2720
EMD 19.5 Lakh
Tender Value
Place BANDA
Link
View Original Tender Notice

https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1891229

Start Date May 24, 2025 16:30
End Date
Expired 30/05/2025

Expired 417 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Tender for constr impvt of extng rd sktt cl 9 to nhdl specn fm extng km 40pt00 to km 70pt00 design chainage km 40pt00 to km 68pt40 net length 28pt40 km on epc mode under pjt dpk in hp

Tender for constr impvt of extng rd sktt cl 9 to nhdl specn fm extng km 40pt00 to km 70pt00 design chainage km 40pt00 to km 68pt40 net length 28pt40 km on epc mode under pjt dpk in hp

Read more
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp

Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp

Read more
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Read more
Strengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram

Strengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram

Read more
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham

Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham

Read more
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode

Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode

Read more
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode

Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode

Read more
Utility shifting (removal of electric poles etc.) work in the work of widening and strengthening of banda-naraini-kalinjar road (state highway no.-113) from chainage 8.000 to 20.000.

Utility shifting (removal of electric poles etc.) work in the work of widening and strengthening of banda-naraini-kalinjar road (state highway no.-113) from chainage 8.000 to 20.000.

Read more
Work of utilifty shifting (removing of electricity poles etc.) at widening and strengthening of baberu tindwari sumerpur road (sh-134) from chainage 64.020 to 80.270 (length-16.250 km.)

Work of utilifty shifting (removing of electricity poles etc.) at widening and strengthening of baberu tindwari sumerpur road (sh-134) from chainage 64.020 to 80.270 (length-16.250 km.)

Read more
Utility shifting (shifting of electric poles, transformers etc) in the work of widening and strengthening of karwi budha rajapur road (odr) in ch. 1.500 to 28.410 of in chitrakoot district.

Utility shifting (shifting of electric poles, transformers etc) in the work of widening and strengthening of karwi budha rajapur road (odr) in ch. 1.500 to 28.410 of in chitrakoot district.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise