Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Widening And Strengthening Work Of Motigarpur Dostpur Road (Other District Road) From Chainage 0.000 To 16.200 Km
|
| Description |
Boq
|
| Organisation | Chief Engineer PWD Faizabad Zone | State Govt. and UT |
| Tender Id | 2025_CEUFZ_1093953_1 |
|
Reference Number |
3464/1Com-Sul.A.Cir/2025-26 Date-15.10.2025 |
| Tender Fee | 2714 |
| EMD | 48 Lakh |
| Tender Value | |
| Place | SULTANPUR |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2011152 |
| Start Date | November 26, 2025 22:00 |
| End Date |
Expired
05/12/2025
Expired 189 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Road safety work of dariyapur dostpur gangerua khetalpur bhansauli road (odr) from ch. 0.000 to 5.400
Road safety work of dariyapur dostpur gangerua khetalpur bhansauli road (odr) from ch. 0.000 to 5.400
Read moreWork of widening and strengthening of nyay marg (kachhari road). district basti
Work of widening and strengthening of nyay marg (kachhari road). district basti
Read moreConstruction / improvement of existing cl-9 road to nhdl (ps) specifications with paved shoulder from muguthang of design chainage km 0.000 to naku of design chainage km 11.755 (total design length 11.755 km) nh-310 ag in the state of sikkim
Construction / improvement of existing cl-9 road to nhdl (ps) specifications with paved shoulder from muguthang of design chainage km 0.000 to naku of design chainage km 11.755 (total design length 11.755 km) nh-310 ag in the state of sikkim
Read moreRejinagar - sarbangapur road from chainage 0.00 kmp. to 0.50 km. and 5.50 km. to 8.00 kmp. (in stretches) repairing work under murshidabad highway division no.i. in the district of murshidabad during 2026-27
Rejinagar - sarbangapur road from chainage 0.00 kmp. to 0.50 km. and 5.50 km. to 8.00 kmp. (in stretches) repairing work under murshidabad highway division no.i. in the district of murshidabad during 2026-27
Read moreSilt clearance of lalpur sathni drain from km 0.000 to km 8.700
Silt clearance of lalpur sathni drain from km 0.000 to km 8.700
Read moreSection repair work between km 0.000 to km 0.230 of bansi bankata bund at right bank of rapti river
Section repair work between km 0.000 to km 0.230 of bansi bankata bund at right bank of rapti river
Read moreWork on nh13 from km 957.56 to km 997.76 and from km 854.808 to km 871.928
Stmc work on nh13 from km 957.56 to km 997.76 and from km 854.808 to km 871.928
Read moreRehabilitation and strengthening of a road from chokpot to kharukol via warima, kenegre, paromgre, nokatgre, meghalaya length 46.080 km under nesids roads
Rehabilitation and strengthening of a road from chokpot to kharukol via warima, kenegre, paromgre, nokatgre, meghalaya length 46.080 km under nesids roads.
Read morePart design and construction of elevated viaduct and 10 nos of elevated stations for extension projects of nmrcs aqua line from botanical garden to noida sec-142 (from chainage (-) 383.959 to 12130.143) and from depot station to boraki mmth (chainage
Part design and construction of elevated viaduct and 10 nos of elevated stations for extension projects of nmrcs aqua line from botanical garden to noida sec-142 (from chainage (-) 383.959 to 12130.143) and from depot station to boraki mmth (chainage
Read moreGeneral budget 2024.25 20percentage concreate pavement construction at kailasam pendaanampadi road between km. 0.000 to 0.755
General budget 2024.25 20percentage concreate pavement construction at kailasam pendaanampadi road between km. 0.000 to 0.755
Read moreof your Industry type