Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Laying, Jointing, Shifting And Dismantling Of 10 12 Inch (250 And 300 Mm) Diameter Ms And Lay Flat Pipeline, For Dewatering From Active Coal Faces And Various Sumps For 730 Days As And When Required At Bina Project
|
| Description |
Laying, Jointing, Shifting And Dismantling Of 10 12 Inch (250 And 300 Mm) Diameter Ms And Lay Flat Pipeline, For Dewatering From Active Coal Faces And Various Sumps For 730 Days As And When Required At Bina Project
|
| Organisation | Northern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2026_NCL_358080_1 |
|
Reference Number |
B/EM/eTender/2026-27/04 Dt. 06-04-2026 |
| Tender Fee | 0 |
| EMD | 47800 |
| Tender Value | - |
| Place | Bina Project |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=370960 |
| Start Date | April 08, 2026 14:30 |
| End Date |
Expired
20/04/2026
Expired 131 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Dismantling and laying of 250/300mm diameter ms pipeline in main sump turra and purewa bottom coal face for 730 days as when required at bina project.
Dismantling and laying of 250/300mm diameter ms pipeline in main sump turra and purewa bottom coal face for 730 days as when required at bina project.
Read moreCarrying out the structural steel work in all sections of chp, bina project (ncl) on as and when required basis within 730 days.
Carrying out the structural steel work in all sections of chp, bina project (ncl) on as and when required basis within 730 days.
Read moreDismantling and repairing of 150 gpm kirloskar brothers make diesel engine water pump for dewatering coal faces approach as when required at akkocp mines bnk area
Dismantling and repairing of 150 gpm kirloskar brothers make diesel engine water pump for dewatering coal faces approach as when required at akkocp mines bnk area
Read moreMajor yard cleaning work including spray of weed killer in active and non-active area of yard at bina 400 kv substation under 400 kv testing dn. bina.
Major yard cleaning work including spray of weed killer in active and non-active area of yard at bina 400 kv substation under 400 kv testing dn. bina.
Read moreDay to day maintenance work of pumps and pipelines for dewatering of sumps and coal faces, dust suppression and tanker loading for a period of 02 years at socp, ib valley area
Day to day maintenance work of pumps and pipelines for dewatering of sumps and coal faces, dust suppression and tanker loading for a period of 02 years at socp, ib valley area
Read moreDismantling and laying of 150/200mm dia ms pipeline for turra coal face pumps and purewa bottom coal face pumps for 730 days as when required at bina project.
Dismantling and laying of 150/200mm dia ms pipeline for turra coal face pumps and purewa bottom coal face pumps for 730 days as when required at bina project.
Read moreSilt clearance from miv floor and dewatering sumps at 105 mw (3x35) ushp-ii, kangan hep
Silt clearance from miv floor and dewatering sumps at 105 mw (3x35) ushp-ii, kangan hep
Read moreEstimate for laying ac pressure pipeline including sumps for dewatering the flood water from village badarpur
Estimate for laying ac pressure pipeline including sumps for dewatering the flood water from village badarpur
Read moreProviding of dewatering pump sets at drain water collection sumps at rgss hospital, tahirpur delhi-110093
Providing of dewatering pump sets at drain water collection sumps at rgss hospital, tahirpur delhi-110093
Read moreDismantling / dis-assembling, re-erection, re-installation, setting and alignment of assemblies / sub-assemblies after repairing on as and when required basis within 730 days two years at chp, bina project
Dismantling / dis-assembling, re-erection, re-installation, setting and alignment of assemblies / sub-assemblies after repairing on as and when required basis within 730 days two years at chp, bina project
Read moreof your Industry type