Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Dismantling And Laying Of 250/300mm Diameter Ms Pipeline In Main Sump Turra And Purewa Bottom Coal Face For 730 Days As When Required At Bina Project.
|
| Description |
Dismantling And Laying Of 250/300mm Diameter Ms Pipeline In Main Sump Turra And Purewa Bottom Coal Face For 730 Days As When Required At Bina Project.
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_NCL_297160_1 |
|
Reference Number |
B/EM/eTender/2023-24/36 dated 28.12.2023 |
| Tender Fee | - |
| EMD | 37450 |
| Tender Value | - |
| Place | Office of Staff Officer (EM), Bina |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | December 30, 2023 14:30 |
| End Date |
Expired
16/01/2024
Expired 956 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Dismantling and laying of 250/300mm dia ms pipeline in main sump (turra) and purewa bottom coal face as when required during monsoon 2025 at bina project.
Dismantling and laying of 250/300mm dia ms pipeline in main sump (turra) and purewa bottom coal face as when required during monsoon 2025 at bina project.
Read moreDismantling and laying of 150/200mm dia ms pipeline for turra coal face pumps and purewa bottom coal face pumps for 730 days as when required at bina project.
Dismantling and laying of 150/200mm dia ms pipeline for turra coal face pumps and purewa bottom coal face pumps for 730 days as when required at bina project.
Read moreDi and extension of lt oh line in the mines area including turra and purewa bottom, outsourcing face lighting and lighting lines in dumping areas, haul roads as well as di of lt oh lines in service building as and when required at bina
Please refer tender documents.
Read moreProviding rcc retaining wall at south jhandiman to protect the ingress of silt into turra sump at bina project
Providing rcc retaining wall at south jhandiman to protect the ingress of silt into turra sump at bina project
Read moreProviding shelters for switch and transformer along with sitting arrangement and ob filled pvc bags at turra and purewa sump and providing gabion wall along north and south dump, at central entry, around main sumps and various other locations at bina
Providing shelters for switch and transformer along with sitting arrangement and ob filled pvc bags at turra and purewa sump and providing gabion wall along north and south dump, at central entry, around main sumps and various other locations at bina
Read moreCarrying out the structural steel work in all sections of chp, bina project (ncl) on as and when required basis within 730 days.
Carrying out the structural steel work in all sections of chp, bina project (ncl) on as and when required basis within 730 days.
Read moreLaying, jointing, shifting and dismantling of 10 12 inch (250 and 300 mm) diameter ms and lay flat pipeline, for dewatering from active coal faces and various sumps for 730 days as and when required at bina project
Laying, jointing, shifting and dismantling of 10 12 inch (250 and 300 mm) diameter ms and lay flat pipeline, for dewatering from active coal faces and various sumps for 730 days as and when required at bina project
Read more(a)shifting of 4000gpm pump motor set of jharna face sump as and when required(04times)for extraction of coal from the floor of the sump and(b)maintenance of 4000gpm pump of jharna face and purba face and their pipeline of muraidih, amp colliery
(a)shifting of 4000gpm pump motor set of jharna face sump as and when required(04times)for extraction of coal from the floor of the sump and(b)maintenance of 4000gpm pump of jharna face and purba face and their pipeline of muraidih, amp colliery
Read moreDismantling / dis-assembling, re-erection, re-installation, setting and alignment of assemblies / sub-assemblies after repairing on as and when required basis within 730 days two years at chp, bina project
Dismantling / dis-assembling, re-erection, re-installation, setting and alignment of assemblies / sub-assemblies after repairing on as and when required basis within 730 days two years at chp, bina project
Read moreof your Industry type