| Particulars | Details |
|---|---|
| Title |
(A)shifting Of 4000 Gpm Pump Motor Set Of Jharna Face Sump As And When Required(04times)for Extraction Of Coal From The Floor Of The Sump And(b)maintenance Of 4000 Gpm Pump Of Jharna Face And Purba Face And Their Pipeline Of Muraidih, Amp Colliery
|
| Description |
(A)shifting Of 4000 Gpm Pump Motor Set Of Jharna Face Sump As And When Required(04times)for Extraction Of Coal
From The Floor Of The Sump And(b)maintenance Of 4000 Gpm Pump Of Jharna Face And Purba Face And Their Pipeline
Of Muraidih, Amp Colliery
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2024_BCCL_297525_1 |
|
Reference Number |
BCCL/GM/AR-I/AM (ENM)/E-TENDER/2023-24/406 |
| Tender Fee | |
| EMD | 2800 |
| Tender Value | |
| Place | ENM DEPARTMENT, BARORA AREA |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | January 03, 2024 23:30 |
| End Date |
Expired
15/01/2024
Expired 919 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Shifting of 4000gpm pumpmotor set of jharna sump as and when required (03times) with its pipeline for extraction of coal from the floor of the sump and maintenance of 4000gpm pump of jharna face and purba face and their pipe line of muraidih, ampc.
Shifting of 4000gpm pumpmotor set of jharna sump as and when required (03times) with its pipeline for extraction of coal from the floor of the sump and maintenance of 4000gpm pump of jharna face and purba face and their pipe line of muraidih, ampc.
Read moreAssembling, transporting and installation of one 4000gpm pump motor set in purba face sump and erection of its delivery and shifting of a 4000gpm pump motor set from the damaged pontoon to ground level in jharna face sump at muraidih, amp colliery.
Assembling, transporting and installation of one 4000gpm pump motor set in purba face sump and erection of its delivery and shifting of a 4000gpm pump motor set from the damaged pontoon to ground level in jharna face sump at muraidih, amp colliery.
Read more(a) installation of 4000gpm pump motor in sadbhavna face sump and jointing of its delivery with the existing range and (b) maintenance of 4000gpm pumps of coal face, jharna face and purba face sump under amp colliery.
(a) installation of 4000gpm pump motor in sadbhavna face sump and jointing of its delivery with the existing 
 range and (b) maintenance of 4000gpm pumps of coal face, jharna face and purba face sump under amp colliery.
Read moreLowering of two ht pump motor of coal face sump and extension of its suction pipes, shifting of 4000gpm pump motor of jharna face and extension of its suction pipe of muraidih, amp colliery
Lowering of two ht pump motor of coal face sump and extension of its suction pipes, shifting of 4000gpm pump 
 motor of jharna face and extension of its suction pipe of muraidih, amp colliery
Read moreShifting of 4000gpm pump motor of jharna face for 04 times with gradual increasing of water level of the sump under muraidih, amp colliery.
Shifting of 4000gpm pump motor of jharna face for 
 04 times with gradual increasing of water level of the 
 sump under muraidih, amp colliery.
Read moreReplacing of b/d 4000gpm pump motor set by another 4000gpm pump motor set of purba face sump and three times shifting of pump along with diversion of its delivery line in suitable route for safety purpose at muraidih, amp colliery.
Replacing of b/d 4000gpm pump motor set by another 4000gpm pump motor set of purba face sump and three times shifting of pump along with diversion of its delivery line in suitable route for safety purpose at muraidih, amp colliery.
Read moreShifting of 4000gpm pump motor (three times) of jharna face sump and di of its pipe line due to gradual decreasing of water level at muraidih under amp colliery
Shifting of 4000gpm pump motor (three times) of jharna face sump and di of its pipe line due to gradual 
 decreasing of water level at muraidih under amp colliery
Read moreReplacing of b/d 4000gpm pump motor set by 2000gpm pump motor set of jharna face sump along with diversion of its delivery line in safe and suitable route for safety purpose at muraidih, amp colliery.
Replacing of b/d 4000gpm pump motor set by 2000gpm pump motor set of jharna face sump along with diversion of its delivery line in safe and suitable route for safety purpose at muraidih, amp colliery.
Read moreShifting of 4000 gpm pump motor of jharna face sump as and when required (03 times) for extraction of coal from the floor of the sump and other miscellaneous job related to pumping and pipe line of mocp patch under amp colliery.
Shifting of 4000 gpm pump motor of jharna face 
 sump as and when required (03 times) for extraction of 
 coal from the floor of the sump and other miscellaneous 
 job related to pumping and pipe line of mocp patch 
 under amp colliery.
Read moreDiversion of 6.6kv overhead line for lowering of 4000gpm motor pump at jharna face due to advancement of coal face in 4th patch muraidih, amp colliery.
Diversion of 6.6kv overhead line for lowering of 4000gpm motor pump at jharna face due to advancement of coal face in 4th patch muraidih, amp colliery.