Tender Details

Particulars Details
Title
Lowering Of Two Ht Pump Motor Of Coal Face Sump And Extension Of Its Suction Pipes, Shifting Of 4000 Gpm Pump Motor Of Jharna Face And Extension Of Its Suction Pipe Of Muraidih, Amp Colliery
Description
Lowering Of Two Ht Pump Motor Of Coal Face Sump And Extension Of Its Suction Pipes, Shifting Of 4000 Gpm Pump &#X0d Motor Of Jharna Face And Extension Of Its Suction Pipe Of Muraidih, Amp Colliery
Organisation Bharat Coking Coal Limited | Public Sector Undertakings
Tender Id 2024_BCCL_298502_1
Reference
Number
BCCL/GM/AR-I/AM (ENM)/E-TENDER/2023-24/475
Tender Fee 0
EMD 2200
Tender Value -
Place AMP COLLIERY BARORA AREA
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=309200

Start Date January 13, 2024 23:30
End Date
Expired 24/01/2024

Expired 947 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Diversion of 6.6kv overhead line for lowering of 4000gpm motor pump at jharna face due to advancement of coal face in 4th patch muraidih, amp colliery.

Diversion of 6.6kv overhead line for lowering of 4000gpm motor pump at jharna face due to advancement of coal face in 4th patch muraidih, amp colliery.

Read more
Assembling, transporting and installation of one 4000gpm pump motor set in purba face sump and erection of its delivery and shifting of a 4000gpm pump motor set from the damaged pontoon to ground level in jharna face sump at muraidih, amp colliery.

Assembling, transporting and installation of one 4000gpm pump motor set in purba face sump and erection of its delivery and shifting of a 4000gpm pump motor set from the damaged pontoon to ground level in jharna face sump at muraidih, amp colliery.

Read more
Lowering of 4000gpm pump motor set of purba face sump along with diversion of its delivery line in suitable route for safety purpose at muraidih, amp colliery

Lowering of 4000gpm pump motor set of purba face sump along with diversion of its delivery line in suitable route for safety purpose at muraidih, amp colliery

Read more
Shifting of 4000gpm pump motor (three times) of jharna face sump and di of its pipe line due to gradual decreasing of water level at muraidih under amp colliery

Shifting of 4000gpm pump motor (three times) of jharna face sump and di of its pipe line due to gradual &#x0d decreasing of water level at muraidih under amp colliery

Read more
(a)shifting of 4000gpm pump motor set of jharna face sump as and when required(04times)for extraction of coal from the floor of the sump and(b)maintenance of 4000gpm pump of jharna face and purba face and their pipeline of muraidih, amp colliery

(a)shifting of 4000gpm pump motor set of jharna face sump as and when required(04times)for extraction of coal from the floor of the sump and(b)maintenance of 4000gpm pump of jharna face and purba face and their pipeline of muraidih, amp colliery

Read more
Shifting of 4000gpm pump motor of jharna face for 04 times with gradual increasing of water level of the sump under muraidih, amp colliery.

Shifting of 4000gpm pump motor of jharna face for &#x0d 04 times with gradual increasing of water level of the &#x0d sump under muraidih, amp colliery.

Read more
Replacing of b/d 4000gpm pump motor set by 2000gpm pump motor set of jharna face sump along with diversion of its delivery line in safe and suitable route for safety purpose at muraidih, amp colliery.

Replacing of b/d 4000gpm pump motor set by 2000gpm pump motor set of jharna face sump along with diversion of its delivery line in safe and suitable route for safety purpose at muraidih, amp colliery.

Read more
(a) installation of 4000gpm pump motor in sadbhavna face sump and jointing of its delivery with the existing range and (b) maintenance of 4000gpm pumps of coal face, jharna face and purba face sump under amp colliery.

(a) installation of 4000gpm pump motor in sadbhavna face sump and jointing of its delivery with the existing &#x0d range and (b) maintenance of 4000gpm pumps of coal face, jharna face and purba face sump under amp colliery.

Read more
Shifting of 4000gpm pumpmotor set of jharna sump as and when required (03times) with its pipeline for extraction of coal from the floor of the sump and maintenance of 4000gpm pump of jharna face and purba face and their pipe line of muraidih, ampc.

Shifting of 4000gpm pumpmotor set of jharna sump as and when required (03times) with its pipeline for extraction of coal from the floor of the sump and maintenance of 4000gpm pump of jharna face and purba face and their pipe line of muraidih, ampc.

Read more
Dismantling of two 4000gpm pump motor set with their pipe line from jharna face sump and transporting to socp attendance room premises due to decreasing of water level of jharna sump of muraidih, amp colliery.

Dismantling of two 4000gpm pump motor set with their pipe line from jharna face sump and transporting to socp attendance room premises due to decreasing of water level of jharna sump of muraidih, amp colliery.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise