Tender Details

Particulars Details
Title
Lowering Of 4000 Gpm Pump Motor Set Of Purba Face Sump Along With Diversion Of Its Delivery Line In Suitable Route For Safety Purpose At Muraidih, Amp Colliery
Description
Lowering Of 4000 Gpm Pump Motor Set Of Purba Face Sump Along With Diversion Of Its Delivery Line In Suitable Route For Safety Purpose At Muraidih, Amp Colliery
Organisation Coal India Limited (CIL)
Tender Id 2023_BCCL_292924_1
Reference
Number
BCCL/GM/AR-I/AM (ENM)/E-TENDER/2023-24/373
Tender Fee -
EMD 1400
Tender Value -
Place ENM DEPARTMENT, BARORA AREA
Link
View Original Tender Notice

https://coalindiatenders.nic.in

Start Date November 04, 2023 23:30
End Date
Expired 15/11/2023

Expired 1023 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Three times shifting of 4000gpm pump motor at purba face sump along with di of its delivery line in suitable route for safety purpose at muraidih, amp colliery.

Three times shifting of 4000gpm pump motor at &#x0d purba face sump along with di of its delivery line &#x0d in suitable route for safety purpose at muraidih, amp &#x0d colliery.

Read more
Replacing of b/d 4000gpm pump motor set by another 4000gpm pump motor set of purba face sump and three times shifting of pump along with diversion of its delivery line in suitable route for safety purpose at muraidih, amp colliery.

Replacing of b/d 4000gpm pump motor set by another 4000gpm pump motor set of purba face sump and three times shifting of pump along with diversion of its delivery line in suitable route for safety purpose at muraidih, amp colliery.

Read more
Diversion of 6.6kv overhead line for lowering of 4000gpm motor pump at jharna face due to advancement of coal face in 4th patch muraidih, amp colliery.

Diversion of 6.6kv overhead line for lowering of 4000gpm motor pump at jharna face due to advancement of coal face in 4th patch muraidih, amp colliery.

Read more
Lowering of two ht pump motor of coal face sump and extension of its suction pipes, shifting of 4000gpm pump motor of jharna face and extension of its suction pipe of muraidih, amp colliery

Lowering of two ht pump motor of coal face sump and extension of its suction pipes, shifting of 4000gpm pump &#x0d motor of jharna face and extension of its suction pipe of muraidih, amp colliery

Read more
Replacing of b/d 4000gpm pump motor set by 2000gpm pump motor set of jharna face sump along with diversion of its delivery line in safe and suitable route for safety purpose at muraidih, amp colliery.

Replacing of b/d 4000gpm pump motor set by 2000gpm pump motor set of jharna face sump along with diversion of its delivery line in safe and suitable route for safety purpose at muraidih, amp colliery.

Read more
(a) installation of 4000gpm pump motor in sadbhavna face sump and jointing of its delivery with the existing range and (b) maintenance of 4000gpm pumps of coal face, jharna face and purba face sump under amp colliery.

(a) installation of 4000gpm pump motor in sadbhavna face sump and jointing of its delivery with the existing &#x0d range and (b) maintenance of 4000gpm pumps of coal face, jharna face and purba face sump under amp colliery.

Read more
Assembling, transporting and installation of one 4000gpm pump motor set in purba face sump and erection of its delivery and shifting of a 4000gpm pump motor set from the damaged pontoon to ground level in jharna face sump at muraidih, amp colliery.

Assembling, transporting and installation of one 4000gpm pump motor set in purba face sump and erection of its delivery and shifting of a 4000gpm pump motor set from the damaged pontoon to ground level in jharna face sump at muraidih, amp colliery.

Read more
(a)shifting of 4000gpm pump motor set of jharna face sump as and when required(04times)for extraction of coal from the floor of the sump and(b)maintenance of 4000gpm pump of jharna face and purba face and their pipeline of muraidih, amp colliery

(a)shifting of 4000gpm pump motor set of jharna face sump as and when required(04times)for extraction of coal from the floor of the sump and(b)maintenance of 4000gpm pump of jharna face and purba face and their pipeline of muraidih, amp colliery

Read more
Lowering of 4000gpm pump motor of purba face sump for 02 times with gradual decreasing of water level of the sump and other miscellaneous jobs related to pumping and pipe line works of purba face under amp colliery.

Lowering of 4000gpm pump motor of purba &#x0d face sump for 02 times with gradual decreasing of &#x0d water level of the sump and other miscellaneous &#x0d jobs related to pumping and pipe line works of &#x0d purba face under amp colliery.

Read more
Shifting of 4000gpm pumpmotor set of jharna sump as and when required (03times) with its pipeline for extraction of coal from the floor of the sump and maintenance of 4000gpm pump of jharna face and purba face and their pipe line of muraidih, ampc.

Shifting of 4000gpm pumpmotor set of jharna sump as and when required (03times) with its pipeline for extraction of coal from the floor of the sump and maintenance of 4000gpm pump of jharna face and purba face and their pipe line of muraidih, ampc.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise