Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Lowering Of 4000 Gpm Pump Motor Set Of Purba Face Sump Along With Diversion Of Its Delivery Line In Suitable Route For Safety Purpose At Muraidih, Amp Colliery
|
| Description |
Lowering Of 4000 Gpm Pump Motor Set Of Purba Face
Sump Along With Diversion Of Its Delivery Line In
Suitable Route For Safety Purpose At Muraidih, Amp
Colliery
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_BCCL_292924_1 |
|
Reference Number |
BCCL/GM/AR-I/AM (ENM)/E-TENDER/2023-24/373 |
| Tender Fee | - |
| EMD | 1400 |
| Tender Value | - |
| Place | ENM DEPARTMENT, BARORA AREA |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | November 04, 2023 23:30 |
| End Date |
Expired
15/11/2023
Expired 1023 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Three times shifting of 4000gpm pump motor at purba face sump along with di of its delivery line in suitable route for safety purpose at muraidih, amp colliery.
Three times shifting of 4000gpm pump motor at 
 purba face sump along with di of its delivery line 
 in suitable route for safety purpose at muraidih, amp 
 colliery.
Read moreReplacing of b/d 4000gpm pump motor set by another 4000gpm pump motor set of purba face sump and three times shifting of pump along with diversion of its delivery line in suitable route for safety purpose at muraidih, amp colliery.
Replacing of b/d 4000gpm pump motor set by another 4000gpm pump motor set of purba face sump and three times shifting of pump along with diversion of its delivery line in suitable route for safety purpose at muraidih, amp colliery.
Read moreDiversion of 6.6kv overhead line for lowering of 4000gpm motor pump at jharna face due to advancement of coal face in 4th patch muraidih, amp colliery.
Diversion of 6.6kv overhead line for lowering of 4000gpm motor pump at jharna face due to advancement of coal face in 4th patch muraidih, amp colliery.
Read moreLowering of two ht pump motor of coal face sump and extension of its suction pipes, shifting of 4000gpm pump motor of jharna face and extension of its suction pipe of muraidih, amp colliery
Lowering of two ht pump motor of coal face sump and extension of its suction pipes, shifting of 4000gpm pump 
 motor of jharna face and extension of its suction pipe of muraidih, amp colliery
Read moreReplacing of b/d 4000gpm pump motor set by 2000gpm pump motor set of jharna face sump along with diversion of its delivery line in safe and suitable route for safety purpose at muraidih, amp colliery.
Replacing of b/d 4000gpm pump motor set by 2000gpm pump motor set of jharna face sump along with diversion of its delivery line in safe and suitable route for safety purpose at muraidih, amp colliery.
Read more(a) installation of 4000gpm pump motor in sadbhavna face sump and jointing of its delivery with the existing range and (b) maintenance of 4000gpm pumps of coal face, jharna face and purba face sump under amp colliery.
(a) installation of 4000gpm pump motor in sadbhavna face sump and jointing of its delivery with the existing 
 range and (b) maintenance of 4000gpm pumps of coal face, jharna face and purba face sump under amp colliery.
Read moreAssembling, transporting and installation of one 4000gpm pump motor set in purba face sump and erection of its delivery and shifting of a 4000gpm pump motor set from the damaged pontoon to ground level in jharna face sump at muraidih, amp colliery.
Assembling, transporting and installation of one 4000gpm pump motor set in purba face sump and erection of its delivery and shifting of a 4000gpm pump motor set from the damaged pontoon to ground level in jharna face sump at muraidih, amp colliery.
Read more(a)shifting of 4000gpm pump motor set of jharna face sump as and when required(04times)for extraction of coal from the floor of the sump and(b)maintenance of 4000gpm pump of jharna face and purba face and their pipeline of muraidih, amp colliery
(a)shifting of 4000gpm pump motor set of jharna face sump as and when required(04times)for extraction of coal from the floor of the sump and(b)maintenance of 4000gpm pump of jharna face and purba face and their pipeline of muraidih, amp colliery
Read moreLowering of 4000gpm pump motor of purba face sump for 02 times with gradual decreasing of water level of the sump and other miscellaneous jobs related to pumping and pipe line works of purba face under amp colliery.
Lowering of 4000gpm pump motor of purba 
 face sump for 02 times with gradual decreasing of 
 water level of the sump and other miscellaneous 
 jobs related to pumping and pipe line works of 
 purba face under amp colliery.
Read moreShifting of 4000gpm pumpmotor set of jharna sump as and when required (03times) with its pipeline for extraction of coal from the floor of the sump and maintenance of 4000gpm pump of jharna face and purba face and their pipe line of muraidih, ampc.
Shifting of 4000gpm pumpmotor set of jharna sump as and when required (03times) with its pipeline for extraction of coal from the floor of the sump and maintenance of 4000gpm pump of jharna face and purba face and their pipe line of muraidih, ampc.
Read moreof your Industry type