Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Replacing Of B/D 4000 Gpm Pump Motor Set By Another 4000 Gpm Pump Motor Set Of Purba Face Sump And Three Times Shifting Of Pump Along With Diversion Of Its Delivery Line In Suitable Route For Safety Purpose At Muraidih, Amp Colliery.
|
| Description |
Replacing Of B/D 4000 Gpm Pump Motor Set By Another
4000 Gpm Pump Motor Set Of Purba Face Sump And Three
Times Shifting Of Pump Along With Diversion Of Its
Delivery Line In Suitable Route For Safety Purpose At
Muraidih, Amp Colliery.
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_BCCL_292595_1 |
|
Reference Number |
BCCL/GM/AR-I/AM (ENM)/E-TENDER/2023-24/357 |
| Tender Fee | - |
| EMD | 2400 |
| Tender Value | - |
| Place | ENM DEPARTMENT, BARORA AREA |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | November 02, 2023 23:30 |
| End Date |
Expired
13/11/2023
Expired 1066 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Lowering of 4000gpm pump motor set of purba face sump along with diversion of its delivery line in suitable route for safety purpose at muraidih, amp colliery
Lowering of 4000gpm pump motor set of purba face sump along with diversion of its delivery line in suitable route for safety purpose at muraidih, amp colliery
Read moreThree times shifting of 4000gpm pump motor at purba face sump along with di of its delivery line in suitable route for safety purpose at muraidih, amp colliery.
Three times shifting of 4000gpm pump motor at 
 purba face sump along with di of its delivery line 
 in suitable route for safety purpose at muraidih, amp 
 colliery.
Read moreReplacing of b/d 4000gpm pump motor set by 2000gpm pump motor set of jharna face sump along with diversion of its delivery line in safe and suitable route for safety purpose at muraidih, amp colliery.
Replacing of b/d 4000gpm pump motor set by 2000gpm pump motor set of jharna face sump along with diversion of its delivery line in safe and suitable route for safety purpose at muraidih, amp colliery.
Read moreShifting of 4000gpm pump motor of jharna face for 04 times with gradual increasing of water level of the sump under muraidih, amp colliery.
Shifting of 4000gpm pump motor of jharna face for 
 04 times with gradual increasing of water level of the 
 sump under muraidih, amp colliery.
Read moreAssembling, transporting and installation of one 4000gpm pump motor set in purba face sump and erection of its delivery and shifting of a 4000gpm pump motor set from the damaged pontoon to ground level in jharna face sump at muraidih, amp colliery.
Assembling, transporting and installation of one 4000gpm pump motor set in purba face sump and erection of its delivery and shifting of a 4000gpm pump motor set from the damaged pontoon to ground level in jharna face sump at muraidih, amp colliery.
Read moreShifting of 4000gpm pump motor (three times) of jharna face sump and di of its pipe line due to gradual decreasing of water level at muraidih under amp colliery
Shifting of 4000gpm pump motor (three times) of jharna face sump and di of its pipe line due to gradual 
 decreasing of water level at muraidih under amp colliery
Read moreLowering of 4000gpm pump motor of purba face sump for 02 times with gradual decreasing of water level of the sump and other miscellaneous jobs related to pumping and pipe line works of purba face under amp colliery.
Lowering of 4000gpm pump motor of purba 
 face sump for 02 times with gradual decreasing of 
 water level of the sump and other miscellaneous 
 jobs related to pumping and pipe line works of 
 purba face under amp colliery.
Read more(a)shifting of 4000gpm pump motor set of jharna face sump as and when required(04times)for extraction of coal from the floor of the sump and(b)maintenance of 4000gpm pump of jharna face and purba face and their pipeline of muraidih, amp colliery
(a)shifting of 4000gpm pump motor set of jharna face sump as and when required(04times)for extraction of coal from the floor of the sump and(b)maintenance of 4000gpm pump of jharna face and purba face and their pipeline of muraidih, amp colliery
Read moreShifting of 4000gpm pump motor of sadbhawna face for 02 times with gradual decreasing of water level of the sump and maintenance of the above pump and its pipeline under muraidih, amp colliery
Shifting of 4000gpm pump motor of sadbhawna face for 02 times with gradual decreasing of water level of the 
 sump and maintenance of the above pump and its pipeline under muraidih, amp colliery
Read moreShifting of 4000gpm pump motor of sadbhawna face for with gradual increasing of water level of the sump under muraidih, amp colliery.
Shifting of 4000gpm pump motor of sadbhawna 
 face for with gradual increasing of water level of the sump under muraidih, amp colliery.
Read moreof your Industry type