Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Shifting Of 4000 Gpm Pumpmotor Set Of Jharna Sump As And When Required (03times) With Its Pipeline For Extraction Of Coal From The Floor Of The Sump And Maintenance Of 4000 Gpm Pump Of Jharna Face And Purba Face And Their Pipe Line Of Muraidih, Ampc.
|
| Description |
Shifting Of 4000 Gpm Pumpmotor Set Of Jharna Sump As And When Required (03times) With Its Pipeline For Extraction Of Coal From The Floor Of The Sump And Maintenance Of 4000 Gpm Pump Of Jharna Face And Purba Face And Their Pipe Line Of Muraidih, Ampc.
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_BCCL_285250_1 |
|
Reference Number |
BCCL/GM/AR-I/AM (ENM)/E-TENDER/2023-24/169 |
| Tender Fee | - |
| EMD | 2423 |
| Tender Value | - |
| Place | ENM DEPARTMENT, BARORA AREA |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | August 05, 2023 23:30 |
| End Date |
Expired
16/08/2023
Expired 1108 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
(a)shifting of 4000gpm pump motor set of jharna face sump as and when required(04times)for extraction of coal from the floor of the sump and(b)maintenance of 4000gpm pump of jharna face and purba face and their pipeline of muraidih, amp colliery
(a)shifting of 4000gpm pump motor set of jharna face sump as and when required(04times)for extraction of coal from the floor of the sump and(b)maintenance of 4000gpm pump of jharna face and purba face and their pipeline of muraidih, amp colliery
Read moreDismantling of two 4000gpm pump motor set with their pipe line from jharna face sump and transporting to socp attendance room premises due to decreasing of water level of jharna sump of muraidih, amp colliery.
Dismantling of two 4000gpm pump motor set with their pipe line from jharna face sump and transporting to socp attendance room premises due to decreasing of water level of jharna sump of muraidih, amp colliery.
Read more(a) lowering two 4000gpm pump set of jharna sump (b) installation of two set of drum pontoon in jharna sump and shifting of two set of 4000gpm pump set from ground level to the pontoon(c) maintenance of two ht pump of 3rd patch sump, muraidih, ampc.
(a) lowering two 4000gpm pump set of jharna sump (b) installation of two set of drum pontoon in jharna sump and shifting of two set of 4000gpm pump set from ground level to the pontoon(c) maintenance of two ht pump of 3rd patch sump, muraidih, ampc.
Read moreShifting of 4000gpm pump motor of jharna face for 04 times with gradual increasing of water level of the sump under muraidih, amp colliery.
Shifting of 4000gpm pump motor of jharna face for 
 04 times with gradual increasing of water level of the 
 sump under muraidih, amp colliery.
Read more(a)recovery of 10inch dia pipe of idle range of jharna sump and transporting pipes to attendance room premises for repairing (b)shifting of 4000gpm pump of jharna sump to upper bench(c)pipe line rectification and repairing under muraidih,ampc.
(a)recovery of 10inch dia pipe of idle range of jharna sump and transporting pipes to attendance room premises for repairing (b)shifting of 4000gpm pump of jharna sump to upper bench(c)pipe line rectification and repairing 
 under muraidih,ampc.
Read moreAssembling, transporting and installation of one 4000gpm pump motor set in purba face sump and erection of its delivery and shifting of a 4000gpm pump motor set from the damaged pontoon to ground level in jharna face sump at muraidih, amp colliery.
Assembling, transporting and installation of one 4000gpm pump motor set in purba face sump and erection of its delivery and shifting of a 4000gpm pump motor set from the damaged pontoon to ground level in jharna face sump at muraidih, amp colliery.
Read more(a) installation of 4000gpm pump motor in sadbhavna face sump and jointing of its delivery with the existing range and (b) maintenance of 4000gpm pumps of coal face, jharna face and purba face sump under amp colliery.
(a) installation of 4000gpm pump motor in sadbhavna face sump and jointing of its delivery with the existing 
 range and (b) maintenance of 4000gpm pumps of coal face, jharna face and purba face sump under amp colliery.
Read more(a)shifting of 4000gpm pump of coalface and jharna face sump for 02times with gradual decreasing of water level and(b)dismantling and transporting of 10inch dia mspipe from idle delivery range of jharna face to attendance room premises under ampc
(a)shifting of 4000gpm pump of coalface and jharna face sump for 02times with gradual decreasing of water level 
 and(b)dismantling and transporting of 10inch dia mspipe from idle delivery range of jharna face to attendance room 
 premises under ampc
Read moreShifting of 4000gpm pump motor (three times) of jharna face sump and di of its pipe line due to gradual decreasing of water level at muraidih under amp colliery
Shifting of 4000gpm pump motor (three times) of jharna face sump and di of its pipe line due to gradual 
 decreasing of water level at muraidih under amp colliery
Read moreLowering of two ht pump motor of coal face sump and extension of its suction pipes, shifting of 4000gpm pump motor of jharna face and extension of its suction pipe of muraidih, amp colliery
Lowering of two ht pump motor of coal face sump and extension of its suction pipes, shifting of 4000gpm pump 
 motor of jharna face and extension of its suction pipe of muraidih, amp colliery
Read moreof your Industry type