Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
(A)shifting Of 4000 Gpm Pump Of Coalface And Jharna Face Sump For 02times With Gradual Decreasing Of Water Level And(b)dismantling And Transporting Of 10inch Dia M Spipe From Idle Delivery Range Of Jharna Face To Attendance Room Premises Under Ampc
|
| Description |
(A)shifting Of 4000 Gpm Pump Of Coalface And Jharna Face Sump For 02times With Gradual Decreasing Of Water Level 
And(b)dismantling And Transporting Of 10inch Dia M Spipe From Idle Delivery Range Of Jharna Face To Attendance Room 
Premises Under Ampc
|
| Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
| Tender Id | 2024_BCCL_312945_1 |
|
Reference Number |
BCCL/GM/AR-I/AM (ENM)/E-TENDER/2024-25/142 |
| Tender Fee | 0 |
| EMD | 2300 |
| Tender Value | - |
| Place | AMP COLLIERY BARORA AREA |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=324301 |
| Start Date | July 20, 2024 17:30 |
| End Date |
Expired
31/07/2024
Expired 759 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Shifting of 4000gpm pump motor (three times) of jharna face sump and di of its pipe line due to gradual decreasing of water level at muraidih under amp colliery
Shifting of 4000gpm pump motor (three times) of jharna face sump and di of its pipe line due to gradual 
 decreasing of water level at muraidih under amp colliery
Read more(a)shifting of 02nos. 4000gpm pump motor of jarlahi sump 02times for extraction of coal from floor of the sump (b)lowering 03nos. pontoon along with their pump motor due to gradual decreasing of water level of jarlahi main patch sump,ampc.
(a)shifting of 02nos. 4000gpm pump motor of jarlahi sump 02times for extraction of coal from floor of the sump (b)lowering 03nos. pontoon along with their pump motor due to gradual decreasing of water level of jarlahi 
 main patch sump,ampc.
Read moreShifting of 4000gpm pump motor of jharna face for 04 times with gradual increasing of water level of the sump under muraidih, amp colliery.
Shifting of 4000gpm pump motor of jharna face for 
 04 times with gradual increasing of water level of the 
 sump under muraidih, amp colliery.
Read moreDi of two 10inch dia m.s. pipes range of two 4000gpm pump motor 02times for coal extraction of floor face at jarlahi patch of phularitand, amp colliery.
Di of two 10inch dia m.s. pipes range of two 4000gpm pump motor 02times for coal extraction of floor 
 face at jarlahi patch of phularitand, amp colliery.
Read moreShifting of 4000gpm pumpmotor set of jharna sump as and when required (03times) with its pipeline for extraction of coal from the floor of the sump and maintenance of 4000gpm pump of jharna face and purba face and their pipe line of muraidih, ampc.
Shifting of 4000gpm pumpmotor set of jharna sump as and when required (03times) with its pipeline for extraction of coal from the floor of the sump and maintenance of 4000gpm pump of jharna face and purba face and their pipe line of muraidih, ampc.
Read moreDismantling of two 4000gpm pump motor set with their pipe line from jharna face sump and transporting to socp attendance room premises due to decreasing of water level of jharna sump of muraidih, amp colliery.
Dismantling of two 4000gpm pump motor set with their pipe line from jharna face sump and transporting to socp attendance room premises due to decreasing of water level of jharna sump of muraidih, amp colliery.
Read moreShifting of 4000gpm pump motor of sadbhawna face for 02 times with gradual decreasing of water level of the sump and maintenance of the above pump and its pipeline under muraidih, amp colliery
Shifting of 4000gpm pump motor of sadbhawna face for 02 times with gradual decreasing of water level of the 
 sump and maintenance of the above pump and its pipeline under muraidih, amp colliery
Read moreLowering of 4000gpm pump motor of purba face sump for 02 times with gradual decreasing of water level of the sump and other miscellaneous jobs related to pumping and pipe line works of purba face under amp colliery.
Lowering of 4000gpm pump motor of purba 
 face sump for 02 times with gradual decreasing of 
 water level of the sump and other miscellaneous 
 jobs related to pumping and pipe line works of 
 purba face under amp colliery.
Read more(a)recovery of 10inch dia pipe of idle range of jharna sump and transporting pipes to attendance room premises for repairing (b)shifting of 4000gpm pump of jharna sump to upper bench(c)pipe line rectification and repairing under muraidih,ampc.
(a)recovery of 10inch dia pipe of idle range of jharna sump and transporting pipes to attendance room premises for repairing (b)shifting of 4000gpm pump of jharna sump to upper bench(c)pipe line rectification and repairing 
 under muraidih,ampc.
Read moreShifting of 4000gpm pump (four times) of sadbhawna pumping face in safe/lower side of the sump (due to gradual decreasing of water level) for water supply to workers colony and chitahi basti under muraidih amp colliery.
Shifting of 4000gpm pump (four times) of sadbhawna pumping face in safe/lower side of the sump (due to gradual decreasing of water level) for water supply to workers colony and chitahi basti under muraidih amp colliery.
Read moreof your Industry type