Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Shifting Of 4000 Gpm Pump Motor Of Sadbhawna Face For 02 Times With Gradual Decreasing Of Water Level Of The Sump And Maintenance Of The Above Pump And Its Pipeline Under Muraidih, Amp Colliery
|
| Description |
Shifting Of 4000 Gpm Pump Motor Of Sadbhawna Face For 02 Times With Gradual Decreasing Of Water Level Of The 
Sump And Maintenance Of The Above Pump And Its Pipeline Under Muraidih, Amp Colliery
|
| Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
| Tender Id | 2024_BCCL_298586_1 |
|
Reference Number |
BCCL/GM/AR-I/AM (ENM)/E-TENDER/2023-24/485 |
| Tender Fee | 0 |
| EMD | 2000 |
| Tender Value | - |
| Place | AMP COLLIERY BARORA AREA |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=309287 |
| Start Date | January 15, 2024 23:30 |
| End Date |
Expired
27/01/2024
Expired 945 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Shifting of 4000gpm pump motor of sadbhawna face for with gradual increasing of water level of the sump under muraidih, amp colliery.
Shifting of 4000gpm pump motor of sadbhawna 
 face for with gradual increasing of water level of the sump under muraidih, amp colliery.
Read moreShifting of 4000gpm pump (four times) of sadbhawna pumping face in safe/lower side of the sump (due to gradual decreasing of water level) for water supply to workers colony and chitahi basti under muraidih amp colliery.
Shifting of 4000gpm pump (four times) of sadbhawna pumping face in safe/lower side of the sump (due to gradual decreasing of water level) for water supply to workers colony and chitahi basti under muraidih amp colliery.
Read moreShifting of 4000gpm pump motor (three times) of jharna face sump and di of its pipe line due to gradual decreasing of water level at muraidih under amp colliery
Shifting of 4000gpm pump motor (three times) of jharna face sump and di of its pipe line due to gradual 
 decreasing of water level at muraidih under amp colliery
Read moreShifting of 4000gpm pump motor of jharna face for 04 times with gradual increasing of water level of the sump under muraidih, amp colliery.
Shifting of 4000gpm pump motor of jharna face for 
 04 times with gradual increasing of water level of the 
 sump under muraidih, amp colliery.
Read moreLowering of 4000gpm pump motor of purba face sump for 02 times with gradual decreasing of water level of the sump and other miscellaneous jobs related to pumping and pipe line works of purba face under amp colliery.
Lowering of 4000gpm pump motor of purba 
 face sump for 02 times with gradual decreasing of 
 water level of the sump and other miscellaneous 
 jobs related to pumping and pipe line works of 
 purba face under amp colliery.
Read moreShifting of 4000gpm ht pump in lower side of the sump three times due to decreasing of water level of main water sump of phularitand, amp colliery.
Shifting of 4000gpm ht pump in lower side of the sump 
 three times due to decreasing of water level of main water 
 sump of phularitand, amp colliery.
Read more(a)shifting of 02nos. 4000gpm pump motor of jarlahi sump 02times for extraction of coal from floor of the sump (b)lowering 03nos. pontoon along with their pump motor due to gradual decreasing of water level of jarlahi main patch sump,ampc.
(a)shifting of 02nos. 4000gpm pump motor of jarlahi sump 02times for extraction of coal from floor of the sump (b)lowering 03nos. pontoon along with their pump motor due to gradual decreasing of water level of jarlahi 
 main patch sump,ampc.
Read moreLowering of 4000gpm ht pump with pontoon in lower side of the sump three times due to decreasing of water level of jarlahi patch of phularitand, amp colliery.
Lowering of 4000gpm ht pump with pontoon in lower side of the sump three times due to decreasing of water level of jarlahi patch of phularitand, amp colliery.
Read moreLowering of 4000gpm pump motor of sadbhavna face for 03times with gradual decreasing of water level of sump and maintenance of the above pump and its pipe line for smooth supply of water to workers colony and nearby village under amp colliery.
Lowering of 4000gpm pump motor of sadbhavna face for 03times with gradual decreasing of water level of sump and maintenance of the above pump and its pipe line for smooth supply of water to workers colony and nearby village under amp colliery.
Read moreExtension of delivery of 3000gpm and 2000gpm pump installed on the pontoon at main patch sump due to gradual decreasing of water level and maintenance of above pump for smooth operation at phularitand, amp colliery.
Extension of delivery of 3000gpm and 2000gpm pump installed on the pontoon at main patch sump due to gradual decreasing of water level and maintenance of above pump for smooth operation at phularitand, amp colliery.
Read moreof your Industry type