Tender Details

About Tender

🏭 Urgent Tender: Pump Shifting Services For Bharat Coking Coal Limited 🏭 Bharat Coking Coal Limited (Bccl), A Public Sector Undertaking, Requires The Services Of A Reliable Contractor To Shift A 4000 Gpm Ht Pump Three Times From The Lower Side Of The Sump In The Phularitand, Amp Colliery Due To The Decreasing Water Level In The Main Water Sump. 📅 Bid Submission Deadline: May 09, 2024, 6:00 Pm Interested Bidders Must Submit A Tender Security Of Inr 27,000. Tender Fees Are Not Applicable. The Contractor Must Possess The Necessary Expertise And Equipment To Handle The Pump Shifting Operation Safely And Efficiently. Proposals Should Include Detailed Methodology, Safety Plans, And Timelines For The Execution Of The Work. Keywords: Pump Shifting, High Pressure, High Temperature Pump, Bharat Coking Coal Limited, Colliery, Water Sump, Tender, Government Contract
Particulars Details
Title
Shifting Of 4000 Gpm Ht Pump In Lower Side Of The Sump Three Times Due To Decreasing Of Water Level Of Main Water Sump Of Phularitand, Amp Colliery.
Description
Shifting Of 4000 Gpm Ht Pump In Lower Side Of The Sump &#X0d Three Times Due To Decreasing Of Water Level Of Main Water &#X0d Sump Of Phularitand, Amp Colliery.
Organisation Bharat Coking Coal Limited | Public Sector Undertakings
Tender Id 2024_BCCL_307199_1
Reference
Number
BCCL/GM/AR-I/AM (ENM)/E-TENDER/2024-25/80
Tender Fee 0
EMD 2700
Tender Value -
Place AMP COLLIERY BARORA AREA
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=318333

Start Date April 29, 2024 17:30
End Date
Expired 09/05/2024

Expired 889 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Shifting and reconstruction of lt/ht line, sub station due to const. of road and cd works under pmgsy-iii road-b mrl-1/8 brahmanbati to tandikana bridge chhaka via sanamulei, kaliagarh, saptafeni gada under r.w.e.s kataka.

Shifting and reconstruction of lt/ht line, sub station due to const. of road and cd works under pmgsy-iii road-b mrl-1/8 brahmanbati to tandikana bridge chhaka via sanamulei, kaliagarh, saptafeni gada under r.w.e.s kataka.

Read more
Lowering of 4000gpm ht pump with pontoon in lower side of the sump three times due to decreasing of water level of jarlahi patch of phularitand, amp colliery.

Lowering of 4000gpm ht pump with pontoon in lower side of the sump three times due to decreasing of water level of jarlahi patch of phularitand, amp colliery.

Read more
Shifting of 4000gpm pump motor (three times) of jharna face sump and di of its pipe line due to gradual decreasing of water level at muraidih under amp colliery

Shifting of 4000gpm pump motor (three times) of jharna face sump and di of its pipe line due to gradual &#x0d decreasing of water level at muraidih under amp colliery

Read more
Shifting of 4000gpm pump (four times) of sadbhawna pumping face in safe/lower side of the sump (due to gradual decreasing of water level) for water supply to workers colony and chitahi basti under muraidih amp colliery.

Shifting of 4000gpm pump (four times) of sadbhawna pumping face in safe/lower side of the sump (due to gradual decreasing of water level) for water supply to workers colony and chitahi basti under muraidih amp colliery.

Read more
Marching of 2nd 4000gpm pump motor (three times) of jarlahi sump along with di of its pipe line due to mining activity at phularitand, amp colliery.

Marching of 2nd 4000gpm pump motor (three times) &#x0d of jarlahi sump along with di of its pipe line due &#x0d to mining activity at phularitand, amp colliery.

Read more
Marching of 2nd 4000gpm pump motor (three times) of jarlahi sump along with di of its pipe line due to mining activity at phularitand, amp colliery.

Marching of 2nd 4000gpm pump motor (three times) &#x0d of jarlahi sump along with di of its pipe line due &#x0d to mining activity at phularitand, amp colliery.

Read more
Marching of 1st pontoon with 4000gpm pump motor (five times) from existing position to the another lower side of the sump and di of its delivery range due to blasting at jarlahi patch of phularitand, amp colliery.

Marching of 1st pontoon with 4000gpm pump motor (five times) from existing position to the another lower side of the sump and di of its delivery range due to blasting at jarlahi patch of phularitand, amp colliery.

Read more
Marching of 3rd pontoon with 4000gpm pump motor (four times) from existing position to the another lower side of the sump and di of its delivery range due to blasting at jarlahi patch of phularitand, amp colliery.

Marching of 3rd pontoon with 4000gpm pump motor (four times) from existing position to the another lower &#x0d side of the sump and di of its delivery range due to blasting at jarlahi patch of phularitand, amp colliery.

Read more
Shifting of 4000gpm pump motor of sadbhawna face for 02 times with gradual decreasing of water level of the sump and maintenance of the above pump and its pipeline under muraidih, amp colliery

Shifting of 4000gpm pump motor of sadbhawna face for 02 times with gradual decreasing of water level of the &#x0d sump and maintenance of the above pump and its pipeline under muraidih, amp colliery

Read more
Manufacturing of carbon steel shaft for 4000gpm kirloskar make ht pump of phularitand colliery.

Manufacturing of carbon steel shaft for 4000gpm kirloskar make ht pump of phularitand colliery.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise