Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Shifting Of 4000 Gpm Pump Motor (Three Times) Of Jharna Face Sump And Di Of Its Pipe Line Due To Gradual Decreasing Of Water Level At Muraidih Under Amp Colliery
|
| Description |
Shifting Of 4000 Gpm Pump Motor (Three Times) Of Jharna Face Sump And Di Of Its Pipe Line Due To Gradual 
Decreasing Of Water Level At Muraidih Under Amp Colliery
|
| Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
| Tender Id | 2024_BCCL_313019_1 |
|
Reference Number |
BCCL/GM/AR-I/AM (ENM)/E-TENDER/2024-25/152 |
| Tender Fee | 0 |
| EMD | 2200 |
| Tender Value | - |
| Place | AMP COLLIERY BARORA AREA |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=324376 |
| Start Date | July 20, 2024 17:30 |
| End Date |
Expired
31/07/2024
Expired 805 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Shifting of 4000gpm pump motor of jharna face for 04 times with gradual increasing of water level of the sump under muraidih, amp colliery.
Shifting of 4000gpm pump motor of jharna face for 
 04 times with gradual increasing of water level of the 
 sump under muraidih, amp colliery.
Read moreDismantling of two 4000gpm pump motor set with their pipe line from jharna face sump and transporting to socp attendance room premises due to decreasing of water level of jharna sump of muraidih, amp colliery.
Dismantling of two 4000gpm pump motor set with their pipe line from jharna face sump and transporting to socp attendance room premises due to decreasing of water level of jharna sump of muraidih, amp colliery.
Read moreShifting of 4000gpm pump (four times) of sadbhawna pumping face in safe/lower side of the sump (due to gradual decreasing of water level) for water supply to workers colony and chitahi basti under muraidih amp colliery.
Shifting of 4000gpm pump (four times) of sadbhawna pumping face in safe/lower side of the sump (due to gradual decreasing of water level) for water supply to workers colony and chitahi basti under muraidih amp colliery.
Read moreShifting of 4000gpm pump motor of sadbhawna face for 02 times with gradual decreasing of water level of the sump and maintenance of the above pump and its pipeline under muraidih, amp colliery
Shifting of 4000gpm pump motor of sadbhawna face for 02 times with gradual decreasing of water level of the 
 sump and maintenance of the above pump and its pipeline under muraidih, amp colliery
Read more(a)shifting of 4000gpm pump of coalface and jharna face sump for 02times with gradual decreasing of water level and(b)dismantling and transporting of 10inch dia mspipe from idle delivery range of jharna face to attendance room premises under ampc
(a)shifting of 4000gpm pump of coalface and jharna face sump for 02times with gradual decreasing of water level 
 and(b)dismantling and transporting of 10inch dia mspipe from idle delivery range of jharna face to attendance room 
 premises under ampc
Read moreLowering of 4000gpm pump motor of purba face sump for 02 times with gradual decreasing of water level of the sump and other miscellaneous jobs related to pumping and pipe line works of purba face under amp colliery.
Lowering of 4000gpm pump motor of purba 
 face sump for 02 times with gradual decreasing of 
 water level of the sump and other miscellaneous 
 jobs related to pumping and pipe line works of 
 purba face under amp colliery.
Read moreShifting of 4000gpm pump motor of sadbhawna face for with gradual increasing of water level of the sump under muraidih, amp colliery.
Shifting of 4000gpm pump motor of sadbhawna 
 face for with gradual increasing of water level of the sump under muraidih, amp colliery.
Read more(a)shifting of 4000gpm pump motor set of jharna face sump as and when required(04times)for extraction of coal from the floor of the sump and(b)maintenance of 4000gpm pump of jharna face and purba face and their pipeline of muraidih, amp colliery
(a)shifting of 4000gpm pump motor set of jharna face sump as and when required(04times)for extraction of coal from the floor of the sump and(b)maintenance of 4000gpm pump of jharna face and purba face and their pipeline of muraidih, amp colliery
Read moreShifting of 4000gpm ht pump in lower side of the sump three times due to decreasing of water level of main water sump of phularitand, amp colliery.
Shifting of 4000gpm ht pump in lower side of the sump 
 three times due to decreasing of water level of main water 
 sump of phularitand, amp colliery.
Read moreDiversion of 6.6kv overhead line for lowering of 4000gpm motor pump at jharna face due to advancement of coal face in 4th patch muraidih, amp colliery.
Diversion of 6.6kv overhead line for lowering of 4000gpm motor pump at jharna face due to advancement of coal face in 4th patch muraidih, amp colliery.
Read moreof your Industry type