| Particulars | Details |
|---|---|
| Title |
(A) Lowering Two 4000 Gpm Pump Set Of Jharna Sump (B) Installation Of Two Set Of Drum Pontoon In Jharna Sump And Shifting Of Two Set Of 4000 Gpm Pump Set From Ground Level To The Pontoon(c) Maintenance Of Two Ht Pump Of 3rd Patch Sump, Muraidih, Ampc.
|
| Description |
(A) Lowering Two 4000 Gpm Pump Set Of Jharna Sump (B) Installation Of Two Set Of Drum Pontoon In Jharna Sump And Shifting Of Two Set Of 4000 Gpm Pump Set From Ground Level To The Pontoon(c) Maintenance Of Two Ht Pump Of 3rd Patch Sump, Muraidih, Ampc.
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_BCCL_285268_1 |
|
Reference Number |
BCCL/GM/AR-I/AM (ENM)/E-TENDER/2023-24/172 |
| Tender Fee | - |
| EMD | 2289 |
| Tender Value | - |
| Place | ENM DEPARTMENT, BARORA AREA |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | August 05, 2023 23:30 |
| End Date |
Expired
16/08/2023
Expired 1152 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Shifting of 4000gpm pumpmotor set of jharna sump as and when required (03times) with its pipeline for extraction of coal from the floor of the sump and maintenance of 4000gpm pump of jharna face and purba face and their pipe line of muraidih, ampc.
Shifting of 4000gpm pumpmotor set of jharna sump as and when required (03times) with its pipeline for extraction of coal from the floor of the sump and maintenance of 4000gpm pump of jharna face and purba face and their pipe line of muraidih, ampc.
Read more(a)recovery of 10inch dia pipe of idle range of jharna sump and transporting pipes to attendance room premises for repairing (b)shifting of 4000gpm pump of jharna sump to upper bench(c)pipe line rectification and repairing under muraidih,ampc.
(a)recovery of 10inch dia pipe of idle range of jharna sump and transporting pipes to attendance room premises for repairing (b)shifting of 4000gpm pump of jharna sump to upper bench(c)pipe line rectification and repairing 
 under muraidih,ampc.
Read moreLowering of two ht pump motor of coal face sump and extension of its suction pipes, shifting of 4000gpm pump motor of jharna face and extension of its suction pipe of muraidih, amp colliery
Lowering of two ht pump motor of coal face sump and extension of its suction pipes, shifting of 4000gpm pump 
 motor of jharna face and extension of its suction pipe of muraidih, amp colliery
Read moreAssembling, transporting and installation of one 4000gpm pump motor set in purba face sump and erection of its delivery and shifting of a 4000gpm pump motor set from the damaged pontoon to ground level in jharna face sump at muraidih, amp colliery.
Assembling, transporting and installation of one 4000gpm pump motor set in purba face sump and erection of its delivery and shifting of a 4000gpm pump motor set from the damaged pontoon to ground level in jharna face sump at muraidih, amp colliery.
Read moreShifting of 4000gpm pump motor of jharna face for 04 times with gradual increasing of water level of the sump under muraidih, amp colliery.
Shifting of 4000gpm pump motor of jharna face for 
 04 times with gradual increasing of water level of the 
 sump under muraidih, amp colliery.
Read moreDismantling of two 4000gpm pump motor set with their pipe line from jharna face sump and transporting to socp attendance room premises due to decreasing of water level of jharna sump of muraidih, amp colliery.
Dismantling of two 4000gpm pump motor set with their pipe line from jharna face sump and transporting to socp attendance room premises due to decreasing of water level of jharna sump of muraidih, amp colliery.
Read more(a)shifting of 4000gpm pump motor set of jharna face sump as and when required(04times)for extraction of coal from the floor of the sump and(b)maintenance of 4000gpm pump of jharna face and purba face and their pipeline of muraidih, amp colliery
(a)shifting of 4000gpm pump motor set of jharna face sump as and when required(04times)for extraction of coal from the floor of the sump and(b)maintenance of 4000gpm pump of jharna face and purba face and their pipeline of muraidih, amp colliery
Read more(a)shifting of 02nos. 4000gpm pump motor of jarlahi sump 02times for extraction of coal from floor of the sump (b)lowering 03nos. pontoon along with their pump motor due to gradual decreasing of water level of jarlahi main patch sump,ampc.
(a)shifting of 02nos. 4000gpm pump motor of jarlahi sump 02times for extraction of coal from floor of the sump (b)lowering 03nos. pontoon along with their pump motor due to gradual decreasing of water level of jarlahi 
 main patch sump,ampc.
Read moreShifting of 4000gpm pump motor (three times) of jharna face sump and di of its pipe line due to gradual decreasing of water level at muraidih under amp colliery
Shifting of 4000gpm pump motor (three times) of jharna face sump and di of its pipe line due to gradual 
 decreasing of water level at muraidih under amp colliery
Read moreDismantling/withdrawal of damaged drum pontoon main patch sump and trans.to f/b for repair and trans.of another pontoon fromf/b to mainpatch and installation/commission of 4000gpm pump on pontoon and diversion its pipe line at main patch, ampc.
Dismantling/withdrawal of damaged drum pontoon main patch sump and trans.to f/b for repair and trans.of another pontoon fromf/b to mainpatch and installation/commission of 4000gpm pump on pontoon and diversion its pipe line at main patch, ampc.