Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Dismantling / Dis Assembling, Re Erection, Re Installation, Setting And Alignment Of Assemblies / Sub Assemblies After Repairing On As And When Required Basis Within 730 Days Two Years At Chp, Bina Project
|
| Description |
Dismantling / Dis Assembling, Re Erection, Re Installation, Setting And Alignment Of Assemblies / Sub Assemblies After Repairing On As And When Required Basis Within 730 Days Two Years At Chp, Bina Project
|
| Organisation | Northern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_NCL_327641_1 |
|
Reference Number |
B/EM/etender/2024-25/74 Dt. 01.02.2025 |
| Tender Fee | 0 |
| EMD | 98700 |
| Tender Value | - |
| Place | Bina Project |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=339605 |
| Start Date | February 04, 2025 14:30 |
| End Date |
Expired
22/02/2025
Expired 598 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Dismantling/ dis-assembling, re-erection, re-installation, setting and alignment of assemblies / sub-assemblies after repairing on as and when required basis within 730 days in chp, nigahi project
Dismantling/ dis-assembling, re-erection, re-installation, setting and alignment of assemblies / sub-assemblies after repairing on as and when required basis within 730 days in chp, nigahi project
Read moreDismantling/ disassembling, re-erection, re-installation, setting and alignment of assemblies / sub-assemblies after repairing on as and when required basis within 730 days in chp, nigahi project
Dismantling/ disassembling, re-erection, re-installation, setting and alignment of assemblies / sub-assemblies after repairing on as and when required basis within 730 days in chp, nigahi project
Read moreDismantling/ disassembling, re-erection, re-installation, setting and alignment of assemblies / sub-assemblies after repairing on as and when required basis for the period of 730 days (two years) in chp phase 1, khadia project (ncl)
Dismantling/ disassembling, re-erection, re-installation, setting and alignment of assemblies / sub-assemblies after repairing on as and when required basis for the period of 730 days (two years) in chp phase 1, khadia project (ncl)
Read moreMounting and demounting of subassemblies ie ptos, rotary head assemblies, travel motor assemblies, pump assemblies and engines for different models drills machines, working at bina project, as and when required basis.
Mounting and demounting of subassemblies ie ptos, rotary head assemblies, travel motor assemblies, pump assemblies and engines for different models drills machines, working at bina project, as and when required basis.
Read moreCarrying out the structural steel work in all sections of chp, bina project (ncl) on as and when required basis within 730 days.
Carrying out the structural steel work in all sections of chp, bina project (ncl) on as and when required basis within 730 days.
Read moreRepairing / re-alignment / fixing and nut bolt tightening of house wall of 24/96 saurav dragline, working at bina project
Repairing / re-alignment / fixing and nut bolt tightening of house wall of 24/96 saurav dragline, working at bina project
Read moreDismantling and laying of 250/300mm diameter ms pipeline in main sump turra and purewa bottom coal face for 730 days as when required at bina project.
Dismantling and laying of 250/300mm diameter ms pipeline in main sump turra and purewa bottom coal face for 730 days as when required at bina project.
Read moreDismantling, assembling and alignment of the complete generator turbine unit-refurbishment and providing locking arrangement of guide vanes, setting of positioning of all link liver and regulating ring assembly of guide vanes, alignment and assemblin
Dismantling, assembling and alignment of the complete generator turbine unit-refurbishment and providing locking arrangement of guide vanes, setting of positioning of all link liver and regulating ring assembly of guide vanes, alignment and assemblin
Read moreDismantling and laying of 150/200mm dia ms pipeline for turra coal face pumps and purewa bottom coal face pumps for 730 days as when required at bina project.
Dismantling and laying of 150/200mm dia ms pipeline for turra coal face pumps and purewa bottom coal face pumps for 730 days as when required at bina project.
Read moreRepairing/replacement of damaged traverse pipes of 201a/b screen and re-alignment of screen after buffer replacement of kedla washery.
Repairing/replacement of damaged traverse pipes of 201a/b screen and re-alignment of screen after buffer replacement of kedla washery.
Read moreof your Industry type