Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Dismantling/ Disassembling, Re Erection, Re Installation, Setting And Alignment Of Assemblies / Sub Assemblies After Repairing On As And When Required Basis Within 730 Days In Chp, Nigahi Project
|
| Description |
Dismantling/ Disassembling, Re Erection, Re Installation, Setting And Alignment Of Assemblies / Sub Assemblies After Repairing On As And When Required Basis Within 730 Days In Chp, Nigahi Project
|
| Organisation | Northern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2026_NCL_358143_1 |
|
Reference Number |
NGH/EM/e-Tender/26-27/03 dated 08.04.2026 |
| Tender Fee | 0 |
| EMD | 71200 |
| Tender Value | - |
| Place | NCL Nigahi Project |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=371027 |
| Start Date | April 09, 2026 16:30 |
| End Date |
Expired
24/04/2026
Expired 176 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Dismantling/ dis-assembling, re-erection, re-installation, setting and alignment of assemblies / sub-assemblies after repairing on as and when required basis within 730 days in chp, nigahi project
Dismantling/ dis-assembling, re-erection, re-installation, setting and alignment of assemblies / sub-assemblies after repairing on as and when required basis within 730 days in chp, nigahi project
Read moreDismantling/ disassembling, re-erection, re-installation, setting and alignment of assemblies / sub-assemblies after repairing on as and when required basis for the period of 730 days (two years) in chp phase 1, khadia project (ncl)
Dismantling/ disassembling, re-erection, re-installation, setting and alignment of assemblies / sub-assemblies after repairing on as and when required basis for the period of 730 days (two years) in chp phase 1, khadia project (ncl)
Read moreDismantling / dis-assembling, re-erection, re-installation, setting and alignment of assemblies / sub-assemblies after repairing on as and when required basis within 730 days two years at chp, bina project
Dismantling / dis-assembling, re-erection, re-installation, setting and alignment of assemblies / sub-assemblies after repairing on as and when required basis within 730 days two years at chp, bina project
Read moreRe routing of water supply line falling in the alignment of ec3 conveyor of phase iv chp at nigahi project
Re routing of water supply line falling in the alignment of ec3 conveyor of phase iv chp at nigahi project
Read moreDay to day maintenance of internal electrification works of chp and other industrial/service buildings at nigahi project for 730 days
Day to day maintenance of internal electrification works of chp and other industrial/service buildings at nigahi project for 730 days
Read moreRepairing and denting works of various sub-assemblies of cat789d 190t dumpers for a period of 730 days (two years) at nws nigahi project
Repairing and denting works of various sub-assemblies of cat789d 190t dumpers for a period of 730 days (two years) at nws nigahi project
Read moreRepairing and denting works of various sub-assemblies of cat789d 190t dump-ers for a period of 730 days (two years) at nws nigahi project
Repairing and denting works of various sub-assemblies of cat789d 190t dumpers for a period of 730 days (two years) at nws nigahi project
Read moreLaying of conveyor belting and stacking of damaged/worn out belting 1600mm wide of different conveyor belts for two years(730 days) at nigahi chp.
Laying of conveyor belting and stacking of damaged/worn out belting 1600mm wide of different conveyor belts for two years(730 days) at nigahi chp.
Read moreCarrying out the structural steel work in all sections of chp, bina project (ncl) on as and when required basis within 730 days.
Carrying out the structural steel work in all sections of chp, bina project (ncl) on as and when required basis within 730 days.
Read moreDismantling, repairing and re-erection of 01 nos. swing chute assembly and 02 no. flow control gate for use at rapid loading systems of nigahi chp at nigahi project
Dismantling, repairing and re-erection of 01 nos. swing chute assembly and 02 no. flow control gate for use at rapid loading systems of nigahi chp at nigahi project
Read moreof your Industry type