Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Dismantling, Repairing And Re Erection Of 01 Nos. Swing Chute Assembly And 02 No. Flow Control Gate For Use At Rapid Loading Systems Of Nigahi Chp At Nigahi Project
|
| Description |
Dismantling, Repairing And Re Erection Of 01 Nos. Swing Chute Assembly And 02 No. Flow Control Gate For Use At Rapid Loading Systems Of Nigahi Chp At Nigahi Project
|
| Organisation | Northern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_NCL_311102_1 |
|
Reference Number |
NGH/EM/e-Tender/24-25/29 dtd. 24.06.2024 |
| Tender Fee | 0 |
| EMD | 4300 |
| Tender Value | - |
| Place | NCL Nigahi Area |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=322398 |
| Start Date | June 25, 2024 16:30 |
| End Date |
Expired
05/07/2024
Expired 830 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Dismantling and repairing of damaged/worn out ss liner from charging chute and removal of jammed coal from silo-2 of rajmahal chp.
Dismantling and repairing of damaged/worn out ss liner from charging chute and removal of jammed coal from silo-2 of rajmahal chp.
Read moreHiring of 4nos of front end loaders of capacity 3.0 -3.5cu.m with 24hours availability on weight(tonnage) basis for a period of 2 years for use at loading of coal into railway wagons at wharfloading platform chp,yellandu area.
Hiring of 4nos of front end loaders of capacity 3.0 -3.5cu.m with 24hours availability on weight(tonnage) basis for a period of 2 years for use at loading of coal into railway wagons at wharfloading platform chp,yellandu area.
Read moreEpc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Read moreDismantling, repairing and re-erection of 01 nos. swing chute assembly and 02 no. flow control gate for use at rapid loading systems of nigahi chp at nigahi project
Dismantling, repairing and re-erection of 01 nos. swing chute assembly and 02 no. flow control gate for use at rapid loading systems of nigahi chp at nigahi project
Read moreRepairing of swing chute and flow control gate assembly at railway side of silo phase-i at chp, dudhichua
Repairing of swing chute and flow control gate assembly at railway side of silo phase-i at chp, dudhichua
Read moreDismantling, fabrication, repairing of pre-weigh hopper structure and repositioning of swing chute flow control gate assembly with proper alignment at silo line number-02 in amlohri chp phase-ii.
Dismantling, fabrication, repairing of pre-weigh hopper structure and repositioning of swing chute flow control gate assembly with proper alignment at silo line number-02 in amlohri chp phase-ii.
Read moreDismantling and erection of conveyor 5c1 discharge chute of chp kakri project
Dismantling and erection of conveyor 5c1 discharge chute of chp kakri project
Read moreDismantling, fabrication and erection of take up trolley of the conveyor 2c and discharge chute of the double roll crusher at western chp nigahi project
Dismantling, fabrication and erection of take up trolley of the conveyor 2c and discharge chute of the double roll crusher at western chp nigahi project
Read moreof your Industry type