Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repairing Of Swing Chute And Flow Control Gate Assembly At Railway Side Of Silo Phase I At Chp, Dudhichua
|
| Description |
Repairing Of Swing Chute And Flow Control Gate Assembly At Railway Side Of Silo Phase I At Chp, Dudhichua
|
| Organisation | Northern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_NCL_300514_1 |
|
Reference Number |
DCH/EnM/Tender/CHP/23-24/080 |
| Tender Fee | 0 |
| EMD | 5400 |
| Tender Value | |
| Place | Dudhichua NCL |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=311284 |
| Start Date | February 07, 2024 16:30 |
| End Date |
Expired
16/02/2024
Expired 877 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Dismantling, fabrication, repairing of pre-weigh hopper structure and repositioning of swing chute flow control gate assembly with proper alignment at silo line number-02 in amlohri chp phase-ii.
Dismantling, fabrication, repairing of pre-weigh hopper structure and repositioning of swing chute flow control gate assembly with proper alignment at silo line number-02 in amlohri chp phase-ii.
Read moreInstallation, commissioning and testing of swing chute with flow control gate assembly along with the all the accessories of dudhichua project
Installation, commissioning and testing of swing chute with flow control gate assembly along with the all the accessories of dudhichua project
Read moreDismantling, repairing and re-erection of 01 nos. swing chute assembly and 02 no. flow control gate for use at rapid loading systems of nigahi chp at nigahi project
Dismantling, repairing and re-erection of 01 nos. swing chute assembly and 02 no. flow control gate for use at rapid loading systems of nigahi chp at nigahi project
Read moreDismantling, repairing and re-erection of 01 nos. swing chute assembly and 02 no. flow control gate for use at rapid loading systems of nigahi chp at nigahi project
Dismantling, repairing and re-erection of 01 nos. swing chute assembly and 02 no. flow control gate for use at rapid loading systems of nigahi chp at nigahi project
Read moreReplacement of pre-weigh hopper liner of pr and mgr side of silo phase-i at chp, dudhichua
Replacement of pre-weigh hopper liner of pr and mgr side of silo phase-i at chp, dudhichua
Read moreDismantling, overhauling and re-installation of 08 nos. discharge gate, maintenance gate at rls silo-i chp,dudhichua project
Dismantling, overhauling and re-installation of 08 nos. discharge gate, maintenance gate at rls silo-i chp, dudhichua project
Read moreReplacement of worn-out ss liners of pre-weigh hopper and swing chutes installed at the rapid loading system (rls) of silo-i and silo-ii (mgr side) at chp dudhichua
Replacement of worn-out ss liners of pre-weigh hopper and swing chutes installed at the rapid loading system (rls) of silo-i and silo-ii (mgr side) at chp dudhichua
Read moreRepairing of apron feeder and its accessories of phase ii at chp dudhichua
Repairing of apron feeder and its accessories of phase ii at chp dudhichua
Read moreof your Industry type