Tender Details
Particulars | Details |
---|---|
Title |
Dismantling, Fabrication, Repairing Of Pre Weigh Hopper Structure And Repositioning Of Swing Chute Flow Control Gate Assembly With Proper Alignment At Silo Line Number 02 In Amlohri Chp Phase Ii.
|
Description |
Dismantling, Fabrication, Repairing Of Pre Weigh Hopper Structure And Repositioning Of Swing Chute Flow Control Gate Assembly With Proper Alignment At Silo Line Number 02 In Amlohri Chp Phase Ii.
|
Organisation | Northern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_NCL_315180_1 |
Reference Number |
AML/SO/ENM/ETN/24/595 |
Tender Fee | 0 |
EMD | 2500 |
Tender Value | |
Place | Amlohri Project, NCL |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=326670 |
Start Date | August 17, 2024 14:30 |
End Date |
27/08/2024 ( Expired 271 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Steel structural work for complete dismantling, fabrication and erection of deck sheets, chequered plates with supporting structure along with foundation strengthening in crusher house, conveyor 8c,9c,10c,11c,1c and 2c in chp phase-i and phase-ii
Steel structural work for complete dismantling, fabrication and erection of deck sheets,chequered plates with supporting structure along with foundation strengthening in crusher house,conveyor 8c,9c,10c,11c,1c and 2c in chp phase-i and phase-ii
Read moreDismantling of unused 28 span of 440 v, 3 phase, 4 wire o/h line from silo/rls to 20 mw solar power plant construction site with fabrication and fixing of 02 nos. tubular pole make lighting tower and some related 440 v o/h line work at bahera durga m
Dismantling of unused 28 span of 440 v, 3 phase, 4 wire o/h line from silo/rls to 20 mw solar power plant construction site with fabrication and fixing of 02 nos. tubular pole make lighting tower and some related 440 v o/h line work at bahera durga m
Read moreRepairing /maintenance and fabrication of platform structure for weigh bridge no.01, 10 and bs-ii bachra siding under chp-cpp, ppr.
Repairing /maintenance and fabrication of platform structure for weigh bridge no.01, 10 and bs-ii bachra siding under chp-cpp, ppr.
Read moreOverhauling of apron feeder assembly and dismantling and fabrication of crusher discharge and apron discharge chutes installed in chp phase-i at amlohri project
Overhauling of apron feeder assembly and dismantling and fabrication of crusher discharge and apron discharge chutes installed in chp phase-i at amlohri project
Read moreDismantling, overhauling and re-installation of 12 no discharge gates, maintenance gates at rls line no1, 2 and 3 in amlohri chp phase-i and phase-ii
Dismantling, overhauling and re-installation of 12 no discharge gates, maintenance gates at rls line no1, 2 and 3 in amlohri chp phase-i and phase-ii
Read moreComplete dismantling, fabrication and fixing/erection of take-up pulley chequered floor area, side support structure ,take-up pulley frame, guide pipe/rails of conveyor 11c in amlohri chp phase-ii.
Complete dismantling, fabrication and fixing/erection
 of take-up pulley chequered floor area, side support
 structure ,take-up pulley frame, guide pipe/rails of
 conveyor 11c in amlohri chp phase-ii.
Read moreRepairing /maintenance and fabrication of platform structure for weigh bridge no. 02 and bs-i bachra siding under chp-cpp/ppr.
Repairing /maintenance and fabrication of platform structure for weigh bridge no. 02 and bs-i bachra siding under chp-cpp/ppr.
Read moreRepairing /maintenance and fabrication of platform structure for weigh bridge no. 02 and bs-i bachra siding under chp-cpp/ppr.
Repairing /maintenance and fabrication of platform structure for weigh bridge no. 02 and bs-i bachra siding under chp-cpp/ppr.
Read moreDismantling, fabrication, repairing of pre-weigh hopper structure and repositioning of swing chute flow control gate assembly with proper alignment at silo line number-02 in amlohri chp phase-ii.
Dismantling, fabrication, repairing of pre-weigh hopper structure and repositioning of swing chute flow control gate assembly with proper alignment at silo line number-02 in amlohri chp phase-ii.
Read moreDismantling, fabrication and erection for repairing of c2 conveyor primary motor, gearbox, fluid coupling, gear coupling, base structure and conveyor drums along with its alignment and replacement of conveyor drums at new silo, bocp.
Dismantling, fabrication and erection for repairing of c2 conveyor primary motor, gearbox, fluid coupling, gear coupling, base structure and conveyor drums along with its alignment and replacement of conveyor drums at new silo, bocp.
Read moreof your Industry type