Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Proper Road Lighting Arrangement At 4214 Substation To Silo Loading Point Along Conveyor Belt 1019 Under Chp Cpp, Ppr.
|
| Description |
Proper Road Lighting Arrangement At 4214 Substation To Silo Loading Point Along Conveyor Belt 1019 Under Chp Cpp, Ppr.
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_CCL_303954_1 |
|
Reference Number |
PE/Elect./CHP/PPR/23-24/88 |
| Tender Fee | 0 |
| EMD | 4200 |
| Tender Value | - |
| Place | OFFICE OF PO CHP-CPP, Piparwar Area, CCL |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=314866 |
| Start Date | March 06, 2024 22:30 |
| End Date |
Expired
14/03/2024
Expired 941 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Read moreProper lighting arrangement at dump hopper path/transporting road for smooth coal transportation loading at dump hopper bunker under chp-cpp,ppr.
Proper lighting arrangement at dump hopper path/transporting road for smooth coal transportation loading at dump hopper bunker under chp-cpp,ppr.
Read moreRecovering and laying of 11 kv, 120 sq.mm, 3 core aluminum power cable from 4213 sub-station and 4214 sub-station under chp-cpp/ppr.
Recovering and laying of 11 kv, 120 sq.mm, 3 core aluminum power cable from 4213 sub-station and 4214 sub-station under chp-cpp/ppr.
Read moreProper earthing arrangement of rehabilitation area transformer (08 nos.) installed at different location for safety of transformer under chp-cpp/ppr.
Proper earthing arrangement of rehabilitation area transformer (08 nos.) installed at different location for safety of transformer under chp-cpp/ppr.
Read moreShifting of weightometer which includes dismantling, fabrication and erection of weightometer from 1019 conveyer to 1028 conveyor under chp-cpp, piparwar area.
Shifting of weightometer which includes dismantling, fabrication and erection of weightometer from 1019 conveyer to 1028 conveyor under chp-cpp, piparwar area.
Read moreProviding and fixing v belts in de watering screen under chp-cpp/ppr.
Providing and fixing v belts in de watering screen under chp-cpp/ppr.
Read moreCleaning and re-handling of spillage coal from different place like tail end of conveyor belt 1019, transfer point 1104, transporting road along magadha nalla and coal spillage in below silo at chp-cpp, piparwar area.
Cleaning and re-handling of spillage coal from different place like tail end of conveyor belt 1019, transfer point 1104, transporting road along magadha nalla and coal spillage in below silo at chp-cpp, piparwar area.
Read moreDemounting, dismantling, repairing, re-assembling, fitment and testing of complete assembly of gear box kza 360 of conveyor 1018 under chp-cpp, ppr.
Demounting, dismantling, repairing, re-assembling, fitment and testing of complete assembly of gear box kza 360 of conveyor 1018 under chp-cpp, ppr.
Read moreRemoval of coal from conveyor galleries of silo system of chp
Removal of coal from conveyor galleries of silo system of chp
Read moreReplacement of damage insulators, stay set , iron bracket and tensioning of 440 v o/h line conductors at bachra siding under chp-cpp/ppr. due to damage by transporting truck under chp-cpp, ppr.
Replacement of damage insulators, stay set , iron bracket and tensioning of 440 v o/h line conductors at bachra siding under chp-cpp/ppr. due to damage by transporting truck under chp-cpp, ppr.
Read moreof your Industry type