Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Annual Maintenance Service Contract For Weighing Equipments At Wagon Tippler And Track Hopper Of M/S Avery India Pvt Ltd., Make For The Year 2027 In Chp At Ktps V And Vi Stages
|
| Description |
Annual Maintenance Service Contract For Weighing Equipments At Wagon Tippler And Track Hopper Of M/S Avery India Pvt Ltd., Make For The Year 2027 In Chp At Ktps V And Vi Stages
|
| Organisation | TELANGANA POWER GENERATION CORPORATION LIMITED-CE KTPS V & VI STAGE |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | - |
| EMD | - |
| Tender Value | 4.08 Lakh |
| Place | Telangana |
| Link | Login to view |
| Start Date | October 16, 2026 23:30 |
| End Date |
Open
02/11/2026
16 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ktps-vii stage-chp-mm-charges for reconditioning of wagon tippler , side arm charger and stacker cum reclaimer hydraulic cylinders.
Ktps-vii stage-chp-mm-charges for reconditioning of wagon tippler , side arm charger and stacker cum reclaimer hydraulic cylinders.
Read moreReconstruction of damaged bearing pedestals of wagon tippler 1 at chp btps
Reconstruction of damaged bearing pedestals of wagon tippler - 1 at chp,ballari themal power station (btps)
Read moreProcurement of conveyor pulley lagging sheets, wagon tippler clamp pad, wagon tippler side beam wear pad, cushioning pad for side arm charger and duel lip sealing system rubber block with clamp plate for chp-i, 2x600mw, and chp-ii, 2x660mw, sstpp.
Procurement of conveyor pulley lagging sheets, wagon tippler clamp pad, wagon tippler side beam wear pad, cushioning pad for side arm charger and duel lip sealing system rubber block with clamp plate for chp-i, 2x600mw, and chp-ii, 2x660mw, sstpp.
Read moreSupply, dismantling, erection and commissioning of apron feeder bottom hopper chute installed at wagon tippler system, sgtps, mppgcl, birsinghpur.
Supply, dismantling, erection and commissioning of apron feeder bottom hopper chute installed at wagon tippler system, sgtps, mppgcl, birsinghpur.
Read moreSupply and commissioing of ups with battery for emergency light in underground conveyorsand wagon tippler complex in chp telangana
Supply and commissioing of ups with battery for emergency light in underground conveyorsand wagon tippler complex in chp telangana
Read moreDeputation of service engineer for inspection and to find out any complaints for the belt pro make hot vulcanizing machines in mm/chp/ktps v and vi stages.
Deputation of service engineer for inspection and to find out any complaints for the belt pro make hot vulcanizing machines in mm/chp/ktps v and vi stages.
Read moreAnnual maintenance service contract for skf-lincoln make centralized dual line lubrication systems at the new stacker reclaimer machine in chp, ktps v and vi stages for the year 2026-27.
Annual maintenance service contract for skf-lincoln make centralized dual line lubrication systems at the new stacker reclaimer machine in chp, ktps v and vi stages for the year 2026-27.
Read moreBiennial 02 years work contract for operation and maintenance along with housekeeping of coal handling plant chp i 4x210mw and wagon tippler along with alternate coal path and chp ii of 1x500 mw and manual unloading of coal from coal rake at sgtps
Biennial 02 years work contract for operation and maintenance along with housekeeping of coal handling plant chp i 4x210mw and wagon tippler along with alternate coal path and chp ii of 1x500 mw and manual unloading of coal from coal rake at sgtps
Read moreComprehensive amc for hitachi make electronic interlocking ei stationof track hopper control room central yard east cabin east m3 yard west cabin west m4 yard of wagon tippler line at ntpc sipat for twoyears 2026 28
Comprehensive amc for hitachi make electronic interlocking ei stationof track hopper control room central yard east cabin east m3 yard west cabin west m4 yard of wagon tippler line at ntpc sipat for twoyears 2026 28
Read moreKtps-v- cam- strengthening of supporting columns of feed gate 10a and 10b and laying of painting over the bottom ash hopper peripheral area and its associated structural steel members of unit-10 in the year 2026-2027.-reg
Ktps-v- cam- strengthening of supporting columns of feed gate 10a and 10b and laying of painting over the bottom ash hopper peripheral area and its associated structural steel members of unit-10 in the year 2026-2027.-reg
Read moreof your Industry type