Tender Details

Particulars Details
Title
Dismantling And Laying Of 250/300mm Dia Ms Pipeline In Main Sump (Turra) And Purewa Bottom Coal Face As When Required During Monsoon 2025 At Bina Project.
Description
Dismantling And Laying Of 250/300mm Dia Ms Pipeline In Main Sump (Turra) And Purewa Bottom Coal Face As When Required During Monsoon 2025 At Bina Project.
Organisation Northern Coalfields Limited | Public Sector Undertakings
Tender Id 2025_NCL_333203_1
Reference
Number
B/EM/eTender/2024-25/93 dt. 24.03.2025
Tender Fee 0
EMD 13400
Tender Value
Place Bina Project
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=345423
Start Date March 26, 2025 14:30
End Date

07/04/2025 ( Expired 35 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
The dismantling and erection of poles for as and when required overhead ht and lt works in the mine lease hold of giridih oc mine until monsoon end period 2025-26, giridih project, giridih area

The dismantling and erection of poles for as and when required overhead ht and lt works in the mine lease hold of giridih oc mine until monsoon end period 2025-26, giridih project, giridih area

Read more
Regular shifting and erection of pipeline at giridh oc mine, giridih project in view of pre and post monsoon as per approved monsoon action plan 2025.

Regular shifting and erection of pipeline at giridh oc mine, giridih project in view of pre and post monsoon as per approved monsoon action plan 2025.

Read more
Dismantling laying pipe cutting jointing (welding) etc of 6 inch-300 mtr 8 inch dia-200 mtr 4 inch- 150 mtr. pipeline for shifting of pumps at main sump firefighting locations and others as and whenever required under ttk ocp rajhara area

Dismantling laying pipe cutting jointing (welding) etc of 6 inch-300 mtr 8 inch dia-200 mtr 4 inch- 150 mtr. pipeline for shifting of pumps at main sump firefighting locations and others as and whenever required under ttk ocp rajhara area

Read more
Manufacture, supply, lowering, laying, jointing and testing of 450/200mm dia ms pipe

Manufacture, supply, delivery, and laying of 450/200 mm diameter ms/di pipes in place of existing water supply feeder main from the iocl petrol pump to trident hotel, including the junction works on the 600mm diameter ms pipe at trident hotel, in the road widening portion by tgiic, aimed at easing traffic congestion from iocl to trident hotel, under madhapur i section, sd i o and m division xv, durgam cheruvu

Read more
Manufacture, supply, lowering, laying, jointing and testing of 600mm dia ms pipe

Manufacture, supply, delivery and laying of 600mm diameter ms water supply feeder main in place of existing water supply line from trident hotel to shilparamam in the road widening portion by tgiic, aimed at easing traffic congestion at trident hotel, under the madhapur i section, sub division i, o and m division xv, durgamcheruvu.

Read more
Shifting, laying and fitting of different dia. pipeline with flange welding and dismantling of old ms pipeline as well as dismantling and shifting of pumps at different sumps, delivery/ suction pipe extension or shortening with float etc

Shifting, laying and fitting of different dia. pipeline with flange welding and dismantling of old ms pipeline as well as dismantling and shifting of pumps at different sumps, delivery/ suction pipe extension or shortening with float etc

Read more
Deployment of pc-210 (2 nos) with tipper (2 nos) for cleaning/removal of accumulated slush / muck on the side of berms and laying of hume pipe including excavation as and when required during monsoon at dipka expansion project of dipka area

Deployment of pc-210 (2 nos) with tipper (2&#x0d nos) for cleaning/removal of accumulated slush / muck on the side&#x0d of berms and laying of hume pipe including excavation as and when&#x0d required during monsoon at dipka expansion project of dipka&#x0d area

Read more
Pipeline work at east zone (bahanpath and bhatora) sump for monsoon 25-26 on as and when required basis in gevra project.

Pipeline work at east zone (bahanpath and bhatora) sump for monsoon 25-26 on as and when required basis in gevra project.

Read more
Ktps-v-cam-transportation of material, t and p, ms erw pipes, various scrap material, ash, coal, silt and debris etc by engaging tractor (including carrier) from section store to ash pond / internal transportation from one spot to another spot at ash pond and inside plant premises as and when required as per the directions of in charge engineer at site, during the period from 01-04-2025 (or from actual date of utilization) to 31 -03 - 2026-reg.

Ktps-v-cam-transportation of material, t and p, ms erw pipes, various scrap material, ash, coal, silt and debris etc by engaging tractor (including carrier) from section store to ash pond / internal transportation from one spot to another spot at ash pond and inside plant premises as and when required as per the directions of in charge engineer at site, during the period from 01-04-2025 (or from actual date of utilization) to 31 -03 - 2026-reg.

Read more
Providing, laying, jointing, testing and commissioning of 110,160,200 and 250 mm dia h.p.d.e. pipeline at aanchal nagar colony and different street scheme 140 of zone no.19 ward no.50 (as per schedule)

Providing, laying, jointing, testing and commissioning of&amp#x0d 110,160,200 and 250 mm dia h.p.d.e. pipeline at aanchal nagar&amp#x0d colony and different street scheme 140 of zone no.19 ward no.50 (as&amp#x0d per schedule)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise