Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🔋 Erection And Dismantle Services For Lt Overhead Transmission Line 🔋 Northern Coalfields Limited, A Public Sector Undertaking, Is Seeking Bids For The Provision Of Erection And Dismantle Services For A Low Tension (Lt) Overhead Transmission Line At The Krishnashila Project. 🏭🌬️ Bids Must Be Submitted By 10/05/2024, 10:00 Am, With An Earnest Money Deposit (Emd) Of Inr 56,600. Interested Bidders Should Possess The Necessary Technical Expertise And Resources To Undertake The Erection And Dismantle Of The Transmission Line As Required Over A Period Of 730 Days. Keywords: Erection And Dismantle, Lt Overhead Transmission Line, Northern Coalfields Limited, Public Sector Undertaking, Krishnashila Project, Tender, Bid, Emd| Particulars | Details |
|---|---|
| Title |
Erection And Dismantle Of Lt Overhead Transmission Line As And When Required For 730 Days At Krishnashila Project.
|
| Description |
Erection And Dismantle Of Lt Overhead Transmission Line As And When Required For 730 Days At Krishnashila Project.
|
| Organisation | Northern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_NCL_307190_1 |
|
Reference Number |
NCL/KSL/EnM/Tender/2024/04 Dated 28.04.2024 |
| Tender Fee | 0 |
| EMD | 56600 |
| Tender Value | - |
| Place | Krishnashila Project |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=318320 |
| Start Date | April 30, 2024 15:30 |
| End Date |
Expired
10/05/2024
Expired 888 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Erection of lt and ht metallic electrical poles with overhead lines and other required ohl structures at different locations along with dismantling of lt and ht poles, ohl and other ohl structures damaged during thundering, tree felling, heavy rains
Erection of lt and ht metallic electrical poles with overhead lines and other required ohl structures at different locations along with dismantling of lt and ht poles, ohl and other ohl structures damaged during thundering, tree felling, heavy rains
Read moreRepairing rectification of damage of lt ht overhead line dismantling shifting and erection of conductor of overhead line in different places in adarsh nagar colony after comes heavy storm under ta eandm kusmunda area
Repairing rectification of damage of lt ht overhead line dismantling shifting and erection of conductor of overhead line in different places in adarsh nagar colony after comes heavy storm under ta eandm kusmunda area
Read moreDay-to-day work of dismantling, erection, and maintenance of 11 kv, 3.3 kv, and lt overhead lines, including dismantling and erection of light fittings mounted on poles, structures, and high mast towers, etc., at the surface area of ananta ocp, ja.
Day-to-day work of dismantling, erection, and maintenance of 11 kv, 3.3 kv, and lt overhead lines, including dismantling and erection of light fittings mounted on poles, structures, and high mast towers, etc., at the surface area of ananta ocp, ja.
Read moreErection and dismantle of ht overhead line for monsoon 2024 as and when required, at krishnashila project.
Erection and dismantle of ht overhead line for monsoon 2024 as and when required, at krishnashila project.
Read moreErection and dismantle of ht overhead transmission line as and when required for one year at krishnashila project.
Erection and dismantle of ht overhead transmission line as and when required for one year at krishnashila project.
Read moreMinor repair and diversion of 33kv and 6.6kv overhead line as and when required for a period of 730 days
Minor repair and diversion of 33kv and 6.6kv overhead line as and when required for a period of 730 days
Read moreErection, dismantling and shifting of lt overhead line at mine area of block-b project for 730 days.
Erection, dismantling and shifting of lt overhead line at mine area of block-b project for 730 days.
Read moreErection and dismantling of 220v/440v overhead line on as and when required basis for the period of 365 days at birsa project
Erection and dismantling of 220v/440v overhead line on as and when required basis for the period of 365 days at birsa project
Read moreExtension/ erection of lt overhead line (approx route length for erection/ extension is 1.5km and dismantling of lt line(app route length for dismantling is 750 mtr) for period of 1 year(365 days) on as when and where required basis
Extension/ erection of lt overhead line (approx route length for erection/ extension is 1.5km and dismantling of lt line(app route length for dismantling is 750 mtr) for period of 1 year(365 days) on as when and where required basis
Read moreErection, dismantling and shifting of ht overhead line at mine area of block-b project for 730 days.
Erection, dismantling and shifting of ht overhead line at mine area of block-b project for 730 days.
Read moreof your Industry type