| Particulars | Details |
|---|---|
| Title |
Mtps I Mill Plant Unit Ii Cutting Removing Of Existing Worn Out Mill Separator Curved Liners And Erection Of New Ms Liners In Mill 2 A To 2 F During Coh 2024 25
|
| Description |
Mtps I Mill Plant Unit Ii Cutting Removing Of Existing Worn Out Mill Separator Curved Liners And Erection Of New Ms Liners In Mill 2 A To 2 F During Coh 2024 25
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_497993_1 |
|
Reference Number |
CE / MTPS-I / SE / M-I / MP /OT.240/ 2024-25 |
| Tender Fee | 0 |
| EMD | 4200 |
| Tender Value | - |
| Place | Mettur Thermal Power Station-I / Mettur Dam |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=591698 |
| Start Date | October 30, 2024 22:30 |
| End Date |
Expired
13/11/2024
Expired 700 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mtps i mill plant unit ii overhauling of gravimetric feeders and clean out conveyor of mill 2a to 2f during aoh 2026 2027
Mtps i mill plant unit ii overhauling of gravimetric feeders and clean out conveyor of mill 2a to 2f during aoh 2026 2027
Read moreMtps i mill plant unit ii complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 2a to 2f
Mtps i mill plant unit ii complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 2a to 2f
Read moreMtps i mill plant ii complete overhauling of gearbox mechanical face seal assembly worm shaft assembly replacing the worn out bulged insulation cover plate assembly scrapper assembly and worn out flexi coupling etc in mills 2a to 2f during aoh
Mtps i mill plant ii complete overhauling of gearbox mechanical face seal assembly worm shaft assembly replacing the worn out bulged insulation cover plate assembly scrapper assembly and worn out flexi coupling etc in mills 2a to 2f during aoh
Read moreMtps i mill plant unit ii patch welding of eroded portion of hot air ducts joints and coal mill 2a to 2f vertical inlet area above the horizontal area and below the expansion joint providing insulation for pa inlet duct in coal mills 2a to 2f during
Mtps i mill plant unit ii patch welding of eroded portion of hot air ducts joints and coal mill 2a to 2f vertical inlet area above the horizontal area and below the expansion joint providing insulation for pa inlet duct in coal mills 2a to 2f during
Read moreMtps i mill plant unit ii removal of accumulated ash from the horizontal portions of the mill inlet pa hot air duct at 4 5 mtr 18 mtr level for mills 2a to 2f during annual overhaul 2026 27
Mtps i mill plant unit ii removal of accumulated ash from the horizontal portions of the mill inlet pa hot air duct at 4 5 mtr 18 mtr level for mills 2a to 2f during annual overhaul 2026 27
Read moreMtps i mill plant unit ii fabrication of various length of 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 2a to 2f and dismantling of seal air fan motor and overhauling reassembling setting the alignment
Mtps i mill plant unit ii fabrication of various length of 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 2a to 2f and dismantling of seal air fan motor and overhauling reassembling setting the alignment
Read moreMtps i mill plant unit ii strengthening rectification of raw coal bunkers 2a 2b 2c leak arresting work by patch welding and providing stiffeners during aoh 2026 27
Mtps i mill plant unit ii strengthening rectification of raw coal bunkers 2a 2b 2c leak arresting work by patch welding and providing stiffeners during aoh 2026 27
Read moreMtps i mill plant unit ii overhauling of tramp iron chute knife edge gate valves strengthening of reject chute mouth area at under bowl and repairing the cracks of tramp iron chute outside the mill base of mills renewal of the worn out mill
Mtps i mill plant unit ii overhauling of tramp iron chute knife edge gate valves strengthening of reject chute mouth area at under bowl and repairing the cracks of tramp iron chute outside the mill base of mills renewal of the worn out mill
Read moreMtps i mill plant unit iv cutting removing of existing worn out mill separator curved liners and erection of new ms liners in mill 4a to 4f during aoh 2024 25
Mtps i mill plant unit iv cutting removing of existing worn out mill separator curved liners and erection of new ms liners in mill 4a to 4f during aoh 2024 25
Read moreMtps i mill plant unit ii filtration and purification of the contaminated gear box oil of the coal mills 2a to 2f during coh 2024 25
Mtps i mill plant unit ii filtration and purification of the contaminated gear box oil of the coal mills 2a to 2f during coh 2024 25
Read moreof your Industry type