Tender Details
Particulars | Details |
---|---|
Title |
Mtps I Mill Plant Unit Ii Cutting Removing Of Existing Worn Out Mill Separator Curved Liners And Erection Of New Ms Liners In Mill 2 A To 2 F During Coh 2024 25
|
Description |
Mtps I Mill Plant Unit Ii Cutting Removing Of Existing Worn Out Mill Separator Curved Liners And Erection Of New Ms Liners In Mill 2 A To 2 F During Coh 2024 25
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_497993_1 |
Reference Number |
CE / MTPS-I / SE / M-I / MP /OT.240/ 2024-25 |
Tender Fee | 0 |
EMD | 4200 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=591698 |
Start Date | October 30, 2024 22:30 |
End Date |
13/11/2024 ( Expired 207 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Nctps i operation circle ca dn dm and ro plant dismantling the existing wornout line fabrication rubber lining and erection of new msrl pipe bend t piece and reducer in pressure sand filter i ii iii iv and v inlet and outlet connecting pipe lines
Nctps i operation circle ca dn dm and ro plant dismantling the existing wornout line fabrication rubber lining and erection of new msrl pipe bend t piece and reducer in pressure sand filter i ii iii iv and v inlet and outlet connecting pipe lines
Read moreNctps i se m ii ahp dn unit i overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in a pass
Nctps i se m ii ahp dn unit i overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in a pass
Read moreNctps i se m ii ahp dn unit ii overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in b pass
Nctps i se m ii ahp dn unit ii overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in b pass
Read moreNctps i se m ii ahp dn unit i overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in b pass
Nctps i se m ii ahp dn unit i overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in b pass
Read moreNctps i operation ca rwph dismantling the existing worn out damaged reject water ms erw pipe line 100 nb and erection of mild steel electric resistance welded 100nb new ms erw pipes and bend from ro stream to reject water tank dismantling the existin
Nctps i operation ca rwph dismantling the existing worn out damaged reject water ms erw pipe line 100 nb and erection of mild steel electric resistance welded 100nb new ms erw pipes and bend from ro stream to reject water tank dismantling the existin
Read moreNctps i se m ii ahp dn unit ii overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work carried out in a pass of bah
Nctps i se m ii ahp dn unit ii overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work carried out in a pass of bah
Read moreMtps i mill plant unit i overhaul of hot air dampers cold air dampers cold air gates hot air gate power cylinder renewal of hot air gate seal during annual over hauling of 2025 26
Mtps i mill plant unit i overhaul of hot air dampers cold air dampers cold air gates hot air gate power cylinder renewal of hot air gate seal during annual over hauling of 2025 26
Read moreMtps i mill plant unit i fabrication of ms bend 10 deg 15 deg 22 deg to suit 508 mm 12 70 mm thick coal pipe line during aoh 2025 26
Mtps i mill plant unit i fabrication of ms bend 10 deg 15 deg 22 deg to suit 508 mm 12 70 mm thick coal pipe line during aoh 2025 26
Read moreMtps i mill plant unit i fabrication of various length of dia 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 1a to 1f and dismantling of seal air fan motor and overhauling reassembling setting the alignment
Mtps i mill plant unit i fabrication of various length of dia 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 1a to 1f and dismantling of seal air fan motor and overhauling reassembling setting the alignment
Read moreMtps i mill plant unit i dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in mill 1a to 1f during annual overhaul 2025 26
Mtps i mill plant unit i dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in mill 1a to 1f during annual overhaul 2025 26
Read moreof your Industry type