Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mtps I Mill Plant Unit Ii Complete Dismantling Of Mill Internals Reconditioning Renewal Of Worn Out Parts Bearings Replacement Of Worn Out Worm Wheel With Worm Shaft And Renewal Of Worm Gear Hub Etc In Any One Mills 2 A To 2 D 2 F
|
| Description |
Mtps I Mill Plant Unit Ii Complete Dismantling Of Mill Internals Reconditioning Renewal Of Worn Out Parts Bearings Replacement Of Worn Out Worm Wheel With Worm Shaft And Renewal Of Worm Gear Hub Etc In Any One Mills 2 A To 2 D 2 F
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2025_EB_599694_1 |
|
Reference Number |
CE / MTPS-I / SE / M-I / MP /OT.252/ 2025-26 |
| Tender Fee | 0 |
| EMD | 6900 |
| Tender Value | - |
| Place | Mettur Thermal Power Station-I / Mettur Dam |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=716840 |
| Start Date | September 02, 2025 21:30 |
| End Date |
Expired
16/09/2025
Expired 394 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mtps i mill plant unit ii complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 2a to 2f
Mtps i mill plant unit ii complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 2a to 2f
Read moreMtps i mill plant ii complete overhauling of gearbox mechanical face seal assembly worm shaft assembly replacing the worn out bulged insulation cover plate assembly scrapper assembly and worn out flexi coupling etc in mills 2a to 2f during aoh
Mtps i mill plant ii complete overhauling of gearbox mechanical face seal assembly worm shaft assembly replacing the worn out bulged insulation cover plate assembly scrapper assembly and worn out flexi coupling etc in mills 2a to 2f during aoh
Read moreMtps i mill plant unit ii overhauling of gravimetric feeders and clean out conveyor of mill 2a to 2f during aoh 2026 2027
Mtps i mill plant unit ii overhauling of gravimetric feeders and clean out conveyor of mill 2a to 2f during aoh 2026 2027
Read moreMtps i mill plant unit ii patch welding of eroded portion of hot air ducts joints and coal mill 2a to 2f vertical inlet area above the horizontal area and below the expansion joint providing insulation for pa inlet duct in coal mills 2a to 2f during
Mtps i mill plant unit ii patch welding of eroded portion of hot air ducts joints and coal mill 2a to 2f vertical inlet area above the horizontal area and below the expansion joint providing insulation for pa inlet duct in coal mills 2a to 2f during
Read moreMtps i mill plant unit ii overhauling of tramp iron chute knife edge gate valves strengthening of reject chute mouth area at under bowl and repairing the cracks of tramp iron chute outside the mill base of mills renewal of the worn out mill
Mtps i mill plant unit ii overhauling of tramp iron chute knife edge gate valves strengthening of reject chute mouth area at under bowl and repairing the cracks of tramp iron chute outside the mill base of mills renewal of the worn out mill
Read moreMtps i mill plant unit ii removal of accumulated ash from the horizontal portions of the mill inlet pa hot air duct at 4 5 mtr 18 mtr level for mills 2a to 2f during annual overhaul 2026 27
Mtps i mill plant unit ii removal of accumulated ash from the horizontal portions of the mill inlet pa hot air duct at 4 5 mtr 18 mtr level for mills 2a to 2f during annual overhaul 2026 27
Read moreTtps mechii ahp uniti ii iii ash slurry pump house removing of worn out internals of seal water pump parts machining and fixing of new internals
Ttps mechii ahp uniti ii iii ash slurry pump house removing of worn out internals of seal water pump parts machining and fixing of new internals
Read moreMtps i mill plant unit ii fabrication of various length of 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 2a to 2f and dismantling of seal air fan motor and overhauling reassembling setting the alignment
Mtps i mill plant unit ii fabrication of various length of 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 2a to 2f and dismantling of seal air fan motor and overhauling reassembling setting the alignment
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 rectification of buck stay beam and supports renewal of worn out buck stay pin fabrication of buck stay cover etc
Mtps i bm unit ii boiler pressure parts aoh 2026 rectification of buck stay beam and supports renewal of worn out buck stay pin fabrication of buck stay cover plate etc in ist and ii nd pass area and rectification of critical pipe line of crh etc
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 maintenance of burners and replacement of worn out fasteners at cover plates
Mtps i bm unit ii boiler pressure parts aoh 2026 maintenance of burners and replacement of worn out fasteners at cover plates
Read moreof your Industry type