Tender Details
Particulars | Details |
---|---|
Title |
Mtps I Mill Plant Unit Ii Complete Dismantling Of Mill Internals Reconditioning Renewal Of Worn Out Parts Bearings Replacement Of Worn Out Worm Wheel With Worm Shaft And Renewal Of Worm Gear Hub Mill Bottom In Any Mill 2 A To 2 F Of Unit Ii
|
Description |
Mtps I Mill Plant Unit Ii Complete Dismantling Of Mill Internals Reconditioning Renewal Of Worn Out Parts Bearings Replacement Of Worn Out Worm Wheel With Worm Shaft And Renewal Of Worm Gear Hub Mill Bottom In Any Mill 2 A To 2 F Of Unit Ii
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_498578_1 |
Reference Number |
CE / MTPS-I / SE / M-I / MP /OT.246/ 2024-25 |
Tender Fee | 0 |
EMD | 9500 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=592462 |
Start Date | November 05, 2024 00:00 |
End Date |
10/11/2024 ( Expired 207 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Mtps i mill plant unit i fabrication of various length of dia 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 1a to 1f and dismantling of seal air fan motor and overhauling reassembling setting the alignment
Mtps i mill plant unit i fabrication of various length of dia 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 1a to 1f and dismantling of seal air fan motor and overhauling reassembling setting the alignment
Read moreMtps i mill plant unit i dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in mill 1a to 1f during annual overhaul 2025 26
Mtps i mill plant unit i dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in mill 1a to 1f during annual overhaul 2025 26
Read moreMtps i mill plant unit i dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and then assembling the reconditioned bends in an appropriate manner in the coal flow system
Mtps i mill plant unit i dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and then assembling the reconditioned bends in an appropriate manner in the coal flow system
Read moreMtps i mill plant unit i removal of worn out thinned out wall plates of coal bunkers 1d 1e 1f and erection of new wall plates of 12 mm thick ms plates and supporting beams and other related works
Mtps i mill plant unit i removal of worn out thinned out wall plates of coal bunkers 1d 1e 1f and erection of new wall plates of 12 mm thick ms plates and supporting beams and other related works
Read moreMtps i mill plant unit i removal of accumulated ash from the horizontal portions of the mill inlet hot air duct at 4 5 mtr 18 mtr level welding of eroded and worn out portion of hot air duct joints and providing guard plates for the expansion
Mtps i mill plant unit i removal of accumulated ash from the horizontal portions of the mill inlet hot air duct at 4 5 mtr 18 mtr level welding of eroded and worn out portion of hot air duct joints and providing guard plates for the expansion
Read moreMtps i mill plant unit i dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2025 26
Mtps i mill plant unit i dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2025 26
Read moreMtps i bm unit i boiler pressure parts aoh 2025 rectification of buck stay beam and supports renewal of wornout buck stay pin fabrication of buck stay cover plate etc in ist and ii nd pass area and allied works
Mtps i bm unit i boiler pressure parts aoh 2025 rectification of buck stay beam and supports renewal of wornout buck stay pin fabrication of buck stay cover plate etc in ist and ii nd pass area and allied works
Read moreNctps 1 operation circle ca div cwph renewal of worn out deteriorated man hole cover plates in suction bay of cwps for unit i ii and iii
Nctps 1 operation circle ca div cwph renewal of worn out deteriorated man hole cover plates in suction bay of cwps for unit i ii and iii
Read moreMtps i bm unit i rotating parts aoh 2025 26 overhauling reconditioning of cerm and eerm gear boxes id pa fd fans gate actuators and other related works etc
Mtps i bm unit i rotating parts aoh 2025 26 overhauling reconditioning of cerm and eerm gear boxes id pa fd fans gate actuators and other related works etc
Read moreMtps i oandahs unit iii iv ash handling pump house stage ii dismantling of worn out suction pipe lines bends and grills in ash slurry sump iii and iv fabrication and erection of 300nb m s suction pipes and bends in the suction lines
Mtps i oandahs unit iii iv ash handling pump house stage ii dismantling of worn out suction pipe lines bends and grills in ash slurry sump iii and iv fabrication and erection of 300nb m s suction pipes and bends in the suction lines
Read moreof your Industry type