Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mtps I Mill Plant Unit Ii Filtration And Purification Of The Contaminated Gear Box Oil Of The Coal Mills 2 A To 2 F During Coh 2024 25
|
| Description |
Mtps I Mill Plant Unit Ii Filtration And Purification Of The Contaminated Gear Box Oil Of The Coal Mills 2 A To 2 F During Coh 2024 25
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_500442_1 |
|
Reference Number |
CE / MTPS-I / SE / M-I / MP /OT.251/ 2024-25 |
| Tender Fee | 0 |
| EMD | 4600 |
| Tender Value | - |
| Place | Mettur Thermal Power Station-I / Mettur Dam |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=595006 |
| Start Date | November 12, 2024 21:30 |
| End Date |
Expired
26/11/2024
Expired 646 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mtps i mill plant unit ii replacement of the existing eroded feeder discharge chutes in mill 2c to 2f during coh 2024 25
Mtps i mill plant unit ii replacement of the existing eroded feeder discharge chutes in mill 2c to 2f during coh 2024 25
Read moreMtps i mill plant unit ii cutting removing of existing worn out mill separator curved liners and erection of new ms liners in mill 2a to 2f during coh 2024 25
Mtps i mill plant unit ii cutting removing of existing worn out mill separator curved liners and erection of new ms liners in mill 2a to 2f during coh 2024 25
Read moreMtps i mill plant unit ii strengthening rectification of raw coal bunkers 2a 2b 2c 2f leak arresting work by patch welding and providing stiffeners during coh 2024 25
Mtps i mill plant unit ii strengthening rectification of raw coal bunkers 2a 2b 2c 2f leak arresting work by patch welding and providing stiffeners during coh 2024 25
Read moreMtps i mill plant unit ii dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in mill 2a to 2f during capital overhaul 2024 25
Mtps i mill plant unit ii dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in mill 2a to 2f during capital overhaul 2024 25
Read moreMtps i mill plant unit ii strengthening of reject chute mouth area at under bowl and repairing the cracks of tramp iron chute outside the mill base of mills 2a to 2f during annual overhaul 2023 24
Mtps i mill plant unit ii strengthening of reject chute mouth area at under bowl and repairing the cracks of tramp iron chute outside the mill base of mills 2a to 2f during annual overhaul 2023 24
Read moreMtps i mill plant unit ii removal of accumulated ash from the horizontal portions of the mill inlet hot air ducts at 45mtr level 18mtr level and providing insulation for pa inlet hot air duct to mill for mills 2a to 2f during aoh
Mtps i mill plant unit ii removal of accumulated ash from the horizontal portions of the mill inlet hot air ducts at 45mtr level 18mtr level and providing insulation for pa inlet hot air duct to mill for mills 2a to 2f during aoh
Read moreMtps i mill plant unit ii dismantling patch welding and assembling of mill outlet elbows orifices transition pieces fabrication of spool piece multiple port outlets etc in coal mill 2a to 2f during annual overhaul 2025 26
Mtps i mill plant unit ii dismantling patch welding and assembling of mill outlet elbows orifices transition pieces fabrication of spool piece multiple port outlets etc in coal mill 2a to 2f during annual overhaul 2025 26
Read moreMtps i mill plant unit ii dismantling reconditioning overhauling and assembling of butterfly valves in mills feeder seal airline during 2a to 2f and fabrication of various lengths of 40 nb cooling water pipe flange and assembling in the 2a
Mtps i mill plant unit ii dismantling reconditioning overhauling and assembling of butterfly valves in mills feeder seal airline during 2a to 2f and fabrication of various lengths of 40 nb cooling water pipe flange and assembling in the 2a
Read moreMtps i tm i unit ii dismantling inspection and overhauling of alfa laval centrifuges 2a 2b during coh 2023 24
Mtps i tm i unit ii dismantling inspection and overhauling of alfa laval centrifuges 2a 2b during coh 2023 24
Read moreMtps i mill plant reconditioning of 2 nos of damaged worn out worm shafts and lock nuts for the mills 3e 2f
Mtps i mill plant reconditioning of 2 nos of damaged worn out worm shafts and lock nuts for the mills 3e 2f
Read moreof your Industry type