Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mtps I Mill Plant Unit Ii Replacement Of The Existing Eroded Feeder Discharge Chutes In Mill 2 C To 2 F During Coh 2024 25
|
| Description |
Mtps I Mill Plant Unit Ii Replacement Of The Existing Eroded Feeder Discharge Chutes In Mill 2 C To 2 F During Coh 2024 25
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_490619_1 |
|
Reference Number |
CE / MTPS-I / SE / M-I / MP /OT. 211/ 2024-25 |
| Tender Fee | 0 |
| EMD | 1500 |
| Tender Value | - |
| Place | Mettur Thermal Power Station-I / Mettur Dam |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=582889 |
| Start Date | October 03, 2024 23:30 |
| End Date |
Expired
17/10/2024
Expired 729 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mtps i mill plant unit ii patch welding of eroded portion of hot air ducts joints and coal mill 2a to 2f vertical inlet area above the horizontal area and below the expansion joint providing insulation for pa inlet duct in coal mills 2a to 2f during
Mtps i mill plant unit ii patch welding of eroded portion of hot air ducts joints and coal mill 2a to 2f vertical inlet area above the horizontal area and below the expansion joint providing insulation for pa inlet duct in coal mills 2a to 2f during
Read moreMtps i mill plant unit ii overhauling of classifier assemblies replacement repairing of eroded inner cone inner cone drum section venture vanes venturi collars during aoh 2026 27
Mtps i mill plant unit ii overhauling of classifier assemblies replacement repairing of eroded inner cone inner cone drum section venture vanes venturi collars during aoh 2026 27
Read moreMtps i mill plant unit ii strengthening rectification of raw coal bunkers 2a 2b 2c leak arresting work by patch welding and providing stiffeners during aoh 2026 27
Mtps i mill plant unit ii strengthening rectification of raw coal bunkers 2a 2b 2c leak arresting work by patch welding and providing stiffeners during aoh 2026 27
Read moreMtps i mill plant unit ii dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2026 27
Mtps i mill plant unit ii dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2026 27
Read moreMtps i mill plant unit ii dismantling and assembling of coal pipes with bends and renewal of eroded pipes of length at about 15 mtr length along with bends between mill outlet elbow and fuel inlet elbow during aoh 2026 27
Mtps i mill plant unit ii dismantling and assembling of coal pipes with bends and renewal of eroded pipes of length at about 15 mtr length along with bends between mill outlet elbow and fuel inlet elbow during aoh 2026 27
Read moreMtps i mill plant unit ii complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 2a to 2f
Mtps i mill plant unit ii complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 2a to 2f
Read moreMtps i mill plant unit ii dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and assembling the reconditioned bends in an appropriate manner in the coal flow system during aoh 2026 27
Mtps i mill plant unit ii dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and assembling the reconditioned bends in an appropriate manner in the coal flow system during aoh 2026 27
Read moreMtps i mill plant unit ii fabrication of various length of 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 2a to 2f and dismantling of seal air fan motor and overhauling reassembling setting the alignment
Mtps i mill plant unit ii fabrication of various length of 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 2a to 2f and dismantling of seal air fan motor and overhauling reassembling setting the alignment
Read moreMtps i mill plant unit ii dismantling of existing elliptical feeder discharge chutes in mill 2c 2d reconditioning of released ss elliptical feeder discharge chutes and reassembling the same during aoh 2026 27
Mtps i mill plant unit ii dismantling of existing elliptical feeder discharge chutes in mill 2c 2d reconditioning of released ss elliptical feeder discharge chutes and reassembling the same during aoh 2026 27
Read moreMtps i mill plant unit i replacement of the existing eroded feeder discharge chutes in mill 1a 1d 1e during aoh 2024 25
Mtps i mill plant unit i replacement of the existing eroded feeder discharge chutes in mill 1a 1d 1e during aoh 2024 25
Read moreof your Industry type