Tender Details

Particulars Details
Title
Mtps I Mill Plant Reconditioning Of 2 Nos Of Damaged Worn Out Worm Shafts And Lock Nuts For The Mills 3 E 2 F
Description
Mtps I Mill Plant Reconditioning Of 2 Nos Of Damaged Worn Out Worm Shafts And Lock Nuts For The Mills 3 E 2 F
Organisation TNEB Limited | State Govt. and UT
Tender Id 2025_EB_517663_1
Reference
Number
CE / MTPS-I / SE / M-I / MP /OT.286/ 2024-25
Tender Fee 0
EMD 3500
Tender Value
Place Mettur Thermal Power Station-I / Mettur Dam
Link https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=616059
Start Date January 09, 2025 23:30
End Date

23/01/2025 ( Expired 109 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Mtps i bm servicing of sky climber drive and its auxiliaries reconditioning of sky climber bed and platform materials and overhauling of gear box assemblies etc for the year 2025

Mtps i bm servicing of sky climber drive and its auxiliaries reconditioning of sky climber bed and platform materials and overhauling of gear box assemblies etc for the year 2025

Read more
Maintenance of cranes for blast furnace, steel melting shop and thin slab caster and hot strip mill for a period of 2 years for 3 mtpa integrated steel plant at nagarnar near jagdalpur, chhattisgarh state

Maintenance of cranes for blast&#x0d furnace, steel melting shop and thin slab caster and hot&#x0d strip mill for a period of 2 years for 3 mtpa integrated steel&#x0d plant at nagarnar near jagdalpur, chhattisgarh state

Read more
Mtps i bm unit i boiler pressure parts aoh 2025 maintenance of burners and replacement of worn out fasteners at cover plates

Mtps i bm unit i boiler pressure parts aoh 2025 maintenance of burners and replacement of worn out fasteners at cover plates

Read more
Repairing and line boring of 04 nos. worn-out bucket eyes and repair welding/shaping of rhs bucket eye housing on the front part of bucket to make the bucket assembly serviceable/ready in float for be1800e shovel at dep.

Repairing and line boring of 04 nos. worn-out bucket eyes and repair welding/shaping of rhs bucket eye housing on the front part of bucket to make the bucket assembly serviceable/ready in float for be1800e shovel at dep.

Read more
Contract for providing 4 nos of manpower have i st class or ii nd calss ibr boiler operator for operation and maintenance of 2 nos 4 ton iaec make boilers and 1 no 2.8 ton forbes marshall make boiler and steamlines and valves for 2 yrs at ambattur dy

Contract for providing 4 nos of manpower have i st class or ii nd calss ibr boiler operator for operation and maintenance of 2 nos 4 ton iaec make boilers and 1 no 2.8 ton forbes marshall make boiler and steamlines and valves for 2 yrs at ambattur dy

Read more
Mtps i mi ca cws i cooling tower i overhauling of flow control valves and including reconditioning of worn out spares during aoh 2025 2026 of unit i

Mtps i mi ca cws i cooling tower i overhauling of flow control valves and including reconditioning of worn out spares during aoh 2025 2026 of unit i

Read more
Mtps i bm dm plant unit i to iv aoh coh 2025 overhauling of hot well makeup pumps 8 nos and boiler fill pumps 4 nos

Mtps i bm dm plant unit i to iv aoh coh 2025 overhauling of hot well makeup pumps 8 nos and boiler fill pumps 4 nos

Read more
Mtps i m i ca cws i replacement of corroded worn out gi safety hand rails toe guards and safety grills inside ct id fan stack area and allied works

Mtps i m i ca cws i replacement of corroded worn out gi safety hand rails toe guards and safety grills inside ct id fan stack area and allied works

Read more
Providing, installing and commissioning of modular type sewage treatment plant for treatment of waste water generated from village faidan, chandigarh (phase-i for site no.2)

Providing, installing and commissioning of modular type sewage treatment plant for treatment of waste water generated from village faidan, chandigarh (phase-i for site no.2)

Read more
Patch welding to be done for rectification of damaged flue gas duct from aph-b hopper to chimeny along the path cd side flue gas duct and its honeycomb structure ( cd) after dismantling the damaged / worn out portion of flue gas ducts for overhaul of unit ix

Patch welding to be done for rectification of damaged flue gas duct from aph b hopper to chimeny along the path cd side flue gas duct and its honeycomb structure c and d after dismantling the damaged worn out portion of flue gas ducts for overhaul of unit ix

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise