Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mtps I Mill Plant Unit Ii Complete Inspection Of Mill Internals Reconditioning Renewal Of Worn Out Parts Bearings Replacement Of Broken Main Vertical Shaft Worm Wheel With Worm Shaft Mill Bottom Mill Bottom Cover Plate Mill 2 F
|
| Description |
Mtps I Mill Plant Unit Ii Complete Inspection Of Mill Internals Reconditioning Renewal Of Worn Out Parts Bearings Replacement Of Broken Main Vertical Shaft Worm Wheel With Worm Shaft Mill Bottom Mill Bottom Cover Plate Mill 2 F
|
| Organisation | Government of Tamil Nadu |
| Tender Id | 2023_EB_369109_1 |
|
Reference Number |
CE / MTPS-I / SE / M-I / MP/OT. 308/ 2023-24 |
| Tender Fee | 0 |
| EMD | 6000 |
| Tender Value | - |
| Place | Office of the Superintending Engineer /M-I/MTPS-I |
| Link |
View Original Tender Notice
https://tntenders.gov.in |
| Start Date | September 12, 2023 18:30 |
| End Date |
Expired
18/09/2023
Expired 1122 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mtps i mill plant unit ii complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 2a to 2f
Mtps i mill plant unit ii complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 2a to 2f
Read moreMtps i mill plant ii complete overhauling of gearbox mechanical face seal assembly worm shaft assembly replacing the worn out bulged insulation cover plate assembly scrapper assembly and worn out flexi coupling etc in mills 2a to 2f during aoh
Mtps i mill plant ii complete overhauling of gearbox mechanical face seal assembly worm shaft assembly replacing the worn out bulged insulation cover plate assembly scrapper assembly and worn out flexi coupling etc in mills 2a to 2f during aoh
Read moreMtps i mill plant unit ii overhauling of gravimetric feeders and clean out conveyor of mill 2a to 2f during aoh 2026 2027
Mtps i mill plant unit ii overhauling of gravimetric feeders and clean out conveyor of mill 2a to 2f during aoh 2026 2027
Read moreMtps i mill plant unit ii patch welding of eroded portion of hot air ducts joints and coal mill 2a to 2f vertical inlet area above the horizontal area and below the expansion joint providing insulation for pa inlet duct in coal mills 2a to 2f during
Mtps i mill plant unit ii patch welding of eroded portion of hot air ducts joints and coal mill 2a to 2f vertical inlet area above the horizontal area and below the expansion joint providing insulation for pa inlet duct in coal mills 2a to 2f during
Read moreMtps i mill plant unit ii removal of accumulated ash from the horizontal portions of the mill inlet pa hot air duct at 4 5 mtr 18 mtr level for mills 2a to 2f during annual overhaul 2026 27
Mtps i mill plant unit ii removal of accumulated ash from the horizontal portions of the mill inlet pa hot air duct at 4 5 mtr 18 mtr level for mills 2a to 2f during annual overhaul 2026 27
Read moreMtps i mill plant unit ii fabrication of various length of 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 2a to 2f and dismantling of seal air fan motor and overhauling reassembling setting the alignment
Mtps i mill plant unit ii fabrication of various length of 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 2a to 2f and dismantling of seal air fan motor and overhauling reassembling setting the alignment
Read moreMtps i mill plant unit ii overhauling of tramp iron chute knife edge gate valves strengthening of reject chute mouth area at under bowl and repairing the cracks of tramp iron chute outside the mill base of mills renewal of the worn out mill
Mtps i mill plant unit ii overhauling of tramp iron chute knife edge gate valves strengthening of reject chute mouth area at under bowl and repairing the cracks of tramp iron chute outside the mill base of mills renewal of the worn out mill
Read moreMtps i tm unit ii overhauling of beacon rotork ind modact actuator with renewal of oil seals o rings wheel retainer ring replacing the defective worm wheel limit switch drive shaft checking the mechanism and oil filling during unit ii aoh 2026 27
Mtps i tm unit ii overhauling of beacon rotork ind modact actuator with renewal of oil seals o rings wheel retainer ring replacing the defective worm wheel limit switch drive shaft checking the mechanism and oil filling during unit ii aoh 2026 27
Read moreMtps i mill plant unit ii complete dismantling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub mill bottom in any mill 2a to 2f of unit ii
Mtps i mill plant unit ii complete dismantling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub mill bottom in any mill 2a to 2f of unit ii
Read moreMtps i mill plant iv complete inspection of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub mill bottom mill bottom cover plate etc
Mtps i mill plant iv complete inspection of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub mill bottom mill bottom cover plate etc
Read moreof your Industry type