Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Nhidcl/Megh./Nh 40 (S D)/B W/P V/2022/
|
| Description |
Improvement Widening To 2 Lane With Paved Shoulder/4 Lanning Of Nh 40 Between Shillong To Dawki Road Upto Bangladesh Border Including Dawki Bridge From In The State Of Meghalaya (Package V)
|
| Organisation | Central Public Procurement Portal 1 |
| Tender Id | 2023_NHIDC_761208_1 |
|
Reference Number |
NHIDCL/Megh./NH-40 (S-D)/B-W/P-V/2022/ |
| Tender Fee | 35400 |
| EMD | 2.71 Crore |
| Tender Value | |
| Place | NHIDCL HQ New Delhi |
| Link |
View Original Tender Notice
https://eprocure.gov.in |
| Start Date | July 27, 2023 16:30 |
| End Date |
Expired
16/08/2023
Expired 1024 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
One time improvement work of shahdol city portion to 2 lane with paved shoulders between existing km 132/500 (design km 0/00) to km 141/300 (design km 8.80) (length 8.80 km) on katni shahdol road section of nh-43 in the state of madhya pradesh.
One time improvement work of shahdol city portion to 2 lane with paved shoulders between existing km 132/500 (design km 0/00) to km 141/300 (design km 8.80) (length 8.80 km) on katni shahdol road section of nh-43 in the state of madhya pradesh.
Read moreIndependent engineer services for 2 l. paved shoulders/ 4 laning of damoh jabalpur package-1 and 3 section of nh-34 from km 0.000 to km 43.500 and km 66.800 to km 101.563 under nh (o) in madhya pradesh on ham
Independent engineer services for 2 l. paved shoulders/ 4 laning of damoh jabalpur package-1 and 3 section of nh-34 from km 0.000 to km 43.500 and km 66.800 to km 101.563 under nh (o) in madhya pradesh on ham
Read moreConstruction / improvement of existing cl-9 road to nhdl (ps) specifications with paved shoulder from muguthang of design chainage km 0.000 to naku of design chainage km 11.755 (total design length 11.755 km) nh-310 ag in the state of sikkim
Construction / improvement of existing cl-9 road to nhdl (ps) specifications with paved shoulder from muguthang of design chainage km 0.000 to naku of design chainage km 11.755 (total design length 11.755 km) nh-310 ag in the state of sikkim
Read moreNhidcl/megh. /nh-40(s-d)/b-w/p-v/2022/
Improvement/widening to 2-lane with paved shoulder/4-lanning of nh-40 between shillong to dawki road upto bangladesh border including dawki bridge from (design km 63.530 to km 71.520) design length of 7.99 km in the state of meghalaya for execution o
Read moreNhidcl/megh./ nh-40(s-d) /b-w/p-ii/2023/
improvement widening to 2-lane with paved shoulder/4-lanning of nh-40 between shillong to dawki road up to bangladesh border including dawki bridge from design length of 26.550 km in the state of meghalaya for execution of epc
Read moreNhidcl/megh./nh-40 (s-d)/b-w/p-iv/2023
Improvement/ widening to 2-lane with paved shoulder/4-laning of nh-40 between shillong to dawki road upto bangladesh border from km 131.820 to km 151.330 (design km 45.760 to km 63.530) in the state of meghalaya
Read moreImprovement and widening to two laning with paved shoulder of nh 127b from km 31.500 to km 63.224 (goeragre) in the state of meghalaya on epc basis through jica oda loan phase-vii(package-2)
Improvement and widening to two laning with paved shoulder of nh 127b from km 31.500 to km 63.224 (goeragre) in the state of meghalaya on epc basis through jica oda loan phase-vii(package-2)
Read moreWidening and strengthening of existing 2 lane with paved shoulder to 4 lane with paved shoulder from km 67/400 to km 70/400 of nh-353 (khariar road town portion) in the state of odisha on epc mode.
Widening and strengthening of existing 2 lane with paved shoulder to 4 lane with paved shoulder from km 67/400 to km 70/400 of nh-353 (khariar road town portion) in the state of odisha on epc mode.
Read moreNhidcl/ro-shg/s-d/mil assets/nh-40/2024/1
Construction of buildings/ military assets in defence campus at shillong in lieu of dismantled military assets due to up-gradation/ widening of nh-40 section between shillong-dawki road project under nhidcl in the state of meghalaya for execution of
Read moreImprovement and widening to two laning with paved shoulder of nh 127b from km 31.500 to km 63.224 (goeragre) in the state of meghalaya on epc basis through jica oda loan phase-vii (package-2)
Improvement and widening to two laning with paved shoulder of nh 127b from km 31.500 to km 63.224 (goeragre) in the state of meghalaya on epc basis through jica oda loan phase-vii (package-2)
Read moreof your Industry type