About Tender
🏗️ Invitation For Tender: Nhidcl Project For Nh 13 Demwe Brahmakund Section 🛣️ The National Highways And Infrastructure Development Corporation Limited (Nhidcl), Under The Aegis Of The Central Government Ministry/Department, Invites Tenders For The Balance Work In The Construction Of A 2 Lane Road With Hard Shoulders On The Demwe Brahmakund Section Of Nh 13, Spanning From Chainage 0.000 Km To 18.464 Km In The State Of Arunachal Pradesh. 🗺️ 📅 Tender Submission Deadline: April 01, 2024, 3:00 Pm Tender Fee: Inr 35,400 Earnest Money Deposit (Emd): Inr 20,92,200 Eligible Contractors Are Advised To Submit Detailed Tenders, Including Technical And Financial Bids, In Accordance With The Epc (Engineering, Procurement, And Construction) Mode And As Per The Specifications Outlined In The Tender Document. Keywords: Nhidcl, Nh 13, Construction, Epc Mode, Arunachal Pradesh, Tender, Earnest Money Deposit, Infrastructure Development, Highway ConstructionParticulars | Details |
---|---|
Title |
Nhidcl/Ar.Pr./Nh 13/Bal. Work/D B/2024/
|
Description |
Balance Work For Construction Of 2 Lane With Hard Shoulders Of Demwe Brahmakund Section Of Nh 13 From Ch. 0.000 Km To 18.464 Km In The State Of Arunachal Pradesh On Epc Mode Under Nh(o) Ne
|
Organisation | National Highways and Infrastructure Development Corporation | Central Govt. Ministry/Department |
Tender Id | 2024_NHIDC_800991_1 |
Reference Number |
NHIDCL/Ar.Pr./NH-13/Bal. Work/D-B/2024 |
Tender Fee | 23600 |
EMD | 2.09 Crore |
Tender Value | |
Place | Namsai |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=865419 |
Start Date | September 28, 2024 14:30 |
End Date |
28/10/2024 ( Expired 249 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreDevelopment of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreConst. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read moreCs for supervision of dubrajpur bypass with 4-lane configuration of length 5.676 km on nh 60 (new nh-14) from design chainage 0.00 (existing km 316.135 on nh60) to design chainage 5.676 (existing km 320.980 on nh 60) in birbhum west bengal in epc mod
Cs for supervision of dubrajpur bypass with 4-lane configuration of length 5.676 km on nh 60 (new nh-14) from design chainage 0.00 (existing km 316.135 on nh60) to design chainage 5.676 (existing km 320.980 on nh 60) in birbhum west bengal in epc mod
Read moreConsultancy services for authority engineer for supervision of rehabilitation and up-gradation from single lane to two lanes with paved shoulder from existing km 195.175 to km 220.00 design chainage from km 71.300 to km 95.947 paligad to jankichatti
Rehabilitation and up-gradation from single lane to two lanes with paved shoulder from existing km 195.175 to km 220.00 (design chainage from km 71.300 to km 95.947 paligad to jankichatti) on nh 134 in the state of uttarakhand under epc mode.
Read moreConstruction of 4 lane access controlled highway from vakalpudi light house to annavaram (on nh16) section of nh516f from km. 0.000 to km. 40.621 on ham under bharatmala pariyojana phase i in the state of andhra pradesh
Construction of 4 lane access controlled highway from vakalpudi light house to annavaram (on nh16) section of nh516f from km. 0.000 to km. 40.621 on ham under bharatmala pariyojana phase i in the state of andhra pradesh
Read moreConsultancy services for authority engineer for supervision of widening to 2-lane from existing chainage km. 74.700 to km. 100.660 design chainage km 53.365 to km 78.785 on nh-507 in the state of uttarakhand.
Widening to 2-lane from existing chainage km. 74.700 to km. 100.660 design chainage km 53.365 to km 78.785 on nh-507 in the state of uttarakhand.
Read moreBalance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.
Balance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.
Read moreof your Industry type