Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Nhidcl/Megh. /Nh 40(s D)/B W/P V/2022/
|
| Description |
Improvement/Widening To 2 Lane With Paved Shoulder/4 Lanning Of Nh 40 Between Shillong To Dawki Road Upto Bangladesh Border Including Dawki Bridge From (Design Km 63.530 To Km 71.520) Design Length Of 7.99 Km In The State Of Meghalaya For Execution O
|
| Organisation | National Highways and Infrastructure Development Corporation | Central Govt. Ministry/Department |
| Tender Id | 2024_NHIDC_788345_1 |
|
Reference Number |
NHIDCL/Megh. /NH-40(S-D)/B-W/P-V/2022/ |
| Tender Fee | 35400 |
| EMD | 2.71 Crore |
| Tender Value | |
| Place | Shillong |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=828636 |
| Start Date | January 24, 2024 14:30 |
| End Date |
Expired
08/02/2024
Expired 848 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction / improvement of existing cl-9 road to nhdl (ps) specifications with paved shoulder from muguthang of design chainage km 0.000 to naku of design chainage km 11.755 (total design length 11.755 km) nh-310 ag in the state of sikkim
Construction / improvement of existing cl-9 road to nhdl (ps) specifications with paved shoulder from muguthang of design chainage km 0.000 to naku of design chainage km 11.755 (total design length 11.755 km) nh-310 ag in the state of sikkim
Read moreOne time improvement work of shahdol city portion to 2 lane with paved shoulders between existing km 132/500 (design km 0/00) to km 141/300 (design km 8.80) (length 8.80 km) on katni shahdol road section of nh-43 in the state of madhya pradesh.
One time improvement work of shahdol city portion to 2 lane with paved shoulders between existing km 132/500 (design km 0/00) to km 141/300 (design km 8.80) (length 8.80 km) on katni shahdol road section of nh-43 in the state of madhya pradesh.
Read moreNhidcl/megh./nh-40 (s-d)/b-w/p-v/2022/
improvement widening to 2-lane with paved shoulder/4-lanning of nh-40 between shillong to dawki road upto bangladesh border including dawki bridge from in the state of meghalaya (package-v)
Read moreNhidcl/megh./ nh-40(s-d) /b-w/p-ii/2023/
improvement widening to 2-lane with paved shoulder/4-lanning of nh-40 between shillong to dawki road up to bangladesh border including dawki bridge from design length of 26.550 km in the state of meghalaya for execution of epc
Read moreNhidcl/megh./nh-40 (s-d)/b-w/p-iv/2023
Improvement/ widening to 2-lane with paved shoulder/4-laning of nh-40 between shillong to dawki road upto bangladesh border from km 131.820 to km 151.330 (design km 45.760 to km 63.530) in the state of meghalaya
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreWidening reconstruction and upgradation to 2 lane with paved shoulder four lane configuration for the work of sautada to shirapur section of nh 561 from design km 86.300 to 125.589 in the state of maharashtra on epc mode. design length 39.289 km
Widening reconstruction and upgradation to 2 lane with paved shoulder four lane configuration for the work of sautada to shirapur section of nh 561 from design km 86.300 to 125.589 in the state of maharashtra on epc mode. design length 39.289 km
Read moreWidening of the existing 2lane paved shoulder sec of nh716 from tiruvallur to tamilnadu/andhrapradesh border (existing chainage km.0.000/design chain km 61.510) to 4lane with paved shoulder config with overall design length of 43.950 km in tn
Widening of the existing 2lane paved shoulder sec of nh716 from tiruvallur to tamilnadu/andhrapradesh border (existing chainage km.0.000/design chain km 61.510) to 4lane with paved shoulder config with overall design length of 43.950 km in tn
Read moreWidening of existing 2 lane paved shoulder to 4 lane paved shoulder in km 268/40 to km 271/30 an km 273/00 to km 273/80 and widening end to end and improvements from km 271/3 to 273/0 of nh-948 (coimbatore - sathyamangalam road) (length 5.40 km) incl
Widening of existing 2 lane paved shoulder to 4 lane paved shoulder in km 268/40 to km 271/30 an km 273/00 to km 273/80 and widening end to end and improvements from km 271/3 to 273/0 of nh-948 (coimbatore - sathyamangalam road) (length 5.40 km) incl
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Read moreof your Industry type