Tender Details

Particulars Details
Title
Nhidcl/Megh. /Nh 40(s D)/B W/P V/2022/
Description
Improvement/Widening To 2 Lane With Paved Shoulder/4 Lanning Of Nh 40 Between Shillong To Dawki Road Upto Bangladesh Border Including Dawki Bridge From (Design Km 63.530 To Km 71.520) Design Length Of 7.99 Km In The State Of Meghalaya For Execution O
Organisation National Highways and Infrastructure Development Corporation | Central Govt. Ministry/Department
Tender Id 2024_NHIDC_788345_1
Reference
Number
NHIDCL/Megh. /NH-40(S-D)/B-W/P-V/2022/
Tender Fee 35400
EMD 2.71 Crore
Tender Value
Place Shillong
Link
View Original Tender Notice

https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=828636

Start Date January 24, 2024 14:30
End Date
Expired 08/02/2024

Expired 848 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction / improvement of existing cl-9 road to nhdl (ps) specifications with paved shoulder from muguthang of design chainage km 0.000 to naku of design chainage km 11.755 (total design length 11.755 km) nh-310 ag in the state of sikkim

Construction / improvement of existing cl-9 road to nhdl (ps) specifications with paved shoulder from muguthang of design chainage km 0.000 to naku of design chainage km 11.755 (total design length 11.755 km) nh-310 ag in the state of sikkim

Read more
One time improvement work of shahdol city portion to 2 lane with paved shoulders between existing km 132/500 (design km 0/00) to km 141/300 (design km 8.80) (length 8.80 km) on katni shahdol road section of nh-43 in the state of madhya pradesh.

One time improvement work of shahdol city portion to 2 lane with paved shoulders between existing km 132/500 (design km 0/00) to km 141/300 (design km 8.80) (length 8.80 km) on katni shahdol road section of nh-43 in the state of madhya pradesh.

Read more
Nhidcl/megh./nh-40 (s-d)/b-w/p-v/2022/

improvement widening to 2-lane with paved shoulder/4-lanning of nh-40 between shillong to dawki road upto bangladesh border including dawki bridge from in the state of meghalaya (package-v)

Read more
Nhidcl/megh./ nh-40(s-d) /b-w/p-ii/2023/

improvement widening to 2-lane with paved shoulder/4-lanning of nh-40 between shillong to dawki road up to bangladesh border including dawki bridge from design length of 26.550 km in the state of meghalaya for execution of epc

Read more
Nhidcl/megh./nh-40 (s-d)/b-w/p-iv/2023

Improvement/ widening to 2-lane with paved shoulder/4-laning of nh-40 between shillong to dawki road upto bangladesh border from km 131.820 to km 151.330 (design km 45.760 to km 63.530) in the state of meghalaya

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Read more
Widening reconstruction and upgradation to 2 lane with paved shoulder four lane configuration for the work of sautada to shirapur section of nh 561 from design km 86.300 to 125.589 in the state of maharashtra on epc mode. design length 39.289 km

Widening reconstruction and upgradation to 2 lane with paved shoulder four lane configuration for the work of sautada to shirapur section of nh 561 from design km 86.300 to 125.589 in the state of maharashtra on epc mode. design length 39.289 km

Read more
Widening of the existing 2lane paved shoulder sec of nh716 from tiruvallur to tamilnadu/andhrapradesh border (existing chainage km.0.000/design chain km 61.510) to 4lane with paved shoulder config with overall design length of 43.950 km in tn

Widening of the existing 2lane paved shoulder sec of nh716 from tiruvallur to tamilnadu/andhrapradesh border (existing chainage km.0.000/design chain km 61.510) to 4lane with paved shoulder config with overall design length of 43.950 km in tn

Read more
Widening of existing 2 lane paved shoulder to 4 lane paved shoulder in km 268/40 to km 271/30 an km 273/00 to km 273/80 and widening end to end and improvements from km 271/3 to 273/0 of nh-948 (coimbatore - sathyamangalam road) (length 5.40 km) incl

Widening of existing 2 lane paved shoulder to 4 lane paved shoulder in km 268/40 to km 271/30 an km 273/00 to km 273/80 and widening end to end and improvements from km 271/3 to 273/0 of nh-948 (coimbatore - sathyamangalam road) (length 5.40 km) incl

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise