Tender Details

Particulars Details
Title
Design, Supply, Installation, Testing And Commissioning Of Ballastless Track For Elevated Viaduct Of Reach 1 B And Reach 3 A Of Nmrp Ph 2 Incl Supply Of 1080 Grade Hh Rails, Track Fastenings, 1 In 9 R300 Ballastless Turnouts And Other Misc Works.
Description
Design, Supply, Installation, Testing And Commissioning Of Ballastless Track For Elevated Viaduct Of Reach 1 B And Reach 3 A Of Nmrp Ph 2 Incl Supply Of 1080 Grade Hh Rails, Track Fastenings, 1 In 9 R300 Ballastless Turnouts And Other Misc Works.
Organisation Maharashtra Metro Rail Corporation Limited | State Govt. and UT
Tender Id 2026_MMRCL_1295562_1
Reference
Number
N2-074/T-03/2026
Tender Fee 89000
EMD 1.28 Crore
Tender Value -
Place Nagpur
Link
View Original Tender Notice

https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2225924

Start Date May 26, 2026 23:30
End Date
Expired 02/06/2026

Expired 134 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Design, supply, installation, testing and commissioning of ballasted/ ballast-less track in at grade section of reach 1a, reach 2a & reach 4a of nmrp phase-2 including supply of 1080grade hh rails, track fastenings, 1 in 9 r300 ballasted/ballastless turnouts & derailing switches and other miscellaneous works

Design, supply, installation, testing and commissioning of ballasted/ ballast-less track in at grade section of reach 1a, reach 2a & reach 4a of nmrp phase-2 including supply of 1080grade hh rails, track fastenings, 1 in 9 r300 ballasted/ballastless turnouts & derailing switches and other miscellaneous works

Read more
Viaduct work in reach 1a of nmrp phase

Design and construction of elevated metro viaduct of length around 17 km between ch 21256 to ch 38881 including railway spans of length 79m and 100m and a 6 lane double decker portion with vehicular underpass in reach 1a of nmrp phase 2

Read more
Design, supply, installation, testing and commissioning of ballasted track in &ldquoat grade section&rdquo of reach 1a of nmrp phase-2 including supply of 1080 grade hh rails, track fastenings, 1 in 9 r300 ballasted turnout and other miscellaneous works

Design, supply, installation, testing and commissioning of ballasted track in &ldquoat grade section&rdquo of reach 1a of nmrp phase-2 including supply of 1080 grade hh rails, track fastenings, 1 in 9 r300 ballasted turnout and other miscellaneous works

Read more
Design and construction of elevated metro viaduct for nmrp phase-2 in

Design and construction of elevated metro viaduct for nmrp phase-2 in: i.between ch (-) 7577.056 m to ch (-) 13457.046 m of length 5.9 km in reach 2b ii.between ch: 18218.586 m to ch: 24633.194 m of length 6.414 km in reach-3a iii.between ch: (-) 289.668 m to ch: (-) 5622.577 m of length 5.333 km in reach-4a

Read more
Design and construction of elevated metro viaduct of length 5.9 km between ch. (-) 7577.056 m to ch. (-) 13457.046 m in reach 2b of nmrp phase 2.

Design and construction of elevated metro viaduct of length 5.9 km between ch. (-) 7577.056 m to ch. (-) 13457.046 m in reach 2b of nmrp phase 2.

Read more
Design and construction of elevated metro viaduct for nmrp phase-2 in i. between ch (-) 7577.056 m to ch (-) 13457.046 m of length 5.9 km in reach 2b ii. between ch 18218.586 m to ch 24633.194 m of length 6.414 km in reach 3a iii. between ch (-) 289.

Design and construction of elevated metro viaduct for nmrp phase-2 in i. between ch (-) 7577.056 m to ch (-) 13457.046 m of length 5.9 km in reach 2b ii. between ch 18218.586 m to ch 24633.194 m of length 6.414 km in reach 3a iii. between ch (-) 289.

Read more
Core cutting and fixing of anchor bolts in ballastless track and fixing of plate screw at turnouts of ballasted track by grouting in line-3,4,6,8,9 and apl of dmrc network.

Core cutting and fixing of anchor bolts in ballastless track and fixing of plate screw at turnouts of ballasted track by grouting in line-3,4,6,8,9 and apl of dmrc network.

Read more
Design and construction of elevated metro viaduct for nmrp phase-2 in: i.between ch (-) 7577.056 m to ch (-) 13457.046 m of length 5.9 km in reach 2b ii.between ch: 18218.586 m to ch: 24633.194 m of length 6.414 km in reach-3a iii.between ch: (-) 289.668 m to ch: (-) 5622.577 m of length 5.333 km in reach-4a

Design and construction of elevated metro viaduct for nmrp phase-2 in: i.between ch (-) 7577.056 m to ch (-) 13457.046 m of length 5.9 km in reach 2b ii.between ch: 18218.586 m to ch: 24633.194 m of length 6.414 km in reach-3a iii.between ch: (-) 289.668 m to ch: (-) 5622.577 m of length 5.333 km in reach-4a

Read more
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts in corridor 2 from benniganahalli to chikkabanavara including ballasted and special tracks in soladevanahalli depot

Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts in corridor 2 from benniganahalli to chikkabanavara including ballasted and special tracks in soladevanahalli depot

Read more
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp

Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise