Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Design, Supply, Installation, Testing And Commissioning Of Ballastless Track For Elevated Viaduct Of Reach 1 B And Reach 3 A Of Nmrp Ph 2 Incl Supply Of 1080 Grade Hh Rails, Track Fastenings, 1 In 9 R300 Ballastless Turnouts And Other Misc Works.
|
| Description |
Design, Supply, Installation, Testing And Commissioning Of Ballastless Track For Elevated Viaduct Of Reach 1 B And Reach 3 A Of Nmrp Ph 2 Incl Supply Of 1080 Grade Hh Rails, Track Fastenings, 1 In 9 R300 Ballastless Turnouts And Other Misc Works.
|
| Organisation | Maharashtra Metro Rail Corporation Limited | State Govt. and UT |
| Tender Id | 2026_MMRCL_1295562_1 |
|
Reference Number |
N2-074/T-03/2026 |
| Tender Fee | 89000 |
| EMD | 1.28 Crore |
| Tender Value | - |
| Place | Nagpur |
| Link |
View Original Tender Notice
https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2225924 |
| Start Date | May 26, 2026 23:30 |
| End Date |
Expired
02/06/2026
Expired 134 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Design, supply, installation, testing and commissioning of ballasted/ ballast-less track in at grade section of reach 1a, reach 2a & reach 4a of nmrp phase-2 including supply of 1080grade hh rails, track fastenings, 1 in 9 r300 ballasted/ballastless turnouts & derailing switches and other miscellaneous works
Design, supply, installation, testing and commissioning of ballasted/ ballast-less track in at grade section of reach 1a, reach 2a & reach 4a of nmrp phase-2 including supply of 1080grade hh rails, track fastenings, 1 in 9 r300 ballasted/ballastless turnouts & derailing switches and other miscellaneous works
Read moreViaduct work in reach 1a of nmrp phase
Design and construction of elevated metro viaduct of length around 17 km between ch 21256 to ch 38881 including railway spans of length 79m and 100m and a 6 lane double decker portion with vehicular underpass in reach 1a of nmrp phase 2
Read moreDesign, supply, installation, testing and commissioning of ballasted track in &ldquoat grade section&rdquo of reach 1a of nmrp phase-2 including supply of 1080 grade hh rails, track fastenings, 1 in 9 r300 ballasted turnout and other miscellaneous works
Design, supply, installation, testing and commissioning of ballasted track in &ldquoat grade section&rdquo of reach 1a of nmrp phase-2 including supply of 1080 grade hh rails, track fastenings, 1 in 9 r300 ballasted turnout and other miscellaneous works
Read moreDesign and construction of elevated metro viaduct for nmrp phase-2 in
Design and construction of elevated metro viaduct for nmrp phase-2 in: i.between ch (-) 7577.056 m to ch (-) 13457.046 m of length 5.9 km in reach 2b ii.between ch: 18218.586 m to ch: 24633.194 m of length 6.414 km in reach-3a iii.between ch: (-) 289.668 m to ch: (-) 5622.577 m of length 5.333 km in reach-4a
Read moreDesign and construction of elevated metro viaduct of length 5.9 km between ch. (-) 7577.056 m to ch. (-) 13457.046 m in reach 2b of nmrp phase 2.
Design and construction of elevated metro viaduct of length 5.9 km between ch. (-) 7577.056 m to ch. (-) 13457.046 m in reach 2b of nmrp phase 2.
Read moreDesign and construction of elevated metro viaduct for nmrp phase-2 in i. between ch (-) 7577.056 m to ch (-) 13457.046 m of length 5.9 km in reach 2b ii. between ch 18218.586 m to ch 24633.194 m of length 6.414 km in reach 3a iii. between ch (-) 289.
Design and construction of elevated metro viaduct for nmrp phase-2 in i. between ch (-) 7577.056 m to ch (-) 13457.046 m of length 5.9 km in reach 2b ii. between ch 18218.586 m to ch 24633.194 m of length 6.414 km in reach 3a iii. between ch (-) 289.
Read moreCore cutting and fixing of anchor bolts in ballastless track and fixing of plate screw at turnouts of ballasted track by grouting in line-3,4,6,8,9 and apl of dmrc network.
Core cutting and fixing of anchor bolts in ballastless track and fixing of plate screw at turnouts of ballasted track by grouting in line-3,4,6,8,9 and apl of dmrc network.
Read moreDesign and construction of elevated metro viaduct for nmrp phase-2 in: i.between ch (-) 7577.056 m to ch (-) 13457.046 m of length 5.9 km in reach 2b ii.between ch: 18218.586 m to ch: 24633.194 m of length 6.414 km in reach-3a iii.between ch: (-) 289.668 m to ch: (-) 5622.577 m of length 5.333 km in reach-4a
Design and construction of elevated metro viaduct for nmrp phase-2 in: i.between ch (-) 7577.056 m to ch (-) 13457.046 m of length 5.9 km in reach 2b ii.between ch: 18218.586 m to ch: 24633.194 m of length 6.414 km in reach-3a iii.between ch: (-) 289.668 m to ch: (-) 5622.577 m of length 5.333 km in reach-4a
Read moreDesign, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts in corridor 2 from benniganahalli to chikkabanavara including ballasted and special tracks in soladevanahalli depot
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts in corridor 2 from benniganahalli to chikkabanavara including ballasted and special tracks in soladevanahalli depot
Read moreDesign, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreof your Industry type