π Invitation For Bids: Elevated Metro Viaduct Construction ποΈπ The Maharashtra Metro Rail Corporation Limited (Maha Metro) Is Seeking Bids From Experienced Contractors For The Design And Construction Of Elevated Metro Viaducts As Part Of The Nmrp Phase 2 Project In Nagpur. π Locations: Reach 2 B: Approximately 5.9 Km Between Chainage (Ch) 7577.056 M To Ch 13457.046 M Reach 3 A: Approximately 6.414 Km Between Ch 18218.586 M To Ch 24633.194 M Reach 4 A: Approximately 5.333 Km Between Ch ( ) 289.668 M To Ch ( ) 5622.577 M π Bid Submission Deadline: April 09, 2024, 16:00 Pm πΈ Tender Fee: Inr 1,18,000 Emd: Inr 5,05,00,000 Interested Bidders Must Possess The Requisite Expertise And Experience In Large Scale Infrastructure Projects. Detailed Proposals, Including Design Specifications, Construction Methodology, And Financial Bids, Are To Be Submitted In Accordance With The Tender Documents. Keywords: Maharashtra Metro Rail Corporation Limited, Metro Viaduct Construction, Nmrp Phase 2, Nagpur, Infrastructure Project, Government Tender, Bid Submission, Tender F| Particulars | Details |
|---|---|
| Title |
Design And Construction Of Elevated Metro Viaduct For Nmrp Phase 2 In
|
| Description |
Design And Construction Of Elevated Metro Viaduct For Nmrp Phase 2 In:
I.Between Ch ( ) 7577.056 M To Ch ( ) 13457.046 M Of Length 5.9 Km In Reach 2 B
Ii.Between Ch: 18218.586 M To Ch: 24633.194 M Of Length 6.414 Km In Reach 3 A
Iii.Between Ch: ( ) 289.668 M To Ch: ( ) 5622.577 M Of Length 5.333 Km In Reach 4 A
|
| Organisation | Maharashtra Metro Rail Corporation Limited | Public Sector Undertakings |
| Tender Id | 2024_MMRCL_1020295_1 |
|
Reference Number |
N2-035/C-11/2024 |
| Tender Fee | 1.18 Lakh |
| EMD | 5.05 Crore |
| Tender Value | - |
| Place | NAGPUR |
| Link |
View Original Tender Notice
www.metrorailnagpur.com https://mahatenders.gov.in |
| Start Date | March 29, 2024 16:30 |
| End Date |
Expired
09/04/2024
Expired 919 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Part design and construction of elevated viaduct, at-grade viaduct, sidings, elevated ramps, entry/exit line to depot, and ten elevated station and one at grade station including civil works excluding architectural finishes and peb of mrts phase-iv.
Part design and construction of elevated viaduct, at-grade viaduct, sidings, elevated ramps, entry/exit line to depot, and ten elevated station and one at grade station including civil works excluding architectural finishes and peb of mrts phase-iv.
Read morePart design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.
Part design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.
Read moreConstruction of viaduct and elevated stations of gurugram metro rail limited
Construction of viaduct and elevated stations from sector 9 metro station (exclusive) to cyber city metro station (inclusive) of gurugram metro corridor between millennium city centre and cyber city, gurugram, india.
Read moreDdc for design of 25 kv overhead equipment (ohe) system for the elevated line, power supply and scada for both underground and elevated lines including checking of design of receiving substations and design validation of jaipur metro phase-2 project.
Ddc for design of 25 kv overhead equipment (ohe) system for the elevated line, power supply and scada for both underground and elevated lines including checking of design of receiving substations and design validation of jaipur metro phase-2 project.
Read moreDesign and construction of elevated viaduct twin tunnel by shield tbm cut and cover tunnel mid ventilation cum emergency egress shaft crosspassages ramps two underground stations bengali chauraha and palasia chauraha including architectural finishing
Design and construction of elevated viaduct twin tunnel by shield tbm cut and cover tunnel mid ventilation cum emergency egress shaft crosspassages ramps two underground stations bengali chauraha and palasia chauraha including architectural finishing
Read moreDdc for design of 25 kv overhead equipment (ohe) system, power supply and scada for the elevated lines including checking of design of receiving substations and design validation of dmrc phase-iv project.
Ddc for design of 25 kv overhead equipment (ohe) system, power supply and scada for the elevated lines including checking of design of receiving substations and design validation of dmrc phase-iv project.
Read moreEngagement of detailed design consultant for structural design works for central vista depot (adjoining line-8 majlis park station) at grade and at elevated level and miscellaneous associated allied structural design works, for delhi mrts phase-v.
Engagement of detailed design consultant for structural design works for central vista depot (adjoining line-8 majlis park station) at grade and at elevated level and miscellaneous associated allied structural design works, for delhi mrts phase-v.
Read moreDesign, manufacture, supply, testing, commissioning of passenger rs, machinery and plant, training of personnel, camc for 15 years of rs for nmrp ph-ii and pmrp ph-ii (e-w extension) and conversion of 3 car trainset of pune metro to 6 car trainsets.
Design, manufacture, supply, testing, commissioning of passenger rs, machinery and plant, training of personnel, camc for 15 years of rs for nmrp ph-ii and pmrp ph-ii (e-w extension) and conversion of 3 car trainset of pune metro to 6 car trainsets.
Read moreActivity based maintenance contract of ohe and psi for 90 tkm main line and depot ohe, 37 station ass and 2 depot ass, 2 rss, 2 tss and 23 switching stations of nmrp of maha-metro for 1 year extendable up to 1 year.
Activity based maintenance contract of ohe and psi for 90 tkm main line and depot ohe, 37 station ass and 2 depot ass, 2 rss, 2 tss and 23 switching stations of nmrp of maha-metro for 1 year extendable up to 1 year.
Read moreMaintenance contract for controlling leakage and seepage in underground section including tunnel/viaduct, station building, ancillary building, staff qtrs, depot, rss and other associate buildings and maintenance of drainage system of viaduct of...
Maintenance contract for controlling leakage and seepage in underground section including tunnel/viaduct, station building, ancillary building, staff qtrs, depot, rss and other associate buildings and maintenance of drainage system of viaduct of...
Read moreof your Industry type