Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Renewal Work With General Repair In Km 1, 2, 10, 11, 12, 13 (800), 15, 16, 17 Of Gursarai Month (Other District Road) In District Jhansi
|
Description |
Renewal Work With General Repair In Km 1, 2, 10, 11, 12, 13 (800), 15, 16, 17 Of Gursarai Month (Other District Road) In District Jhansi
|
Organisation | Chief Engineer Jhansi Zone PWD Jhansi UP | State Govt. and UT |
Tender Id | 2025_CEJNS_1011531_6 |
Reference Number |
1585/ 44 C- Jhansi Circle/2024 Date 25.02.2025 |
Tender Fee | 3650 |
EMD | 5.5 Lakh |
Tender Value | |
Place | Jhansi |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1815808 |
Start Date | February 27, 2025 17:30 |
End Date |
05/03/2025 ( Expired 122 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Operation routine maintenance repair and periodic renewal work of two lane with paved shoulder of raisinghnagar poogal section (101.000 to design ch. 263.460) (l162.46 km) in rajasthan (pkg2) on performance based maintenance contracts (pbmc) mode
Operation routine maintenance repair and periodic renewal work of two lane with paved shoulder of raisinghnagar poogal section (101.000 to design ch. 263.460) (l162.46 km) in rajasthan (pkg2) on performance based maintenance contracts (pbmc) mode
Read moreUnder infrastructure fund talpura road housing development scheme in jhansi district repair strengthening work of roads in jhansi rcc drain construction work behind paramedical boundary wall in nagar nigam jhansi mauja scheme no 3 road strengthening
Under infrastructure fund talpura road housing development scheme in jhansi district repair strengthening work of roads in jhansi rcc drain construction work behind paramedical boundary wall in nagar nigam jhansi mauja scheme no 3 road strengthening
Read moreBalance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Read moreConstruction of 98.0 m 2-span steel truss bridge over abohar branch rd-180265 feet on link road jagraon to hathur to dallah, mallah, chakkar road t-01 from km. 0.000 to km. 24.580 under pmgsy-lll batch-3 in district ludhiana. package no. pb-10-135a
Construction of 98.0 m 2-span steel truss bridge over abohar branch rd-180265 feet on link road jagraon to hathur to dallah, mallah, chakkar road t-01 from km. 0.000 to km. 24.580 under pmgsy-lll batch-3 in district ludhiana. package no. pb-10-135a
Read moreSpecial repair of various modernization of link roads in mc bhadaur mehal kalan compaction of earth work to 20mm thick open graded pc with seal coat and const of cults side drain and road struct. distt. barnala work code bnl-25-025 time 08 month
Special repair of various modernization of link roads in mc bhadaur mehal kalan compaction of earth work to 20mm thick open graded pc with seal coat and const of cults side drain and road struct. distt. barnala work code bnl-25-025 time 08 month
Read moreConstruction of 4-lane rob between km 55/17-55/19 and 55/18-55/20 of railway line to connect phase-1 and phase-2 in gajraula industrial area in district amroha (u.p.)
Construction of 4-lane rob between km 55/17-55/19 and 55/18-55/20 of railway line to connect&#x0d phase-1 and phase-2 in gajraula industrial area in district amroha (u.p.)&#x0d
Read moreReconstruction of slab culvert with 1 vent of 5.00m span at km 2/4 of ballikurava to meet nh5 road in bapatla district
Reconstruction of slab culvert with 1 vent of 5.00m span at km 2/4 of ballikurava to meet nh5 road in bapatla district
Read moreReconstruction of slab culvert with 1 vent of 3.00 m span at km 3/4 of nh.5 to nagandla road in bapatla district
Reconstruction of slab culvert with 1 vent of 3.00 m span at km 3/4 of nh.5 to nagandla road in bapatla district
Read moreReconstruction of slab culvert with 1 vent of 5.00m span at km 1/4 of ballikurava to meet nh5 road in bapatla district
Reconstruction of slab culvert with 1 vent of 5.00m span at km 1/4 of ballikurava to meet nh5 road in bapatla district
Read moreStrenthing work on manasa morvan road in km 16/2-17/2-,20/10-22/2 length 2.195 km dn. neemuch
Strenthing work on manasa morvan&#x0d road in km 16/2-17/2-,20/10-22/2 length&#x0d 2.195 km dn. neemuch&#x0d &#x0d
Read moreof your Industry type