Tender Details

Particulars Details
Title
Construction Of 98.0 M 2 Span Steel Truss Bridge Over Abohar Branch Rd 180265 Feet On Link Road Jagraon To Hathur To Dallah, Mallah, Chakkar Road T 01 From Km. 0.000 To Km. 24.580 Under Pmgsy Lll Batch 3 In District Ludhiana. Package No. Pb 10 135 A
Description
Construction Of 98.0 M 2 Span Steel Truss Bridge Over Abohar Branch Rd 180265 Feet On Link Road Jagraon To Hathur To Dallah, Mallah, Chakkar Road T 01 From Km. 0.000 To Km. 24.580 Under Pmgsy Lll Batch 3 In District Ludhiana. Package No. Pb 10 135 A
Organisation National Rural Roads Development Agency (NRRDA) | Central Govt. Ministry/Department
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 50000
EMD 26.08 Lakh
Tender Value
Place MC JAGRAON
Link

AAAAAAAAAA

Login to view
Start Date June 27, 2025 23:30
End Date

28/07/2025 ( 30 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of 98.0 m 2-span steel truss bridge over abohar branch rd-180265 feet on link road jagraon to hathur to dallah, mallah, chakkar road t-01 from km. 0.000 to km. 24.580 under pmgsy-lll batch-3 in district ludhiana. package no. pb-10-135a

Construction of 98.0 m 2-span steel truss bridge over abohar branch rd-180265 feet on link road jagraon to hathur to dallah, mallah, chakkar road t-01 from km. 0.000 to km. 24.580 under pmgsy-lll batch-3 in district ludhiana. package no. pb-10-135a

Read more
Const of 41.90 m span bridge 5-span 8.38m each at rd 1665 m on link road tr 08 kheowali dhab to kabulshah to ramkot to sugar mill nh 07 widening of existing bridge under pmgsy iii batch -3 year 2024-25 district fazilka package no pb-19-313 a

Const of 41.90 m span bridge 5-span 8.38m each at rd 1665 m on link road tr 08 kheowali dhab to kabulshah to ramkot to sugar mill nh 07 widening of existing bridge under pmgsy iii batch -3 year 2024-25 district fazilka package no pb-19-313 a

Read more
20 mtr 2 span hi level bridge over pavitter bein crossing link road tanda sri hargobindpur road to sh_22 to ghoreshawan km 2.950 at feroze raulian

20 mtr 2 span hi level bridge over pavitter bein crossing link road tanda sri hargobindpur road to sh_22 to ghoreshawan km 2.950 at feroze raulian

Read more
Construction of high level bridge 2 span 9.0m each effective over kairon drain on link road patti to harike khalra road via kulla manihala jai singh at rd 3200 m including approaches and di pb-22-027a pmgsy-iii in distt. tarn taran

Construction of high level bridge 2 span 9.0m each effective over kairon drain on link road patti to harike khalra road via kulla manihala jai singh at rd 3200 m including approaches and di pb-22-027a pmgsy-iii in distt. tarn taran

Read more
Construction of 42a0 m single span steel bridge over bhakhra main line at rd 510690 feet on lr mandvi to maha singh wala upto guru teg bahadur marg via ramgarh gujjran, bhamniwala at km 4/980 under package no. pb 17-316a block andana distt. sangrur

Construction of 42a0 m single span steel bridge over bhakhra main line at rd 510690 feet on lr mandvi to maha singh wala upto guru teg bahadur marg via ramgarh gujjran, bhamniwala at km 4/980 under package no. pb 17-316a block andana distt. sangrur

Read more
Construction of h.l. steel bridge single span 42m c/c of bearing over narwana branch canal at rd 11862 x-ing chanarthal kalan to gt road sadhugarh via attapur including its approaches, dismantling and 1.5m span slab culvert under pmgsy-iii (batch-1)

Construction of h.l. steel bridge single span 42m c/c of bearing over narwana branch canal at rd 11862 x-ing chanarthal kalan to gt road sadhugarh via attapur including its approaches, dismantling and 1.5m span slab culvert under pmgsy-iii (batch-1)

Read more
Construction of high level bridge (2x15m), over ubdc falling on mehta shri hargobindpur road to bolewal via talwandi at rd 3750 mtr in district gurdaspur under scheme pmgsy phase iii batch iii

Construction of high level bridge (2x15m), over ubdc falling on mehta shri hargobindpur road to bolewal via talwandi at rd 3750 mtr in district gurdaspur under scheme pmgsy phase iii batch iii

Read more
1. c/o 22.00 meter single span rcc t-beam bridge over kishori nallah at km. 2/110 on link road main road to bhilali trilokinath lobber udaipur road km. 0/000 to 13/970 under pmgsy-iii batch-i package no.hp-07-158

C/o 22.00 meter single span rcc t-beam bridge over mooring nallah at km. 10/445 on link road main road to bhilali trilokinath lobber udaipur road km. 0/000 to 13/970 under pmgsy-iii batch-i package no.hp-07-158 c

Read more
Construction of high level bridge (2x15m), over ubdc falling on road pantori to batala shri hargobindpur road ladha munda kohali (pb06112) at rd 2540 mtr in district gurdaspur under scheme pmgsy iii batch iii

Construction of high level bridge (2x15m), over ubdc falling on road pantori to batala shri hargobindpur road ladha munda kohali (pb06112) at rd 2540 mtr in district gurdaspur under scheme pmgsy iii batch iii

Read more
Construction of 110 mtr span double lane motorable bridge over river beas at pandoh on pandoh nagdhar road at rd 0/150 (under pmgsy-iii, batch-i) (package no. hp-08-570).

Construction of 110 mtr span double lane&#x0d motorable bridge over river beas at pandoh on pandoh&#x0d nagdhar road at rd 0/150 (under pmgsy-iii, batch-i)&#x0d (package no. hp-08-570).

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise