Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of 4 Lane Rob Between Km 55/17 55/19 And 55/18 55/20 Of Railway Line To Connect Phase 1 And Phase 2 In Gajraula Industrial Area In District Amroha (U.P.)
|
| Description |
Construction Of 4 Lane Rob Between Km 55/17 55/19 And 55/18 55/20 Of Railway Line To Connect&Amp#X0d
Phase 1 And Phase 2 In Gajraula Industrial Area In District Amroha (U.P.)&Amp#X0d
|
| Organisation | UP STATE BRIDGE CORPORATION LIMITED | State Govt. and UT |
| Tender Id | 2025_UPSBC_1053291_1 |
|
Reference Number |
1232/30ET/GM(Gzb)/2025 |
| Tender Fee | 20000 |
| EMD | 72.8 Lakh |
| Tender Value | |
| Place | Gajraula Industrial Area in District Amroha (U.P.) |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1915257 |
| Start Date | July 01, 2025 20:00 |
| End Date |
Expired
21/07/2025
Expired 337 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Providing and fixing of 1.5 tr capacity split type air conditioners in the office of aam citco dispensary industrial area phase 1, u.t., chandigarh
Providing and fixing of 1.5 tr capacity split type air conditioners in the office of aam citco dispensary industrial area phase 1, u.t., chandigarh
Read moreHyderabad division: sw(i) sc-mue section: proposed construction of 2 lane rob in lieu of lc no.180 at rly km 422/1-2 of span 1x36.00 m composite girder between dab-bsx stations on mue-sc section of hyb division - deposit work sw(ii) hyb div: sc-mue section: proposed construction of 2 lane rob at rly km 418/0-1 of span 1x36.00 m composite girder between kek- dab stations on mue-sc section on sh/mdr at km 1002.9 at atkur side road bypass near dharmabad-deposit work. - electrical trd arrang
For complete deion and other details, please refer to tender
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreConstruction of 4-lane rob between km 55/17-55/19 and 55/18-55/20 of railway line to connect phase-1 and phase-2 in gajraula industrial area in district amroha (u.p.)
Construction of 4-lane rob between km 55/17-55/19 and 55/18-55/20 of railway line to connect phase-1 and phase-2 in gajraula industrial area in district amroha (u.p.)
Read moreConstruction of 2 lane rob with approaches in lieu of lc no. 22 at km 17/1-2 between barhan-etah section on prayagraj division of north central railway
Construction of 2 lane rob with approaches in lieu of lc no. 22 at km 17/1-2 between barhan-etah section on prayagraj division of north central railway
Read moreConstruction of 2 lane rob at level crossing no. 34-a of north central railway on prayagraj mugalsari rail section at railway km.815/19-21 in between karchhana-chhiwaki railway station in district prayagraj.
Construction of 2 lane rob at level crossing no. 34-a of north central railway on prayagraj mugalsari rail section at railway km.815/19-21 in between karchhana-chhiwaki railway station in district prayagraj.
Read moreConstruction of rob at km 1/2 of mannarai - thottimannarai road in lieu of existing lc.no.131 at railway km 438/4-6 in between uthukuli and tiruppur railway stations.
Construction of rob at km 1/2 of mannarai - thottimannarai road in lieu of existing lc.no.131 at railway km 438/4-6 in between uthukuli and tiruppur railway stations
Read moreConstruction of 2 lane rob at lc no 215 between panposh kalunga station excluding the railway portion of span 1 x 18 plus 1 x 62
Construction of 2 lane rob at lc no 215 between panposh kalunga station excluding the railway portion of span 1 x 18 plus 1 x 62
Read moreGnt division - 1) rebuilding of 2 lane rob with 3 lane rob at railway km 20/2-3 between vejendla -manipuram block cabine station of tenali - guntur section on existing rob on chilakaluripeta-vijayawada section of nh-16 2)construction of new rob at km 128/3-4 between nadikudi -macherla section and 3)construction of new rob at km 120/14-15 between nadikudi -macherla section - ohe modifications.
For complete deion and other details, please refer to tender
Read moreConstruction of rcc stair case of two nos. rob 2 lane rob in lieu of railway crossing no. 75-a of northern railway on prayag-lucknow rail section at railway km. 149 /10-11 in between prayag-phaphamau railway station and rob in lieu of railway cross
Construction of rcc stair case of two nos. rob 2 lane rob in lieu of railway crossing no. 75-a of northern railway on prayag-lucknow rail section at railway km. 149 /10-11 in between prayag-phaphamau railway station and rob in lieu of railway cross
Read moreof your Industry type