Particulars | Details |
---|---|
Title |
Augmentation Of Power Transformer Capacity From Existing 1 X501 X31.5 Mva To 1 X502 X31.5 Mva With Additional Bay At 132 Kv Ss Rompicherla In O And M Circle Tirupathi
|
Description |
Augmentation Of Power Transformer Capacity From Existing 1 X501 X31.5 Mva To 1 X502 X31.5 Mva With Additional Bay At 132 Kv Ss Rompicherla In O And M Circle Tirupathi
|
Organisation | Information Technology, Electronics and Communications Andhra Pradesh | State Govt. and UT |
Tender Id | 748715 |
Reference Number |
APT-e-08(CE/Zone/Kadapa)/2024-25 |
Tender Fee | 2128 |
EMD | 1.2 Lakh |
Tender Value | |
Place | AP |
Link | https://tender.apeprocurement.gov.in |
Start Date | August 18, 2024 00:30 |
End Date |
23/08/2024 ( Expired 294 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreConst. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read moreDesign, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Read moreLandslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreUpgradation to two lane with paved shoulder from design ch km 118.813 to 148.810 and km 155.0 to 165.082 bagasara to thangalol section of nh351 in the state of gujarat package iv on epc mode
Upgradation to two lane with paved shoulder from design ch km 118.813 to 148.810 and km 155.0 to 165.082 bagasara to thangalol section of nh351 in the state of gujarat package iv on epc mode
Read moreDesign and construction of property development buildings in land parcels at existing mandaveli bus depot and terminus including civil, architectural finishes, plumbing, e and m, hvac, lifts and all associated works
Design and construction of 
 property development buildings in land parcels at existing mandaveli bus 
 depot and terminus including civil, architectural finishes, plumbing, e and m, 
 hvac, lifts and all associated works