Particulars | Details |
---|---|
Title |
Estimate For Birfurcation Of 03 Km 11 Kv Line From Malkjara To Rajapipariya With 01 No. Bay With Vcb Under Chandone D/C Of O N M Dn. Pipariya
|
Description |
Estimate For Birfurcation Of 03 Km 11 Kv Line From Malkjara To Rajapipariya With 01 No. Bay With Vcb Under Chandone D/C Of O N M Dn. Pipariya
|
Organisation | Madhya Pradesh Madhya Kshetra Vidyut Vitaran Company Limited | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 1475 |
EMD | 17000 |
Tender Value | |
Place | Pipariya |
Link |
AAAAAAAAAA Login to view |
Start Date | July 04, 2025 00:00 |
End Date |
14/07/2025 ( 10 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConst. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read moreCarrying out tests on completion and during mntnance pd using nsv, fwd, mbiu, retro-reflectometer etc for a-p rd section of nh-144a ex ch from km 85.385 to km 102.000 (design chainage km 74.350 to km 90.150) (pkg-iv) d in jk (ut) under 35 tf/(
Carrying out tests on completion and during mntnance pd using nsv, fwd, mbiu, retro-reflectometer etc for a-p rd section of nh-144a ex ch from km 85.385 to km 102.000 (design chainage km 74.350 to km 90.150) (pkg-iv) d in jk (ut) under 35 tf/(
Read moreConsultancy services for supervision consultants of operation and maintenance of two lane with paved shoulder of thanjavur to perambalur section from km 6.000 to km 74.912 of nh-136 (old no. nh-226e) in the state of tamil nadu
Consultancy services for supervision consultants of operation and maintenance of two lane with paved shoulder of thanjavur to perambalur section from km 6.000 to km 74.912 of nh-136 (old no. nh-226e) in the state of tamil nadu
Read moreWidening of exist 2lane to 4 lane divided carriageway with paved shoulder from km 0.000 near deshgaon to km 51.579 (ex km 77.500 on sh26)of nh 347b near dewalgaon (l51.579kms)under nh(o) in madhya pradesh on ham
Widening of exist 2lane to 4 lane divided carriageway with paved shoulder from km 0.000 near deshgaon to km 51.579 (ex km 77.500 on sh26)of nh 347b near dewalgaon (l51.579kms)under nh(o) in madhya pradesh on ham
Read moreWidening of exist. 2lane to 4lane divided carriageway with paved shoulder from km 51.579 ex km 77.500 on sh26 near dewalgaon to km 108.643 km 129.900 on nh52 of nh 347b near julwaniya l57.064kms under nh(o) in madhya pradesh on ham
Widening of exist. 2lane to 4lane divided carriageway with paved shoulder from km 51.579 ex km 77.500 on sh26 near dewalgaon to km 108.643 km 129.900 on nh52 of nh 347b near julwaniya l57.064kms under nh(o) in madhya pradesh on ham
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Read moreSs of c/sand (dry) for pmt wks of constr/ imprvt of rd hangu- chor ii to nhsl (ps) spfcn from km 0.00 to km 4.00 through dept exec mode under 130 rcc/ 764 brtf (p) swtk in the state of sikkim, job no. 307/04
Ss of c/sand (dry) for pmt wks of constr/ imprvt of rd hangu- chor ii to nhsl (ps) spfcn from km 0.00 to km 4.00 through dept exec mode under 130 rcc/ 764 brtf (p) swtk in the state of sikkim, job no. 307/04
Read moreConstruction of 98.0 m 2-span steel truss bridge over abohar branch rd-180265 feet on link road jagraon to hathur to dallah, mallah, chakkar road t-01 from km. 0.000 to km. 24.580 under pmgsy-lll batch-3 in district ludhiana. package no. pb-10-135a
Construction of 98.0 m 2-span steel truss bridge over abohar branch rd-180265 feet on link road jagraon to hathur to dallah, mallah, chakkar road t-01 from km. 0.000 to km. 24.580 under pmgsy-lll batch-3 in district ludhiana. package no. pb-10-135a