| Particulars | Details |
|---|---|
| Title |
Widening Of Exist. 2lane To 4lane Divided Carriageway With Paved Shoulder From Km 51.579 Ex Km 77.500 On Sh26 Near Dewalgaon To Km 108.643 Km 129.900 On Nh52 Of Nh 347 B Near Julwaniya L57.064kms Under Nh(o) In Madhya Pradesh On Ham
|
| Description |
Widening Of Exist. 2lane To 4lane Divided Carriageway With Paved Shoulder From Km 51.579 Ex Km 77.500 On Sh26 Near Dewalgaon To Km 108.643 Km 129.900 On Nh52 Of Nh 347 B Near Julwaniya L57.064kms Under Nh(o) In Madhya Pradesh On Ham
|
| Organisation | National Highways Authority of India | Public Sector Undertakings |
| Tender Id | 2025_NHAI_226518_1 |
|
Reference Number |
MPDIV-21017/13/ 2025-MP Division/DJ-2 |
| Tender Fee | 1.1 Lakh |
| EMD | 10.75 Crore |
| Tender Value | |
| Place | NHAI HQ |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=253924 |
| Start Date | February 12, 2025 22:00 |
| End Date |
Expired
04/08/2025
Expired 325 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreWidening of exist 2lane to 4 lane divided carriageway with paved shoulder from km 0.000 near deshgaon to km 51.579 (ex km 77.500 on sh26)of nh 347b near dewalgaon (l51.579kms)under nh(o) in madhya pradesh on ham
Widening of exist 2lane to 4 lane divided carriageway with paved shoulder from km 0.000 near deshgaon to km 51.579 (ex km 77.500 on sh26)of nh 347b near dewalgaon (l51.579kms)under nh(o) in madhya pradesh on ham
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreUp-gradation of existing 2 lane to 4 lane with paved shoulder from deshgaon to julwaniya section of nh-347b from design km 0.000 existing km 99.924 on nh-347bg to design km 108.643 (ex km 129.900 on nh-52) under nh(o) in madhya pradesh on ham
Up-gradation of existing 2 lane to 4 lane with paved shoulder from deshgaon to julwaniya section of nh-347b from design km 0.000 existing km 99.924 on nh-347bg to design km 108.643 (ex km 129.900 on nh-52) under nh(o) in madhya pradesh on ham
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Read moreCs for preparation of dpr for widening of exist 2lane with paved shoulder to 4lane with paved shoulder from km 0.00 sitarganj to km 52.200 tanakpur of nh125 new nh 09 in uttarakhand.
Cs for preparation of dpr for widening of exist 2lane with paved shoulder to 4lane with paved shoulder from km 0.00 sitarganj to km 52.200 tanakpur of nh125 new nh 09 in uttarakhand.
Read moreWidening of the exis.2lane paved shoulder sec of nh716 frm tn/ap border(ex ch km.338.030/ch km61.510)to puttu (ch km.318.000/ch km81.540) to 4lane paved shoulder(des.l 20.030 km) n widening of the existing 4lane paved shoulder sec of nh71
Widening of the exis.2lane paved shoulder sec of nh716 frm tn/ap border(ex ch km.338.030/ch km61.510)to puttu (ch km.318.000/ch km81.540) to 4lane paved shoulder(des.l 20.030 km) n widening of the existing 4lane paved shoulder sec of nh71
Read moreConstruction of two lane with paved shoulder from design km 45.325 (ex km 48.870) near basinda village to design km 90.010 (ex km 97.903) near roshni village section of nh-347b of betul-khandwa package-2 in the state of madhya on ham
Construction of two lane with paved shoulder from design km 45.325 (ex km 48.870) near basinda village to design km 90.010 (ex km 97.903) near roshni village section of nh-347b of betul-khandwa package-2 in the state of madhya on ham
Read moreConstruction of two lane with paved shoulder from design km 0.000 near hiwarkhedi village junction on nh-47 to design km 45.440 near basinda village section of nh-347b of betul-khandwa package 1 in the state of madhya pradesh on ham.
Construction of two lane with paved shoulder from design km 0.000 near hiwarkhedi village junction on nh-47 to design km 45.440 near basinda village section of nh-347b of betul-khandwa package 1 in the state of madhya pradesh on ham.
Read moreof your Industry type