Tender Details

Particulars Details
Title
Up Gradation Of Existing 2 Lane To 4 Lane With Paved Shoulder From Deshgaon To Julwaniya Section Of Nh 347 B From Design Km 0.000 Existing Km 99.924 On Nh 347 Bg To Design Km 108.643 (Ex Km 129.900 On Nh 52) Under Nh(o) In Madhya Pradesh On Ham
Description
Up Gradation Of Existing 2 Lane To 4 Lane With Paved Shoulder From Deshgaon To Julwaniya Section Of Nh 347 B From Design Km 0.000 Existing Km 99.924 On Nh 347 Bg To Design Km 108.643 (Ex Km 129.900 On Nh 52) Under Nh(o) In Madhya Pradesh On Ham
Organisation National Highways Authority of India | Public Sector Undertakings
Tender Id 2025_NHAI_242181_1
Reference
Number
MPDIV-21017/ 38/2025-MP Division
Tender Fee 1.7 Lakh
EMD 16.24 Crore
Tender Value -
Place NHAI HQ
Link
View Original Tender Notice

https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=276280

Start Date July 22, 2025 23:10
End Date
Expired 09/10/2025

Expired 371 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Widening and upgradation of existing highway from khagaria (design ch. 270.000) to purnea (design ch. 413.529) section of nh 31 and nh 231 to 4 lane with paved shoulders under nh (o) on bot (toll) in the state of bihar (2 nd call)

Widening and upgradation of existing highway from khagaria (design ch. 270.000) to purnea (design ch. 413.529) section of nh 31 and nh 231 to 4 lane with paved shoulders under nh (o) on bot (toll) in the state of bihar (2 nd call)

Read more
Widening and strengthening of single and intermediate lane to 2 lane with paved shoulder from existing chainage (km 53.873 to km 59.700) design chainage (km 33.565 to km 38.943) (design length 5.378 km) on nh-507 in the state of uttarakhand

Widening and strengthening of single and intermediate lane to 2 lane with paved shoulder from existing chainage (km 53.873 to km 59.700) design chainage (km 33.565 to km 38.943) (design length 5.378 km) on nh-507 in the state of uttarakhand

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 0.000 to km 77.102 (chitrakoot majhgawan satna section) of nh 135bg (design length 77.102 km) under nh(o) in the state of uttar pradesh and madhya pradesh on ham

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 0.000 to km 77.102 (chitrakoot majhgawan satna section) of nh 135bg (design length 77.102 km) under nh(o) in the state of uttar pradesh and madhya pradesh on ham

Read more
Upgradation of existing two- lane with paved shoulders carriageway of nagaur-bikaner section of nh-62 from design km 161/000 to km 270/245 to four lane with paved shoulder in state of rajasthan on bot (toll) mode

Upgradation of existing two- lane with paved shoulders carriageway of nagaur-bikaner section of nh-62 from design km 161/000 to km 270/245 to four lane with paved shoulder in state of rajasthan on bot (toll) mode

Read more
Ie services for const of 6l gf ac indore eastern bypass starting from design km 64.000 near pirkaradiya vill and ending at design km 113.000 on nh 347bg near vill simrol datoda pkg1 of indore n dewas district in mp on ham mode l 49.00 km

Ie services for const of 6l gf ac indore eastern bypass starting from design km 64.000 near pirkaradiya vill and ending at design km 113.000 on nh 347bg near vill simrol datoda pkg1 of indore n dewas district in mp on ham mode l 49.00 km

Read more
Construction of four-lane access control arwal bypass from km 54.200 to km 66.500 (design ch. 67.680) of existing nh-139 on naubatpur- hariharganj road in the state of bihar under epc mode.

Construction of four-lane access control arwal bypass from km 54.200 to km 66.500 (design ch. 67.680) of existing nh-139 on naubatpur- hariharganj road in the state of bihar under epc mode.

Read more
Consultancy services for authority s engineer for supervision of construction of 4 lane access controlled bypass to tiruvannamalai town starting from design km 135.796 of nh-234 (km 75.150 of new nh-38) and ending at design km 158.506 of nh-234(km 88

Consultancy services for authority s engineer for supervision of construction of 4 lane access controlled bypass to tiruvannamalai town starting from design km 135.796 of nh-234 (km 75.150 of new nh-38) and ending at design km 158.506 of nh-234(km 88

Read more
Consultancy services for preparation of detailed project report for 4 lane access controlled development of existing 4-lane from solapur to sangareddy section of nh-65 (length 246km).

Consultancy services for preparation of detailed project report for 4 lane access controlled development of existing 4-lane from solapur to sangareddy section of nh-65 (length 246km).

Read more
Upgradation to two lane with paved shoulder of porbandar bhanvad jamjodhpur kalavad section of nh-151k from design km 0.000 to design km 119.500 in the state of gujarat on ham.

Upgradation to two lane with paved shoulder of porbandar bhanvad jamjodhpur kalavad section of nh-151k from design km 0.000 to design km 119.500 in the state of gujarat on ham.

Read more
One time improvement work of shahdol city portion to 2 lane with paved shoulders between existing km 132/500 (design km 0/00) to km 141/300 (design km 8.80) (length 8.80 km) on katni shahdol road section of nh-43 in the state of madhya pradesh.

One time improvement work of shahdol city portion to 2 lane with paved shoulders between existing km 132/500 (design km 0/00) to km 141/300 (design km 8.80) (length 8.80 km) on katni shahdol road section of nh-43 in the state of madhya pradesh.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise