Tender Details

Particulars Details
Title

AAAAAAAAAA

Login to view
Description
Chandpara Palla Road From Ch. 0.00 Kmp To Ch. 3.40 Kmp, Except From Ch.1.157 Km To Ch. 1.249 Km And From Ch. 1.593 Km To Ch. 1.664 Km, Emergent Patch Repairing Work In Stretches Under Bongaon Highway Sub Division Of Barasat Highway Division No. Ii,
Organisation PUBLIC WORKS DEPARTMENT | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 0
EMD 9990
Tender Value
Place Gaighata Highway Section
Link

AAAAAAAAAA

Login to view
Start Date July 02, 2025 15:30
End Date

12/07/2025 ( 10 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of road changlangshu village to yongkhao village from km 0.00 to km 24.900 ( net length 24.900 km) to nhsl specification under 100 rcc /15 brtf/ project sewak in nagaland state under epc mode

Construction of road changlangshu village to yongkhao village from km 0.00 to km 24.900 ( net length 24.900 km) to nhsl specification under 100 rcc /15 brtf/ project sewak in nagaland state under epc mode

Read more
Construction of road from wangti (chenloisio) zero point to ib junction (bp 151) from km 0.00 to km 11.00 to nhsl specifications under 100/15 brtf/(p) sewak in nagaland state under epc mode

Construction of road from wangti (chenloisio) zero point to ib junction (bp 151) from km 0.00 to km 11.00 to nhsl specifications under 100/15 brtf/(p) sewak in nagaland state under epc mode

Read more
Ss of c/sand (dry) for pmt wks of constr/ imprvt of rd hangu- chor ii to nhsl (ps) spfcn from km 0.00 to km 4.00 through dept exec mode under 130 rcc/ 764 brtf (p) swtk in the state of sikkim, job no. 307/04

Ss of c/sand (dry) for pmt wks of constr/ imprvt of rd hangu- chor ii to nhsl (ps) spfcn from km 0.00 to km 4.00 through dept exec mode under 130 rcc/ 764 brtf (p) swtk in the state of sikkim, job no. 307/04

Read more
Construction of 98.0 m 2-span steel truss bridge over abohar branch rd-180265 feet on link road jagraon to hathur to dallah, mallah, chakkar road t-01 from km. 0.000 to km. 24.580 under pmgsy-lll batch-3 in district ludhiana. package no. pb-10-135a

Construction of 98.0 m 2-span steel truss bridge over abohar branch rd-180265 feet on link road jagraon to hathur to dallah, mallah, chakkar road t-01 from km. 0.000 to km. 24.580 under pmgsy-lll batch-3 in district ludhiana. package no. pb-10-135a

Read more

Begunkodar-jhalda road from 0.00 kmp to 4.00 kmp, repairing work with premix surfacing and seal coat in stretches under purulia highway division in the district of purulia.

Read more
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Read more
Cement concrete work on road and maintenon road level with main road in place of damaged road from krishna dairy to a.g. 152 in ward no. 29 under zone no. 07

Cement concrete work on road and maintenon road level with main road in place of damaged road from krishna dairy to a.g. 152 in ward no. 29 under zone no. 07

Read more
Old nh 34 road - stregthening work

Old nh 34 road - stregthening work - from 95.10 kmp to 97.80 kmp and 111.90 kmp to 112.40 kmp effective length - 2310.00 m under nadia division, p.w.d. in the district of nadia, west bengal

Read more

Installation of speed breaker with informatory boards of sarishahat nainan road under falta epz highway sub-division in the district of south 24 parganas during the year 2025-2026 (balance work).

Read more
Constr of new rd nelya dhaula (pkg/02) to nhsl specifications from km 12.00 to km 41.691 with link rd 0.00 to 2.775 (bhawani post) (net length 32.467 km) in the state of arunachal pradesh under 127 rcc/ 42 brtf project vartak (gs icbr ii)

Constr of new rd nelya dhaula (pkg/02) to nhsl specifications from km 12.00 to km 41.691 with link rd 0.00 to 2.775 (bhawani post) (net length 32.467 km) in the state of arunachal pradesh under 127 rcc/ 42 brtf project vartak (gs icbr ii)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise