Tender Details
Particulars | Details |
---|---|
Title |
Engagement Of User Fee Agency On The Basis Of Cb Through E Tender Bhitaha Fp At Design Km 201.150 For The Use Of 4 And More Lane Of Varanasi To Gorakhpur Section From Km. 149.540 To Km.215.160 Of Nh 29 In Uttar Pradesh
|
Description |
Engagement Of User Fee Agency On The Basis Of Cb Through E Tender Bhitaha Fp At Design Km 201.150 For The Use Of 4 And More Lane Of Varanasi To Gorakhpur Section From Km. 149.540 To Km.215.160 Of Nh 29 In Uttar Pradesh
|
Organisation | National Highways Authority of India | Public Sector Undertakings |
Tender Id | 2025_NHAI_231852_1 |
Reference Number |
NHAI/13013/547/ CO/25-26/CB/Bhitah FP |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | NHAI HQ |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=261825 |
Start Date | April 02, 2025 18:30 |
End Date |
15/04/2025 ( Expired 5 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreConstruction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)
Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)
Read moreWidening/re-construction to two lane with paved shoulder of nh-143ag from km 37.400 (design chainage) to km 85.560 (design chainage) bero-khunti section in the state of jharkhand on epc mode for the fy 2023-24
Widening/re-construction to two lane with paved shoulder of nh-143ag from km 37.400 (design chainage) to km 85.560 (design chainage) bero-khunti section in the state of jharkhand on epc mode for the fy 2023-24
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Read moreValuation of affected structures falling within row for six laning of etawah chakeri section from km.
Valuation of affected structures falling within row for six laning of etawah chakeri section from km.
 323.475 to 483.687 in district kanpur nagar kanpur dehat auraiya and etawah of nh 19 in the state of
 uttar pradesh
Read moreConstruction of 4-lane with paved shoulder of ferozepur bypass from existing km/design km. 212.500 to existing km 229.690 (design chainage km 231.270) section of nh-354 on epc mode in the state of punjab
Construction of 4-lane with paved shoulder of ferozepur bypass from existing km/design km. 212.500 to existing km 229.690 (design chainage km 231.270) section of nh-354 on epc mode in the state of punjab
Read moreRehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.
Rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.
Read moreRehabilitation and upgradation of kolde kalamba to visarwadi nh-6 nandurbar state highway design ch. km 50.200 to km 56.800 62.400 to 100.400 nh section nh752-g to two lane with paved shoulder 4 lane in the state of maharashtra on epc mode
Rehabilitation and upgradation of kolde kalamba to visarwadi nh-6 nandurbar state highway design ch. km 50.200 to km 56.800 62.400 to 100.400 nh section nh752-g to two lane with paved shoulder 4 lane in the state of maharashtra on epc mode.
Read moreUpgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Read moreof your Industry type