Tender Details
Particulars | Details |
---|---|
Title |
General Sabarimala Work 2024 25 Upgradation With Bm Bc 7.500km General Improvements To Nariyampara Kalthotty Vellilamkandom Kizhakkemattukkatta Chembalam Road At 0 000 To 5 500 And Nariyampara Melekanchiyar Road Ch.0 000 To 2 000
|
Description |
The Following Items Were Proposed In The Estimate.Dismantling The Existing Wearing Coat ,Clearing Light Jungles Etc. Earth Work Excavation For Widening And Berm Removal Etc. Construction Of Sub Base ,Base And Shoulder Includes Gsb For Widening ,Wmm
|
Organisation | PWD | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 13010 |
EMD | 2 Lakh |
Tender Value | |
Place | Nariyampara Kalthotty Vellilamkandom Kizhakkematt |
Link |
AAAAAAAAAA Login to view |
Start Date | May 29, 2025 23:30 |
End Date |
13/06/2025 ( 12 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)
Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)
Read moreWidening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge
Widening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge
Read moreConstruction of embankment, dredging of nayanjuli, walking pathway, plantation, bio diversity park along with fencing work at debi ghat at ch 0.50 of kazi nazrul islam avenue of v.i.p road under barasat highway division no.-i in the district of north
Construction of embankment, dredging of nayanjuli, walking pathway, plantation, bio diversity park fencing work at debi ghat at ch 0.50 of kazi nazrul islam avenue of v.i.p road under bhd no.-i in n 24pgs ei work for compound illu and beau.
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreWidening and improvement of shangshak-tengnoupal road pkg-3 (from km. 78.250 to km. 126.250) of nh-102a into 2 lane with hard shoulder in the state of manipur under annual plan 2024-25 through epc mode (job no. 102a/mn/2024-25/42)
Widening and improvement of shangshak-tengnoupal road pkg-3 (from km. 78.250 to km. 126.250) of nh-102a into 2 lane with hard shoulder in the state of manipur under annual plan 2024-25 through epc mode (job no. 102a/mn/2024-25/42)
Read moreOne time improvement of bypassed stretches from km 0 700 to 2 700 km 4 300 to 5 600 km 6 000 to 7 500 of maharashtra state border to bodhan section of nh63 extended in the state of telangana
One time improvement of bypassed stretches from km 0 700 to 2 700 km 4 300 to 5 600 km 6 000 to 7 500 of maharashtra state border to bodhan section of nh63 extended in the state of telangana
Read moreSitc of dewatering pump, invertor with battery, cleaning of outlet chamber for primary clarifier no. 2, laying of new pvc pipe line from rotameter outlet to cct tank and other work at 80 mld dinapur stp, varanasi.
Sitc of dewatering pump, invertor with battery, cleaning of outlet chamber for primary clarifier no. 2, laying of new pvc pipe line from rotameter outlet to cct tank and other work at 80 mld dinapur stp, varanasi.
Read moreUpgradation of rural road from bakultala junction to shyamkund at rangat north and middle andaman under pmgsy-iii batch-i, 2024-25.
Upgradation of rural road from bakultala junction to shyamkund at rangat north and middle andaman under pmgsy-iii batch-i, 2024-25.
Read moreWbpwd(r)/se/ chc/nit-01/ 25-26/1 / kandi bharatpur salar road from ch. 9.544 km to 10.644 km, widening and strengthening work under murshidabad highway division ii in the district of murshidabad, project id pd252632356s000.
Kandi bharatpur salar road from ch. 9.544 km to 10.644 km, widening and strengthening work under murshidabad highway division ii in the district of murshidabad, project id pd252632356s000.
Read moreUpgradation of rural road from nh-04 to nimbutala ward no. 3 at rangat, north and middle andaman under pmgsy-iii, batch-i 2024-25 - recall
Upgradation of rural road from nh-04 to nimbutala ward no. 3 at rangat, north and middle andaman under pmgsy-iii, batch-i 2024-25 - recall
Read moreof your Industry type