Tender Details

Particulars Details
Title
Independent Engineer Services During Om Phase For 4 Lane With Paved Shoulder Configuration Of Pathrapali To Katghora From Km 53.300 To Km 92.600 Package 2 Section Of Nh 130 In The State Of Chhattisgarh Under Bharatmala On Hybrid Annuity Mode
Description
Independent Engineer Services During Om Phase For 4 Lane With Paved Shoulder Configuration Of Pathrapali To Katghora From Km 53.300 To Km 92.600 Package 2 Section Of Nh 130 In The State Of Chhattisgarh Under Bharatmala On Hybrid Annuity Mode
Organisation National Highways Authority of India | Public Sector Undertakings
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 5000
EMD 0
Tender Value
Place Korba
Link

AAAAAAAAAA

Login to view
Start Date January 27, 2025 23:30
End Date

27/02/2025 ( 21 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Consultancy services for authoritys engineer for supervision of rehabilitation and upgradation to four lane with paved shoulder configuration from km 24-350 to km 61-875 (jawale - borgaon kale) of nh-63 in the state of maharashtra on epc mode.

Consultancy services for authoritys engineer for supervision of rehabilitation and upgradation to four lane with paved shoulder configuration from km 24-350 to km 61-875 (jawale - borgaon kale) of nh-63 in the state of maharashtra on epc mode.

Read more
Supervision consultancy services (sc) for opetation and maintenance of davulapalli - markapuram - vaggampalle section from km 154.900 to 293.266 of 2-lane paved shoulder configuration of nh 565 in the state of andhra pradesh on pbmc mode.

Supervision consultancy services (sc) for opetation and maintenance of davulapalli - markapuram - vaggampalle section from km 154.900 to 293.266 of 2-lane paved shoulder configuration of nh 565 in the state of andhra pradesh on pbmc mode.

Read more
Upgradation to two lane with paved shoulder configuration from km0.000 to km 62.822 (limbdi - dharangadhra) of nh-51 in the state of gujarat on hybrid annuity mode (ham) (total length- 62.822 km).

Upgradation to two lane with paved shoulder configuration from km0.000 to km 62.822 (limbdi - dharangadhra) of nh-51 in the state of gujarat on hybrid annuity mode (ham) (total length- 62.822 km).

Read more
Consultancy services for independent engineer for supervision of construction of four lane access controlled highway from vakalapudi light house to annavaram on nh-16 section of nh-516f from km. 0 plus 000 to km. 40 plus 621 on ham under bharatmala p

Consultancy services for independent engineer for supervision of construction of four lane access controlled highway from vakalapudi light house to annavaram on nh-16 section of nh-516f from km. 0 plus 000 to km. 40 plus 621 on ham under bharatmala p

Read more
Construction of 4-lane with paved shoulder of ferozepur bypass from existing km/design km. 212.500 to existing km 229.690 (design chainage km 231.270) section of nh-354 on epc mode in the state of punjab

Construction of 4-lane with paved shoulder of ferozepur bypass from existing km/design km. 212.500 to existing km 229.690 (design chainage km 231.270) section of nh-354 on epc mode in the state of punjab

Read more
Balance work of construction of two lane with paved shoulder configuration of kawai bypass of nh-752 from km 41 . 560 to 50 . 650 (design ch 0 . 000 to 8 . 700) on epc mode under annual plan 2024-25 in the state of rajasthan.

Balance work of construction of two lane with paved shoulder configuration of kawai bypass of nh-752 from km 41 . 560 to 50 . 650 (design ch 0 . 000 to 8 . 700) on epc mode under annual plan 2024-25 in the state of rajasthan.

Read more
Widening to 4 lane of nh-20 (old nh-75e) from km 16.400 to km 47.700 (tupudana to kundibartoli) in the state of jharkhand (total length 31.300 km) on hybrid annuity mode.

Widening to 4 lane of nh-20 (old nh-75e) from km 16.400 (design chainage) to km&#x0d 47.700 (design chainage(tupudana to&#x0d kundibartoli) in the state of jharkhand&#x0d (total length 31.300 km) on hybrid annuity&#x0d mode.&#x0d

Read more
Construction of four lane with paved shoulder of bhagalpur kharhara village (dhaka more) from km 0.000 to km 36.600 (total length 36.600 km) of nh-133e in the state of bihar on epc mode

Construction of four lane with paved shoulder of bhagalpur kharhara village (dhaka more) from km 0.000 to km 36.600 (total length 36.600 km) of nh-133e in the state of bihar on epc mode

Read more
Ie services for 4-lane unnao-lalganj section of nh-232a (nh-31) from design km 00.000 to design km 70.000 under bharatmala pariyojana on hybrid annuity mode in the state of uttar pradesh 3rd call

Ie services for 4-lane unnao-lalganj section of nh-232a (nh-31) from design km 00.000 to design km 70.000 under bharatmala pariyojana on hybrid annuity mode in the state of uttar pradesh 3rd call

Read more
Operation and maintenance of two lane with paved with shoulder of gulabpura to uniara section of nh 148d from km 69.267 to km 282.936 length 203.977 in state of rajasthan

Operation and maintenance of two lane with paved with shoulder of gulabpura to uniara section of nh 148d from km 69.267 (at junction of nh-79) to km 282.936 (at junction of nh 552) (length 203.977) in state of rajasthan

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise