Tender Details

Particulars Details
Title
Independent Engineer Services During O And M Phase For 4 Lane With Paved Shoulder Configuration Of Bilaspur To Pathrapali From Km 0.000 To Km 53.300 Package 1 Section Of Nh 111 New Nh 130 In The State Of Chhattisgarh Under Bharatmala On Hybrid Annu
Description
Independent Engineer Services During O And M Phase For 4 Lane With Paved Shoulder Configuration Of Bilaspur To Pathrapali From Km 0.000 To Km 53.300 Package 1 Section Of Nh 111 New Nh 130 In The State Of Chhattisgarh Under Bharatmala On Hybrid Annu
Organisation Central Public Procurement Portal 2
Tender Id 2023_NHAI_157063_1
Reference
Number
11052/RO-raipur/Tender/O and M/BP
Tender Fee 5000
EMD 1
Tender Value -
Place RO-Raipur
Link
View Original Tender Notice

https://etenders.gov.in

Start Date June 10, 2023 22:50
End Date
Expired 20/07/2023

Expired 1187 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Construction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 77.000 (near village prithvipur) to km 116.200 (mp/up border near village barahi) of nh-719 in madhya pradesh on hybrid annuity mode (package2).

Construction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 77.000 (near village prithvipur) to km 116.200 (mp/up border near village barahi) of nh-719 in madhya pradesh on hybrid annuity mode (package2).

Read more
Construction of the lonar bypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode

Construction of the lonarbypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode

Read more
Construction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 0.000 (tansen chowk purani chhawani gwalior) to km 77.000 (near village prithvipur) of nh719 in madhya pradesh on hybrid annuity mode (package1).

Construction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 0.000 (tansen chowk purani chhawani gwalior) to km 77.000 (near village prithvipur) of nh719 in madhya pradesh on hybrid annuity mode (package1).

Read more
Upgradation to 4 lane with paved shoulders with divided carriageway from design km 0.000 to km 37.087 of pardi nh 48 junction sukesh nanapondha kaprada section of nh 848 in the state of gujarat on hybrid annuity mode.

Upgradation to 4 lane with paved shoulders with divided carriageway from design km 0.000 to km 37.087 of pardi nh 48 junction sukesh nanapondha kaprada section of nh 848 in the state of gujarat on hybrid annuity mode.

Read more
Balance work of rehabilitation and up-gradation to 2 lane road with paved shoulders configuration for pacharal mandangad mhapral rajewadi section of nh-965dd upto junction of nh-66 ch 22700 m to ch 75100 m and ambadave connector spur connecting

Balance work of rehabilitation and up-gradation to 2 lane road with paved shoulders configuration for pacharal mandangad mhapral rajewadi section of nh-965dd upto junction of nh-66 ch 22700 m to ch 75100 m and ambadave connector spur connecting

Read more
Consultancy services of independent engineer services for widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode in the state of odisha

Consultancy services of independent engineer services for widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode in the state of odisha

Read more
Rehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km

Rehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km

Read more
Widening and upgradation of sirmour (keoti) to kalwari section of nh-135bd from ch 10/070 to 35/920 (length 25.85 km) to 2-lane with paved shoulder configuration in the state of madhya pradesh

Widening and upgradation of sirmour (keoti) to kalwari section of nh-135bd from ch 10/070 to 35/920 (length 25.85 km) to 2-lane with paved shoulder configuration in the state of madhya pradesh

Read more
Upgradation to four lane with paved shoulders of sadhuwali-banwala section from design km. 00.000 to km. 42.900 of nh-954 and banwala-hanumangarh section from design km 42.900 to km 68.140 of nh-54 in the state of rajasthan on hybrid annuity mode

Upgradation to four lane with paved shoulders of sadhuwali-banwala section from design km. 00.000 to km. 42.900 of nh-954 and banwala-hanumangarh section from design km 42.900 to km 68.140 of nh-54 in the state of rajasthan on hybrid annuity mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise