Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Independent Engineer Services During O And M Phase For 4 Lane With Paved Shoulder Configuration Of Bilaspur To Pathrapali From Km 0.000 To Km 53.300 Package 1 Section Of Nh 111 New Nh 130 In The State Of Chhattisgarh Under Bharatmala On Hybrid Annu
|
Description |
Independent Engineer Services During O And M Phase For 4 Lane With Paved Shoulder Configuration Of Bilaspur To Pathrapali From Km 0.000 To Km 53.300 Package 1 Section Of Nh 111 New Nh 130 In The State Of Chhattisgarh Under Bharatmala On Hybrid Annu
|
Organisation | Central Public Procurement Portal 2 |
Tender Id | 2023_NHAI_157063_1 |
Reference Number |
11052/RO-raipur/Tender/O and M/BP |
Tender Fee | 5000 |
EMD | 1 |
Tender Value | |
Place | RO-Raipur |
Link | https://etenders.gov.in |
Start Date | June 10, 2023 22:50 |
End Date |
20/07/2023 ( Expired 701 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreConstruction of four lane with paved shoulder of bhagalpur kharhara village (dhaka more) from km 0.000 to km 36.600 (total length 36.600 km) of nh-133e in the state of bihar on epc mode
Construction of four lane with paved shoulder of bhagalpur kharhara village (dhaka more) from km 0.000 to km 36.600 (total length 36.600 km) of nh-133e in the state of bihar on epc mode
Read moreUpgradation to two lane with paved shoulder from design ch km 118.813 to 148.810 and km 155.0 to 165.082 bagasara to thangalol section of nh351 in the state of gujarat package iv on epc mode
Upgradation to two lane with paved shoulder from design ch km 118.813 to 148.810 and km 155.0 to 165.082 bagasara to thangalol section of nh351 in the state of gujarat package iv on epc mode
Read moreConstruction of 05 nos. of foot over bridge (fob) in bilaspur-pathrapali (km 0.000 to 53.300 km) section of nh-111 (new nh-130) in the state of chhattisgarh
Construction of 05 nos. of foot over bridge (fob) in bilaspur-pathrapali (km 0.000 to 53.300 km) section of nh-111 (new nh-130) in the state of chhattisgarh
Read moreConsultancy services for independent engineer during onm of 4laning from km 0.000 to km 26.400 along with 0.700km approach towards nh207 with interchange on nh4 at point) of bangalore to malur section pkg1 from km 26.400 to km 53.500 of malur t
Consultancy services for independent engineer during onm of 4laning from km 0.000 to km 26.400 along with 0.700km approach towards nh207 with interchange on nh4 at point) of bangalore to malur section pkg1 from km 26.400 to km 53.500 of malur t
Read moreIndependent engineer services during oandm period for four laning of rajauli - bakhtiyarpur section of nh - 31 (new nh-20) from km. 54.405 to km 101.630 (package - ii) and 101.630 to 152.520 (package iii) on ham mode in the state of bihar.
Independent engineer services during oandm period for four laning of rajauli - bakhtiyarpur section of nh - 31 (new nh-20) from km. 54.405 to km 101.630 (package - ii) and 101.630 to 152.520 (package iii) on ham mode in the state of bihar.
Read moreIndependent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Read moreof your Industry type