Tender Details

Particulars Details
Title
Maintenance Of Horticulture Work In Medicity, New Chandigarh (01.06.2026 To 31.03.2027)
Description
Maintenance Of Horticulture Work In Medicity, New Chandigarh (01.06.2026 To 31.03.2027)
Organisation Department of Housing and Urban Development | State Govt. and UT
Tender Id 2026_DHUD_167708_1
Reference
Number
GMADA/DE(H-2)/226-231 dated 05.05.2026
Tender Fee 7690
EMD 1.54 Lakh
Tender Value -
Place GMADA
Link
View Original Tender Notice

https://eproc.punjab.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=340926

Start Date May 06, 2026 17:30
End Date
Expired 20/05/2026

Expired 144 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Cc divn-annual maintenance contract for 3nos parr make bomb calorimeters model 6200 from issue of service purchase order to 31.03.2027

Cc divn-annual maintenance contract for 3nos parr make bomb calorimeters model 6200 from issue of service purchase order to 31.03.2027

Read more
Tggenco ytps be1 collection and testing of oil samples pertaining to bm-i division from actual date of commencement of work to 31.03.2027

Tggenco ytps be1 collection and testing of oil samples pertaining to bm-i division from actual date of commencement of work to 31.03.2027

Read more
Ktps vii stage- adm-it- telecom-comprehensive annual maintenance contract(camc) charges for progility make epabx from the date of issue of po to 31.03.2027

Ktps vii stage- adm-it- telecom-comprehensive annual maintenance contract(camc) charges for progility make epabx from the date of issue of po to 31.03.2027

Read more
District level tender for procurement and supply of red gram dal to 706 anganwadi centres of peddapalli district through csts application, for a period up to 31.03.2027

District level tender for procurement and supply of red gram dal to 706 anganwadi centres of peddapalli district through csts application, for a period up to 31.03.2027

Read more
Construction of parking shed (tubular structure) in front of college building at college of horticulture, rajendranagar

Construction of parking shed (tubular structure) in front of college building at college of horticulture, rajendranagar

Read more
Tggenco- ytps(5x800mw)-stage-1-unit-2-carrying out breakdown maintenance of gates and dampers in unit-ii boiler flue gas and air path as and when required from the actual date of commencement to 31.03.2027.

Tggenco- ytps(5x800mw)-stage-1-unit-2-carrying out breakdown maintenance of gates and dampers in unit-ii boiler flue gas and air path as and when required from the actual date of commencement to 31.03.2027.

Read more
Carrying out breakdown maintenance of gates and dampers in unit 3 boiler flue gas and air path as and when required from the actual date of commencement of work to 31.03.2027 for the fy 2026-27

Carrying out breakdown maintenance of gates and dampers in unit 3 boiler flue gas and air path as and when required from the actual date of commencement of work to 31.03.2027 for the fy 2026-27

Read more
Btps-chp-reconditioning and hard facing of suspension center and end discs for ring granulator-2 and 4 of chp, btps from 01.08.2026 or actual date of commencement of work to 31.03.2027 as and when required in mm-ii subdivision of mm/chp/btps.

Btps-chp-reconditioning and hard facing of suspension center and end discs for ring granulator-2 and 4 of chp, btps from 01.08.2026 or actual date of commencement of work to 31.03.2027 as and when required in mm-ii subdivision of mm/chp/btps.

Read more
Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027

Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027

Read more
Tggenco (5x800mw) ytps scc circle stage-i carrying out stage-i unit-1 and 2 water and steam sample collection, bringing the samples to the laboratory , topping up of chemical dosing tanks, cpu regeneration plant works and dm plant works etc for the period from 01.10.2026 or from the date of commencement of work to 31.03.2027 for the fy 2026-27 of ytps (5x800mw), veerlapalem(v), dameracherla (m), nalgonda(d).

Tggenco (5x800mw) ytps scc circle stage-i carrying out stage-i unit-1 and 2 water and steam sample collection, bringing the samples to the laboratory , topping up of chemical dosing tanks, cpu regeneration plant works and dm plant works etc for the period from 01.10.2026 or from the date of commencement of work to 31.03.2027 for the fy 2026-27 of ytps (5x800mw), veerlapalem(v), dameracherla (m), nalgonda(d).

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise