Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Maintenance Of Horticulture Work In Medicity, New Chandigarh (01.06.2026 To 31.03.2027)
|
| Description |
Maintenance Of Horticulture Work In Medicity, New Chandigarh (01.06.2026 To 31.03.2027)
|
| Organisation | Department of Housing and Urban Development | State Govt. and UT |
| Tender Id | 2026_DHUD_167708_1 |
|
Reference Number |
GMADA/DE(H-2)/226-231 dated 05.05.2026 |
| Tender Fee | 7690 |
| EMD | 1.54 Lakh |
| Tender Value | - |
| Place | GMADA |
| Link |
View Original Tender Notice
https://eproc.punjab.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=340926 |
| Start Date | May 06, 2026 17:30 |
| End Date |
Expired
20/05/2026
Expired 144 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Cc divn-annual maintenance contract for 3nos parr make bomb calorimeters model 6200 from issue of service purchase order to 31.03.2027
Cc divn-annual maintenance contract for 3nos parr make bomb calorimeters model 6200 from issue of service purchase order to 31.03.2027
Read moreTggenco ytps be1 collection and testing of oil samples pertaining to bm-i division from actual date of commencement of work to 31.03.2027
Tggenco ytps be1 collection and testing of oil samples pertaining to bm-i division from actual date of commencement of work to 31.03.2027
Read moreKtps vii stage- adm-it- telecom-comprehensive annual maintenance contract(camc) charges for progility make epabx from the date of issue of po to 31.03.2027
Ktps vii stage- adm-it- telecom-comprehensive annual maintenance contract(camc) charges for progility make epabx from the date of issue of po to 31.03.2027
Read moreDistrict level tender for procurement and supply of red gram dal to 706 anganwadi centres of peddapalli district through csts application, for a period up to 31.03.2027
District level tender for procurement and supply of red gram dal to 706 anganwadi centres of peddapalli district through csts application, for a period up to 31.03.2027
Read moreConstruction of parking shed (tubular structure) in front of college building at college of horticulture, rajendranagar
Construction of parking shed (tubular structure) in front of college building at college of horticulture, rajendranagar
Read moreTggenco- ytps(5x800mw)-stage-1-unit-2-carrying out breakdown maintenance of gates and dampers in unit-ii boiler flue gas and air path as and when required from the actual date of commencement to 31.03.2027.
Tggenco- ytps(5x800mw)-stage-1-unit-2-carrying out breakdown maintenance of gates and dampers in unit-ii boiler flue gas and air path as and when required from the actual date of commencement to 31.03.2027.
Read moreCarrying out breakdown maintenance of gates and dampers in unit 3 boiler flue gas and air path as and when required from the actual date of commencement of work to 31.03.2027 for the fy 2026-27
Carrying out breakdown maintenance of gates and dampers in unit 3 boiler flue gas and air path as and when required from the actual date of commencement of work to 31.03.2027 for the fy 2026-27
Read moreBtps-chp-reconditioning and hard facing of suspension center and end discs for ring granulator-2 and 4 of chp, btps from 01.08.2026 or actual date of commencement of work to 31.03.2027 as and when required in mm-ii subdivision of mm/chp/btps.
Btps-chp-reconditioning and hard facing of suspension center and end discs for ring granulator-2 and 4 of chp, btps from 01.08.2026 or actual date of commencement of work to 31.03.2027 as and when required in mm-ii subdivision of mm/chp/btps.
Read moreBtps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Read moreTggenco (5x800mw) ytps scc circle stage-i carrying out stage-i unit-1 and 2 water and steam sample collection, bringing the samples to the laboratory , topping up of chemical dosing tanks, cpu regeneration plant works and dm plant works etc for the period from 01.10.2026 or from the date of commencement of work to 31.03.2027 for the fy 2026-27 of ytps (5x800mw), veerlapalem(v), dameracherla (m), nalgonda(d).
Tggenco (5x800mw) ytps scc circle stage-i carrying out stage-i unit-1 and 2 water and steam sample collection, bringing the samples to the laboratory , topping up of chemical dosing tanks, cpu regeneration plant works and dm plant works etc for the period from 01.10.2026 or from the date of commencement of work to 31.03.2027 for the fy 2026-27 of ytps (5x800mw), veerlapalem(v), dameracherla (m), nalgonda(d).
Read moreof your Industry type