Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Tggenco Ytps(5x800 Mw) Stage 1 Unit 2 Carrying Out
Breakdown Maintenance Of Gates And Dampers In Unit Ii Boiler Flue
Gas And Air Path As And When Required From The Actual Date Of
Commencement To 31.03.2027.
|
| Description |
Tggenco Ytps(5x800 Mw) Stage 1 Unit 2 Carrying Out
Breakdown Maintenance Of Gates And Dampers In Unit Ii Boiler Flue
Gas And Air Path As And When Required From The Actual Date Of
Commencement To 31.03.2027.
|
| Organisation | TELANGANA POWER GENERATION CORPORATION LIMITED-Chief Engineer Civil Construction YTPS |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | - |
| EMD | - |
| Tender Value | 9.85 Lakh |
| Place | Telangana |
| Link | Login to view |
| Start Date | October 09, 2026 23:30 |
| End Date |
Closing soon
15/10/2026
0 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Tggenco ytps be1 collection and testing of oil samples pertaining to bm-i division from actual date of commencement of work to 31.03.2027
Tggenco ytps be1 collection and testing of oil samples pertaining to bm-i division from actual date of commencement of work to 31.03.2027
Read moreTggenco-ytps(5x800mw)-supply of solenoid valves and associated spares
Tggenco-ytps(5x800mw)-supply of solenoid valves and associated spares
Read moreTggenco-ytps(5x800mw)-em-stage-i-supply of terminal blocks,overload relays
Tggenco-ytps(5x800mw)-em-stage-i-supply of terminal blocks,overload relays
Read moreTggenco-ytps(5x800mw)-switchyard transformer yard division-testing of transformer oil samples of various power transformers as and when required during the fy 2026-27
Tggenco-ytps(5x800mw)-switchyard transformer yard division-testing of transformer oil samples of various power transformers as and when required during the fy 2026-27
Read moreTggenco-ytps(5x800mw)-c and i divisions-stage-i-supply of solenoid valves for hag, cag, mdv and aph air motor
Tggenco-ytps(5x800mw)-c and i divisions-stage-i-supply of solenoid valves for hag, cag, mdv and aph air motor
Read moreTggenco - ytps (5x800mw) comprehensive operation and maintenance of the railway siding (ytpv), track maintenance, locomotives, signal and transmission including tand p and consumables.
Tggenco - ytps (5x800mw) comprehensive operation and maintenance of the railway siding (ytpv), track maintenance, locomotives, signal and transmission including tand p and consumables.
Read moreTggenco-ytps(5x800mw)-bop-iii-supply of grinder housing of clinker grinders and air cylinder(14 inche bore x 38 inche stroke) assemblies of feed gates for bottom ash hopper in ash handling system.
Tggenco-ytps(5x800mw)-bop-iii-supply of grinder housing of clinker grinders and air cylinder(14 inche bore x 38 inche stroke) assemblies of feed gates for bottom ash hopper in ash handling system.
Read moreBtps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Read moreTggenco - rts-b- providing of insurance coverage for the operational, non-operational and store items and obsolete spares and burglary including theft policy for plant assets of 1x62.5 mw- rts-b unit, ramagundam for a period of one year from the actual date of commencement of insurance coverage
Tggenco - rts-b- providing of insurance coverage for the operational, non-operational and store items and obsolete spares and burglary including theft policy for plant assets of 1x62.5 mw- rts-b unit, ramagundam for a period of one year from the actual date of commencement of insurance coverage
Read moreTggenco-ytps(5x800mw)
Tggenco-ytps (5x800 mw) -conducting dgps survey/ets survey and fixing the h.f.l of vagu with rcc precast boundary poles along thungapadu vagu on either banks of vagu within the main plant boundary area of ytps (5x800 mw) at veerlapalem (v), dameracherla (m), nalgonda district.
Read moreof your Industry type