Tender Details

Particulars Details
Title
Tggenco Ytps(5x800 Mw) Stage 1 Unit 2 Carrying Out Breakdown Maintenance Of Gates And Dampers In Unit Ii Boiler Flue Gas And Air Path As And When Required From The Actual Date Of Commencement To 31.03.2027.
Description
Tggenco Ytps(5x800 Mw) Stage 1 Unit 2 Carrying Out Breakdown Maintenance Of Gates And Dampers In Unit Ii Boiler Flue Gas And Air Path As And When Required From The Actual Date Of Commencement To 31.03.2027.
Organisation TELANGANA POWER GENERATION CORPORATION LIMITED-Chief Engineer Civil Construction YTPS
Tender Id Login to view
Reference
Number
Login to view
Tender Fee -
EMD -
Tender Value 9.85 Lakh
Place Telangana
Link Login to view
Start Date October 09, 2026 23:30
End Date
Closing soon 15/10/2026

0 days left

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Tggenco ytps be1 collection and testing of oil samples pertaining to bm-i division from actual date of commencement of work to 31.03.2027

Tggenco ytps be1 collection and testing of oil samples pertaining to bm-i division from actual date of commencement of work to 31.03.2027

Read more
Tggenco-ytps(5x800mw)-supply of solenoid valves and associated spares

Tggenco-ytps(5x800mw)-supply of solenoid valves and associated spares

Read more
Tggenco-ytps(5x800mw)-em-stage-i-supply of terminal blocks,overload relays

Tggenco-ytps(5x800mw)-em-stage-i-supply of terminal blocks,overload relays

Read more
Tggenco-ytps(5x800mw)-switchyard transformer yard division-testing of transformer oil samples of various power transformers as and when required during the fy 2026-27

Tggenco-ytps(5x800mw)-switchyard transformer yard division-testing of transformer oil samples of various power transformers as and when required during the fy 2026-27

Read more
Tggenco-ytps(5x800mw)-c and i divisions-stage-i-supply of solenoid valves for hag, cag, mdv and aph air motor

Tggenco-ytps(5x800mw)-c and i divisions-stage-i-supply of solenoid valves for hag, cag, mdv and aph air motor

Read more
Tggenco - ytps (5x800mw) comprehensive operation and maintenance of the railway siding (ytpv), track maintenance, locomotives, signal and transmission including tand p and consumables.

Tggenco - ytps (5x800mw) comprehensive operation and maintenance of the railway siding (ytpv), track maintenance, locomotives, signal and transmission including tand p and consumables.

Read more
Tggenco-ytps(5x800mw)-bop-iii-supply of grinder housing of clinker grinders and air cylinder(14 inche bore x 38 inche stroke) assemblies of feed gates for bottom ash hopper in ash handling system.

Tggenco-ytps(5x800mw)-bop-iii-supply of grinder housing of clinker grinders and air cylinder(14 inche bore x 38 inche stroke) assemblies of feed gates for bottom ash hopper in ash handling system.

Read more
Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027

Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027

Read more
Tggenco - rts-b- providing of insurance coverage for the operational, non-operational and store items and obsolete spares and burglary including theft policy for plant assets of 1x62.5 mw- rts-b unit, ramagundam for a period of one year from the actual date of commencement of insurance coverage

Tggenco - rts-b- providing of insurance coverage for the operational, non-operational and store items and obsolete spares and burglary including theft policy for plant assets of 1x62.5 mw- rts-b unit, ramagundam for a period of one year from the actual date of commencement of insurance coverage

Read more
Tggenco-ytps(5x800mw)

Tggenco-ytps (5x800 mw) -conducting dgps survey/ets survey and fixing the h.f.l of vagu with rcc precast boundary poles along thungapadu vagu on either banks of vagu within the main plant boundary area of ytps (5x800 mw) at veerlapalem (v), dameracherla (m), nalgonda district.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise