Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Btps Chp Reconditioning And Hard Facing Of Suspension Center And End Discs For Ring Granulator 2 And 4 Of Chp, Btps From 01.08.2026 Or Actual Date Of Commencement Of Work To 31.03.2027 As And When Required In Mm Ii Subdivision Of Mm/Chp/Btps.
|
| Description |
Btps Chp Reconditioning And Hard Facing Of Suspension Center And End Discs For Ring Granulator 2 And 4 Of Chp, Btps From 01.08.2026 Or Actual Date Of Commencement Of Work To 31.03.2027 As And When Required In Mm Ii Subdivision Of Mm/Chp/Btps.
|
| Organisation | TELANGANA POWER GENERATION CORPORATION LIMITED-CE CONSTRUCTION BTPS |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | - |
| EMD | - |
| Tender Value | 8.92 Lakh |
| Place | Telangana |
| Link | Login to view |
| Start Date | September 21, 2026 21:00 |
| End Date |
Closing soon
13/10/2026
2 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Read moreTggenco ytps be1 collection and testing of oil samples pertaining to bm-i division from actual date of commencement of work to 31.03.2027
Tggenco ytps be1 collection and testing of oil samples pertaining to bm-i division from actual date of commencement of work to 31.03.2027
Read moreTggenco- ytps(5x800mw)-stage-1-unit-2-carrying out breakdown maintenance of gates and dampers in unit-ii boiler flue gas and air path as and when required from the actual date of commencement to 31.03.2027.
Tggenco- ytps(5x800mw)-stage-1-unit-2-carrying out breakdown maintenance of gates and dampers in unit-ii boiler flue gas and air path as and when required from the actual date of commencement to 31.03.2027.
Read moreCarrying out breakdown maintenance of gates and dampers in unit 3 boiler flue gas and air path as and when required from the actual date of commencement of work to 31.03.2027 for the fy 2026-27
Carrying out breakdown maintenance of gates and dampers in unit 3 boiler flue gas and air path as and when required from the actual date of commencement of work to 31.03.2027 for the fy 2026-27
Read moreTggenco - btps - adm - providing of 1 no. ac sel car [ not less than 10years as on 31.03.2026] for official utilization of dycca/btps from 01.04.2026 (or) date of commencement to 31.03.2027
Tggenco - btps - adm - providing of 1 no. ac sel car (not less than 10years as on 31.03.2026) including driver and maintenance charges, road tax insurance etc., 12 hrs per day for a mileage of 3000km per month for official utilization of dycca/btps from 01.04.2026 (or) date of commencement to 31.03.2027.
Read moreTggenco-ytps-up keeping of toilets, urinals and maintenance of sewage pipe line and manholes at office sheds and store office building at ytps from 01.04.2026 or actual date of commencement of work to 31.03.2027.
Tggenco-ytps-up keeping of toilets, urinals and maintenance of sewage pipe lines and manholes at various locations in office sheds and store office building of yadadri thermal power station, at veerlapalem(v), dameracherla(m) in nalgonda dist from 01.04.2026 or actual date of commencement of work to 31.03.2027
Read moreKtps vi stage cam transportation of fly ash and wet ash from various locations in ash handling system by means of manual loading and disposing to ash pond or low laying areas in ktps complex as and when required during the period from 01.04.2026 or from actual date of commencement to 31.03.2027
Ktps vi stage cam transportation of fly ash and wet ash from various locations in ash handling system by means of manual loading and disposing to ash pond or low laying areas in ktps complex as and when required during the period from 01.04.2026 or from actual date of commencement to 31.03.2027
Read moreTggenco-ytps-up keeping of toilets, urinals and maintenance of sewage pipe lines and manholes at power house 1 and 2, esp control building-1 and 2 and service building 1 at ytps from 01.04.2026 or actual date of commencement of work to 31.03.2027
Tggenco-ytps(5x800mw)-up keeping of toilets, urinals and maintenance of sewage pipe lines and manholes etc at power house-1 and 2, esp control building-1 and 2 and service building-1 at yadadri thermal power station, veerlapalem (v), dameracherla (m), nalgonda district from 01.04.2026 or actual date of commencement of work to 31.03.2027.
Read moreComplete collection and preparation of coal samples for rakes received at chp/dr.nttps duly arranging the required manpower, materials, transportation as per the scope of work from 01-12-24 or from the actual date of commencement of work up to 31-03-25 or until commencement of work by new agency fixed by hq whichever is earlier
Complete collection and preparation of coal samples for rakes received at chp/dr.nttps duly arranging the required manpower, materials, transportation as per the scope of work from 01-12-24 or from the actual date of commencement of work up to 31-03-25 or until commencement of work by new agency fixed by hq whichever is earlier
Read moreCollection of coal samples at the bunkers of units 1 to 8 in operation division/ chp/ dr. nttps and preparation of laboratory sample by coning quartering method as and when required, during the period from 01.08.2025 or from the date of commencement of work to 31.03.2026 or till the exhaust of quantities.
Collection of coal samples at the bunkers of units 1 to 8 in operation division/ chp/ dr. nttps and preparation of laboratory sample by coning quartering method as and when required, during the period from 01.08.2025 or from the date of commencement of work to 31.03.2026 or till the exhaust of quantities.
Read moreof your Industry type